Kabin Buri · Prachinburi Province, Thailand

Thailand Hydromet Processing Plant

A capital-efficient, near-term revenue pathway.

We are acquiring the purpose-built hydrometallurgical plant that turns monazite concentrate into mixed rare earth chloride (MREC), the preferred feed for Western oxide separators. Construction has commenced at Kabin Buri and we are targeting commissioning and first MREC in Q2 2027.

~12,000tpaPlanned MREC output
Q2 2027Commissioning and first MREC targeted

The facility

A strategically located MREC processing plant.

Location
Kabin Buri, Thailand, 175km by road from the Laem Chabang deep-water port.
Facility
A purpose-built, modular hydrometallurgical facility.
Capacity
10,000tpa of feed into approximately 12,000tpa of MREC, around double the originally planned output.
Permitting
Revised contracting arrangements and licence amendments for the expanded capacity are under way.
Output
Mixed Rare Earth Chloride (MREC), the preferred feed for rare earth oxide separation.
Feed
Designed for monazite-bearing concentrates, giving us flexibility across multiple ore sources, including third-party feedstock.
Customers
We are in advanced discussions with oxide separation customers in the US, Europe and Asia, and strong inbound offtake interest led us to double planned capacity.
Map of Thailand showing the Kabin Buri facility, Bangkok and the Laem Chabang deep-water port, about 175km by road
Water-to-water connectivity from Australia and Africa through Laem Chabang.

The hydromet process

Seven steps from monazite to high-purity MREC.

Feedstock flexibility

Stage 1: African sourced monazite concentrates, under our framework offtake with Enuo.

Stage 2: potentially Yangibana (subject to joint venture agreement) and third-party concentrates.

  1. 01Grinding
  2. 02Caustic cracking
  3. 03Water leaching and filtration
  4. 04Acid dissolution
  5. 05Purification
  6. 06Concentration and crystallisation
  7. 07Phosphate crystallisation (trisodium phosphate by-product)
  8. OutputHigh-purity MREC in chloride form, the preferred feed for Western separators.
Thailand plant flowsheet showing the seven processing stages from monazite concentrate to MREC flake product and trisodium phosphate
Thailand plant flowsheet. Refer to our ASX announcement of 22 April 2026.

Our processing edge

Caustic crack and hydrochloric acid, not a single kiln.

Multiple parallel stirred-tank reactors give us a plant that is more flexible, more resilient and cheaper to build than a traditional sulphuric acid roast plant.

Our Thai plant (HCl)Traditional (H₂SO₄)
Primary equipmentMultiple stirred-tank reactors in parallelA single large rotary kiln
Feedstock flexibilityHigh. Parallel lines accept feed from different sources at onceLow. Optimised for one consistent concentrate
RedundancyHigh. Reactors can be serviced without a full shutdownLow. Kiln maintenance stops the whole front end
Chemical outputHigh-purity rare earth chlorideRare earth sulphate or carbonate
Capital intensityLow. Modular reactor designHigh. Significant upfront capital
~20%Price premium that MREC chloride flake commands over carbonate equivalents (SMM/Benchmark 2026). Chloride is used by oxide separators globally.
Lower opexCompetitive Thai energy, labour and reagent costs.
Container ship and cranes at a deep-water port
Laem Chabang deep-water port, 175km by road from the plant

The Thailand advantage

Fiscal and geopolitical support, with Tier-1 infrastructure.

~4xLower indicative opex than remote WA (management estimate)
Up to 13yrPotential BOI corporate tax exemption, subject to approval
175kmBy road from Laem Chabang deep-water port
2025US-Thailand Critical Minerals MOU

Tier-1 infrastructure

The Kabin Buri industrial zone gives us access to the energy grid, a skilled industrial workforce and established regional chemical supply chains.

Key port logistics

No landlocked rail risk, and established container shipping routes for feedstock in and product out.

Western-aligned supply chains

The plant aligns with the objectives of the US-Thailand Critical Minerals Cooperation MOU of October 2025, positioning us in government-backed Western supply chains.

Free trade access

Thailand's extensive FTA network positions our MREC exports to Europe and North America for potential preferential duty treatment.

On site at Kabin Buri

Early pre-commissioning works have begun.

Construction has commenced at Kabin Buri. Major plant equipment has arrived on site and the existing building is being prepared for equipment installation, as we work towards commissioning in Q2 2027.

Crane lift at the Thailand plant site
Heavy lift on site
People on site inside the plant
On site
Equipment checks on site
Equipment checks
Tanks inside the processing building
Tanks in the processing hall
Tanks staged beside the plant
Tanks staged for installation
Q1 2026Binding term sheet to acquire the Thai hydromet MREC plant
Q2 2026Enuo African monazite framework offtake
Q3 2026Construction commenced at Kabin Buri
Q2 2027Commissioning and first MREC targeted
Late 2028 to early 2029Expansion up to 36,000tpa MREC envisaged