Updated Investor Presentation
Released
Released
Announcement PDF
Yangibana Neodymium Project
Western Australia
Investors Presentation | November 2015
Yangibana
Disclaimer
All currency amounts are in AUD$ unless stated otherwise.
Disclaimer
This presentation has been prepared by Hastings Rare Metals Limited (“Company”). It does not purport to contain all the information that a prospective investor may require in connection with any potential investment in
the Company. You should not treat the contents of this presentation, or any information provided in connection with it, as financial advice, financial product advice or advice relating to legal, taxation or investment
matters.
This presentation is provided expressly on the basis that you will carry out your own independent inquiries into the matters contained in the presentation and make your own independent decisions about the affairs,
financial position or prospects of the Company. The Company reserves the right to update, amend or supplement the information at any time in its absolute discretion (without incurring any obligation to do so).
Neither the Company, nor its related bodies corporate, officers, their advisers, agents and employees accept any responsibility or liability to any person or entity as to the accuracy, completeness or reasonableness of the
information, statements, opinions or matters (express or implied) arising out of, contained in or derived from this presentation or provided in connection with it, or any omission from this presentation, nor as to the
attainability of any estimates, forecasts or projections set out in this presentation. Pursuant to the general law (whether for negligence, under statute or otherwise), or any Australian legislation or any other jurisdiction. Any
such responsibility or liability is, to the maximum extent permitted by law, expressly disclaimed and excluded. Nothing in this material should be construed as either an offer to sell or a solicitation of an offer to buy or sell
securities. It does not include all available information and should not be used in isolation as a basis to invest in the Company.
Future matters
This presentation contains reference to certain intentions, expectations, future plans, strategy and prospects of the Company. Those intentions, expectations, future plans, strategy and prospects may or may not be
achieved. They are based on certain assumptions, which may not be met or on which views may differ and may be affected by known and unknown risks. The performance and operations of the Company may be
influenced by a number of factors, many of which are outside the control of the Company. No representation or warranty, express or implied, is made by the Company, or any of its directors, officers, employees, advisers
or agents that any intentions, expectations or plans will be achieved either totally or partially or that any particular rate of return will be achieved.
Given the risks and uncertainties that may cause the Company’s actual future results, performance or achievements to be materially different from those expected, planned or intended, recipients should not place
undue reliance on these intentions, expectations, future plans, strategy and prospects. The Company does not warrant or represent that the actual results, performance or achievements will be as expected, planned or
intended.
Exploration Targets
The terms “Target” or “Exploration Target” where used in this presentation should not be misunderstood or misconstrued as an estimate of a Mineral Resource as defined in this context. Exploration Targets are conceptual
in nature, there has been insufficient exploration to define a Mineral Resource and it is uncertain further exploration will result in the determination of a Mineral Resource.
Competent Persons’ Statement
•
•
•
•
•
•
•
The information in this presentation that relates to Resources is based on information compiled by Simon Coxhell. Simon Coxhell is a consultant to the Company and a member of the
Australasian Institute of Mining and Metallurgy. The information in this presentation that relates to Exploration Results is based on information compiled by Andy Border, an employee of the
Company and a member of the Australasian Institute of Mining and Metallurgy.
Each has sufficient experience relevant to the styles of mineralisation and types of deposits which are covered in this report and to the activity which they are undertaking to qualify as a
Competent Person as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (“JORC Code”). Each consents to the
inclusion in this presentation of the matters based on his information in the form and context in which it appears.
US disclosure
This document does not constitute any part of any offer to sell, or the solicitation of an offer to buy, any securities in the United States or to, or for the account or benefit of any “US person” as defined in Regulation S under
the US Securities Act of 1993 (“Securities Act”). The Company’s shares have not been, and will not be, registered under the Securities Act or the securities laws of any state or other jurisdiction of the United States, and may
not be offered or sold in the United States or to any US person without being so registered or pursuant to an exemption from registration including an exemption for qualified institutional buyers.
2
Experienced Board & Management
Charles Lew
Tony Ho
Executive Chairman
• Private investor and entrepreneur
Non Executive Director & Chair of Audit
Committee
• Independent Director of RHB Banking
Group since 2004
• Director of Bioxyne, Greenland Minerals, and
Apollo Minerals
• 30+ years experience in investment
banking
• 35+ years in senior corporate management
with Brazin, Yates and Dolomatrix
Guy Robertson
Malcolm Mason
Chief Financial Officer &
Company Secretary
Non Executive Director
• 25+ years CFO experience
• 45+ years experience in Australian and
international exploration and mining
• Former senior finance executive with
Jardine Lloyd Thompson, Colliers,
Franklins
• Experience covers rare earths, uranium,
gold and base metals
Andy Border
Charles Tan
General Manager Exploration
Commercial Manager
• 35+ years experience as a geologist
• 20+ years in Commercial &
Procurement Management
• Mineral sands & aluminium mining
ASX Listed Stock Code: HAS
• Rare earths, copper, gold and industrial
minerals
Yangibana Project - Location
Accessible from Carnarvon
Yangibana
•
In the Gascoyne Region of
Western Australia
•
900km north of Perth
•
280km north-east of
Carnarvon
•
170km north-north-east
Gascoyne Junction
•
•
Bitumen road from
Carnarvon to Gascoyne
Junction
Shire maintained road to
southern Project boundary
Yangibana Project - Geography
•
Flat, open ground
with excellent
outcrop
•
Located on the
drainage divide
between the
Gascoyne River
system and the
Ashburton River
system to the north
•
Situated on Wanna
Pastoral Station
•
Uninhabited
5
Yangibana Project – Outcropping Ironstones
History:
•
•
•
Significant rare earths
mineralisation was intersected
at Yangibana in the 1980s by
Hurlston Pty Ltd.
Rare earths rich monazite
mineralisation located in
widespread ironstone outcrops.
Percussion drilling intersected
significant mineralisation at 12
prospects beneath ironstone
outcrops.
6
Yangibana Project - Tenements and Geology
•
Yangibana Project
controls all areas
considered to have
potential for
Yangibana-style
Neodymium rich Rare
Earths mineralisation
•
Tenements cover
650km2
•
Potential for large
scale carbonatitehosted Rare Earths
mineralisation at
depth
7
Location of Yangibana Rare Earths Prospects
8
Yangibana Project - Markets and Nd2O3-Eq
Products and Markets
•
Neodymium, Praseodymium, Dysprosium and Europium are Yangibana’s
main economic Rare Earths and Hasting’s efforts are directed to recovery
of these 4 key rare earths.
•
Neodymium and Praseodymium account for 86% of total in-ground value.
•
Our market is the rare earths magnets sector; the most important of the rare
earths market and with the greatest potential for growth
9
Yangibana Project – Neodymium The Economic Advantage
Neodymium-rich Rare Earths in the Eastern Belt
•
•
Western Belt mineralisation: Nd2O3 comprises about 18% of TREO
Eastern Belt mineralisation:
• Nd2O3 comprises about 33% of TREO at Bald Hill South and
• more than 40% at Fraser’s Deposit
•
Hydrometallurgical and refining costs are a major part of mining and processing
operating costs and directly proportional to the TREO treated
Double the neodymium content of the TREO (ie in the Monazite) doubles the
cash flow
That is a higher content of Neodymium in the Monazite means a much more
profitable operation
•
•
Eastern Belt mineralisation recognised as the main economic driver of the
Yangibana Project
10
Yangibana Project : PFS JORC Resources
PFS Resource Drilling Objective: Delineate pit optimised JORC Indicated
Resources sufficient for a proposed 1mtpa mining operation for 6-7 years
additionally supported by JORC Inferred Resources sufficient for a 15-year
mining operation
2015 Exploration drilling for the PFS concentrated on the economically
important neodymium rich Eastern Belt and on 100% owned ground to the west
of Yangibana North
Results of Resource Drilling
•
•
JORC Indicated Resources have been established at Bald Hill South, Fraser’s,
Yangibana West and Yangibana North
Hastings has tested eleven targets to date, of which eight have sufficient
drilling to enable JORC resources to be estimated
11
Yangibana Project : PFS Total JORC Resources
Resource
Category
Tonnes
%TREO
%Nd2O3-Eq
Indicated
Inferred
TOTAL
8,126,000
4,236,000
12,362,000
1.07
1.07
1.07
0.46
0.41
0.44
These resources contain 132,500 tonnes of TREO, including
33,900 tonnes of Nd2O3
8,950 tonnes of Pr2O3
590 tonnes of Dy2O3, and
920 tonnes of Eu2O3
(Global, Cut-off 0,25% Nd2O3-Eq, diluted & within wireframes)
12
Yangibana Project : PFS Bald Hill South Deposit
Plan showing Thickness x Nd2O3-Eq% contours
Mineralisation intersected over more than 1,200m strike length
Shows mineralisation
continues below a
vertical depth of 60m
13
Yangibana Project : PFS Bald Hill South Deposit
Mineralised zone continues
undiminished to the west & depth
14
Yangibana Project : PFS Yangibana West
and North Deposits
Yangibana West &
North
Thickness x Nd2O3-Eq%
contours
showing well defined
high grade shoots within
a continuous and
extensive Ironstone vein
defined by drilling over
more than 1,600m strike
length
The mineralised limits of
the vein are open in
both directions along
strike and also in depth
15
Yangibana Deposits – Resource Drilling Results
Summary
All Yangibana Deposits drilled to date have significant:
• high grade neodymium, praseodymium, dysprosium and europium
Resources
• mineralisation that is open-ended along strike and at depth
• RE Resources are amenable to low cost open pit mining operations
Conclusion
Further similar mineralisation may be expected:
• as extensions to the eight drilled deposits
• known undrilled prospects and
• beneath the extensive outcropping zones between the defined
prospects.
Further significant open-pittable resources are anticipated from future drilling
programmes
16
Yangibana Project : PFS Mining Studies
Pit Optimisations: Based on the JORC Indicated Resources, expected metallurgical
recoveries and predicted commodity prices, Snowden completed pit optimisation
at Bald Hill South, Fraser’s, Yangibana West (100% Hastings) and Yangibana North
(70% Hastings) deposits
Summary of Optimised Pits
Bald Hill South
Fraser’s
YW-YN
Total
Ore
3.00mt
0.57mt
3.51mt
7.07mt
Waste
18.91mt
11.53mt
35.85mt
66.29mt
6.3
20.3
10.2
9.4
Stripping ratio
• Almost all Indicated Resources are extracted, indicating that deposits remain
economically viable well beyond current planned final pit depths
• Hence there is scope by additional drilling along strike and at depth to increase
Resources amenable to open pitting
17
Yangibana Project : PFS Mining Studies
Ore Mined
700
Fraser’s
Total movement (kt)
600
500
400
300
200
Bald Hill South
100
0
Yangibana West & Yangibana North
1
2
3
4
5
6
7
8
9
10
11
12
13
YN
14
15
16
17
Quarter
BH
18
19
20
21
22
23
24
25
26
27
28
29
30
FR
Mine Scheduling: Studies show a superior financial outcome is generated by commencing
mining operations on the Eastern Belt
Firstly at Bald Hill South & Fraser’s prior to mining Yangibana West & Yangibana North
18
Yangibana Project : PFS Mining Studies
BALD
HILL
SOUTH
PIT
FRASER’S PIT
Optimised pits and associated
waste dump designs:
YANGIBANA WEST – YANGIBANA NORTH PITS
19
Yangibana – Metallurgical Test Work
Comminution:
• Standard tests confirm mineralisation is quite friable and significantly
different to the host granite
Beneficiation Test Work
• Gravity, magnetics, and flotation techniques all showed promise
• Flotation showing vastly superior results
Hydrometallurgical Test Work
• Caustic cracking having a well documented history in the treatment of
monazite-hosted rare earths projects has shown promising results
Refining Test Work
• Scouting tests indicate the main targets, Nd and Pr, can be readily
separated from other rare earths
20
Yangibana Project - Metallurgical Investigations
Beneficiation by Flotation: (Bench scale testing composite drill samples at 80% passing
-75micron)
Eastern Belt Deposits (Composite sample Bald Hill South & Fraser’s Deposits):
concentrate produced with an 18 times increase in TREO grade to 20.3% TREO
containing 6.9%Nd2O3 (10.5%Nd2O3-Eq), at a recovery of 80% into a mass of 5% of the
original mineralisation
Beneficiation Flowsheet: Rapid kinetics. A simple beneficiation flow sheet rougher
float, single cleaner and re-cleaner floats and low capital and operating cost
beneficiation plant
Hydrometallurgical Plant: small plant of around 50,000 tonnes per annum required
21
Beneficiation
Flotation
technique
22
Yangibana Project – Simplistic Processing Flow Sheet
23
Yangibana Project : PFS Water Resources,
Environmental & Native Title
•
Water Resources: The Company has identified sources of water of potable quality
from within existing Mining Leases sufficient to meet the long term requirements of a
one million tonne per annum mining operation.
•
Flora and Fauna studies: Consultants have completed with no issues identified
•
Native Title: There are no claims over the Yangibana Project
24
Green Solar Energy Supply to Processing Plant
• Solar Power Panels
• Chlor-Alkali Plant
25
Yangibana Project : PFS Tenement Holdings
Mining Leases
Granted (shaded in
pink) covering all of
current JORC
Resources
All applications
including
Miscellaneous and
General Purpose
Leases expected to
be granted by
March 2016
Production now only
requires compliance
with standard
regulatory processes
26
Yangibana Project - Development Timeline
4
Period Highlight:
Yangibana Project Development
Timeline
2015 (Qs)
1
Prefeasibility Study
2
3
Plan
Actual
% Complete
Actual (beyond plan)
2016 (Qs)
4
5
6
7
% Complete (beyond plan)
2018 (Qs)
2017 (Qs)
8
9
10
11
12
13
14
15
ON SCHEDULE
Bankable Feasibility Study
Financing
Construction
Commissioning
Production
27
16
Yangibana Project – Nov 2015 Scoping Study
Plant Throughput
Item
Project Life
Units
Million tonnes per
annum (mtpa)
Years
Base Case
1.0
7.5
Product Value Neodymium
A$m
2,307
Product Value Praseodymium
A$m
530
Product Value Dysprosium
A$m
151
Product Value Europium
A$m
243
Exchange Rate
AUD:USD
0.75
Capital Cost
A$m
411
IRR
%
52
NPV at 10% discount rate
A$m
650-750
Payback after construction completed
Years
1.5
28
Yangibana Project : Nov 2015 Scoping
Study Capital Costs
Category
Cost A$m
Geology and Mining
9
Processing Plant
154
Project Services
10
Accommodation Camp
20
Infrastructure
28
Management/Services
62
Pre-Production Costs
12
Contingency (40%)
116
Total Capital Costs
411
29
Yangibana Project : Nov 2015 Scoping Study
Operating Costs
Per Tonne Run of Mine*
Cost A$m
Net Revenue
468
Operating cost
205
Net Profit
263
* That is per tonne delivered to Treatment Plant
30
Yangibana Project – Nov 2015 Scoping Study
Extrapolated 15 year Operation Case
Extrapolated Case
• Based on an additional 8 years production of similar material
• Financial evaluation indicates NPV (10% discount rate) of $900million to
$1.1billion
• Sound expectation of sufficient resources
• with +4 million tonnes already delineated in Inferred Resources at Bald Hill
South, Fraser’s, Yangibana West, Yangibana North, Gossan, Lion’s Ear,
Hook, Kane’s Gossan and Bald Hill North
• Additional targets identified and drilled at Yangibana, Yangibana South
and Terry’s Find
• All resources remain open at depth and along strike
• Major exploration target at greater depth
31
The Macro Economic Case
for Nd/Pr/Dy Magnets
Yangibana
32
Some End Use of Hastings’ Target Rare Earth Oxides
33
Facts in Perspective
• In 2014 the world wide sales of mobile phones
exceeded global population => 7.3B sales
• Est of 0.1g of Nd in each mobile => 730 tons Nd/year
• Wind turbine present one of the most significant
potential areas of growth in demand for NdFeB
magnets (permanent magnets)
• A 2MW wind turbine contains 340-420kg REE
• Each HEV contains about 27kg REE
• In the EU, 117.9% increase in HEV sales for
1Q2015 vs 1Q2014
• Compare this to 36.6% increase in 2014 over
2013
34
Demand vs Supply - Neodymium Oxide
Adamas Intel – October 2014
35
Demand vs Supply - Dysprosium Oxide
Adamas Intel – October 2014
36
What’s being said since the VW Emissions Scandal
“Internal combustion engine may have died… This is sort of the end game for internal
combustion engines to a degree.” – Mike Guy, The Drive Editor
“Risk that diesel manufacturers globally will be tarnished” – Matthew Beasley,
Henderson Global Investors.
“The crisis is bad for diesel! The fuel that was encouraged for years as substantially
better than petrol when it comes to green house gas emissions is now exposed as
potentially worse than thought when it comes to other emissions” – UK Newsnight
“It will probably kill the market in US… This is going to be a bigger issue going forward
& we may see a declining diesel sales in Europe as a result of it and the winners will be
the petrol hybrid & maybe the electric cars of the future” - David Bailey, Professor of
Industry, Aston University
US & European Emission Standards
38
Roskills Intel
39
RE market outlook – green technology driving
NdPr demand growth
Roskills Intel
40
Hastings in the Sweet Spot
• Carbon emissions targets imposed by EU & US governments effective 2020
• Green technology driving NdPr demand growth
United Nations’ "COP21" climate summit in Paris (Dec 2015) - likely to be a
landmark event that starts to shut the door on parts of the fossil industry. “It is a
non-exchangeable, one way ticket to a low carbon economy”.
China is fully on board – will introduce its own emissions trading scheme in 2017
• VW scandal - ramifications to the fate of the internal combustion engines
• APPLE to ship electric cars by 2019
“The impact on electric vehicles is significant. If the world’s most valuable
company were to make a car, we strongly believe it will be an all electric,
battery-powered vehicle. Having a company with Apple’s resources and
technical expertise throw its weight behind EVs could accelerate
development and consumer adoption.” WSJ
41
Investment Case
1. High grade, neodymium rich beneficiated concentrate
2. Low cost, simple flotation via open pit mining
3. Granted Mining leases free of Native title claims
4. NPV10 A$650 - 750m (7 years), IRR 52% with payback of 1.5 years
5. Australia: availability of skilled services; & AAA sovereign risk rating
6. An unstoppable clean & green revolution
42
THANK YOU
Yangibana
www. hastingstechmetals,.com
43
Share your feedback
Discover