Rights Issue Presentation
Released
Released
Announcement PDF
Not for release to US wire services or distribution in the United States
Rights Issue
Presentation
18 April 2024
Hastings Technology Metals Ltd | ASX:HAS
1
Photo: Kurrbili Village
DISCLAIMER
DISCLAIMER
This presentation has been prepared by Hastings Technology Metals Limited
(“Company” or “Hastings”). This presentation is not an offer, invitation,
solicitation or other recommendation with respect to the subscription for,
purchase or sale of any securities in the Company. This presentation has been
made available for information purposes only and does not constitute a
prospectus, short form prospectus, profile statement or offer information
statement nor does it constitute investment or financial product advice (nor
taxation, accounting or legal advice) and it is not intended to be used as a basis
for making an investment decision. This presentation is provided expressly on
the basis that you will carry out your own independent inquiries into the matters
contained in the presentation and make your own independent decisions about
the affairs, financial position or prospects of the Company. The Company
reserves the right to update, amend or supplement the information at any time
in its absolute discretion (without incurring any obligation to do so).
To the maximum extent permitted by law neither the Company, nor its related
bodies corporate, officers, their advisers, agents and employees accept any
responsibility or liability to any person or entity as to the accuracy, completeness
or reasonableness of the information, statements, opinions or matters (express
or implied) arising out of, contained in or derived from this presentation or
provided in connection with it, or any omission from this presentation, nor as to
the attainability of any estimates, forecasts or projections set out in this
presentation. Any such responsibility or liability is, to the maximum extent
permitted by law, expressly disclaimed and excluded. Nothing in this material
should be construed as either an offer to sell or a solicitation of an offer to buy
or sell securities in the United States or any other jurisdiction where it would be
illegal. It does not include all available information and should not be used in
isolation as a basis to invest in the Company.
FORWARD LOOKING STATEMENTS
This presentation contains reference to certain intentions, expectations, future
plans, strategies, and prospects of the Company. Those intentions, expectations,
future plans, strategies, and prospects may or may not be achieved. They are
based on certain assumptions, which may not be met or on which views may
differ and may be affected by known and unknown risks. The performance and
operations of the Company may be influenced by a number of factors, many of
which are outside the control of the Company. No representation or warranty,
express or implied, is made by the Company, or any of its directors, officers,
employees, advisers or agents that any intentions, expectations or plans will be
achieved either totally or partially or that any particular rate of return will be
achieved.
Given the risks and uncertainties that may cause the Company’s actual future
results, performance or achievements to be materially different from those
expected, planned or intended, recipients should not place undue reliance on
these intentions, expectations, future plans, strategies and prospects. The
Company does not warrant or represent that the actual results, performance or
achievements will be as expected, planned or intended. The Company is under
no obligation to, nor makes any undertaking to, update or revise such forward
looking statements, but believes they are fair and reasonable at the date of the
presentation.
COMPETENT PERSONS’ STATEMENT
The information in this presentation relating to Mineral Resources and Ore
Reserves have been prepared by a Competent Person in accordance with the
2012 edition of the ‘Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves’ (“JORC Code”) and have been extracted
from the release titled ‘Yangibana Ore Reserves Increase by 25%’ dated 6
February 2023, which is available to view at www.asx.com.au under the code
“HAS” (the original release).
The Company confirms that it is not aware of any other new information or data
that materially affects the information included in the original market
announcement and that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to
apply and have not materially changed. Hastings confirms that the form and
context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcements.
The information that relates to Mineral Resources is based on information
compiled by David Princep and Lyn Widenbar. Both Mr Princep and Mr
Widenbar are independent consultants to the Company and members of the
Australasian Institute of Mining and Metallurgy (“AusIMM”). Mr Princep and Mr
Widenbar have sufficient experience relevant to the styles of mineralisation and
types of deposits which are covered in this announcement and to the activity
which they are undertaking to qualify as a Competent Person as defined in the
JORC Code.
The information that relates to the Ore Reserves at Bald Hill, Simon’s Find,
Fraser’s, Auer, Auer North, Yangibana and Yangibana North is based on
information reviewed or work undertaken by Mr Stephen O’Grady. Mr O’Grady is
an independent consultant to the Company, a member of the AusIMM, and a
Director of Intermine Engineering Consultants. Mr O’Grady has sufficient
experience relevant to the style of mineralisation and type of deposit under
consideration and to the preparation of mining studies to qualify as a
Competent Person as defined by the JORC Code. Mr O’Grady consents to the
inclusion in this announcement of the matters based on his information in the
form and context in which it appears.
The scientific and technical information that relates to process metallurgy is
based on information reviewed by Ms Narelle Marriott (former General Manager
Process Development) of Hastings Technology Metals Limited. Ms Marriott is a
member of the AusIMM and has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration and to the activity being
undertaken to qualify as a Competent Person as defined by the JORC Code. Ms
Marriott owned shares in the Company and participates in the Company’s
employee share plan. Ms Marriott consents to the inclusion in this
announcement of the matters based on their information in the form and
context in which it appears.
The information that relates to Exploration Results in relation to the Yangibana
Project is based on information compiled by Dr Louis Schürmann (PhD) (Chief
Geologist) of Hastings Technology Metals Limited. Dr Schürmann is a Fellow of
the AusIMM and has sufficient experience that is relevant to the activity being
undertaken to qualify as a Competent Person as defined in the JORC Code. The
Qualified Person has verified the data disclosed in this release, including
sampling, analytical and test data underlying the information contained in this
release. Dr Schürmann consents to the inclusion in the announcement of the
matters based on his information in the form and context in which it appears.
This announcement has been prepared for publication in Australia and may not
be released to US wire services or distributed in the United States. This
announcement does not constitute an offer to sell, or a solicitation of an offer
to buy, securities in the United States or any other jurisdiction. Any securities
described in this announcement have not been, and will not be, registered
under the US Securities Act of 1933 and may not be offered or sold in the United
States except in transactions exempt from, or not subject to, the registration
of the US Securities Act and applicable US state securities laws.
2
EQUITY RAISING OVERVIEW
$22.15m Rights Issue to existing shareholders for advancement of the Yangibana Project development
Equity Raising Overview
Offer Size and Structure
•
Partially underwritten pro-rata renounceable entitlement offer to Eligible Shareholders of 9 New Shares for every 20 Shares held to raise up to $22.15
million (before costs) (“Entitlement Offer”)
•
61.5 million shares to be issued under the maximum Entitlement Offer (“New Shares”) reflecting 45% of the existing ordinary shares on issue
•
The Company will have 198 million shares on issue post the Entitlement Offer if the maximum Entitlement Offer is subscribed for
•
New Shares issued under the Entitlement Offer will rank pari passu with existing fully paid ordinary shares on issue
•
New Shares to be issued under the Entitlement Offer at a price of $0.36, which represents a discount of:
Offer Price
Attaching Options
Uses of Funds
Key Shareholder Participation
•
40% to the last closing price of $0.605 per share on 22 March 2024
•
42% to the five-day volume weighted average price (“VWAP”) of $0.6159 as at 22 March 2024
•
32% to the theoretical ex-rights price (“TERP”) of $0.53
•
1 for 3 free listed options at an exercise price of $0.50 and expiry date two years post issue date
•
The Company proposes to use proceeds from the Entitlement Offer towards long lead equipment & associated engineering, professional services fees,
working capital and project finance due diligence
•
The Executive Chairman, Board and Key Management Personnel intend to take up their entitlement under the Entitlement Offer
•
The Entitlement Offer is partially underwritten to $8.75 million by the following:
Underwriters
•
Equator Capital Management Ltd, Advance Opportunities Fund, Paramount Star Investments Limited, Chiu Ling Ngooi, Neil Franks, Mun Kee
Chang, Johann Chik and Yu Huei Wang
Lead Manager
•
Canaccord Genuity has been appointed as lead manager for the potential placement of any New Shares under the Shortfall Order
Legal Adviser
•
Steinepreis Paganin
3
EQUITY RAISING TIMETABLE
Entitlement Close Date of 24 April 2024
Timetable
Event
Date
Announcement of Entitlement Offer
Wednesday, 27 March 2024
Lodgment of Prospectus (ASIC & ASX)
Wednesday, 27 March 2024
Ex Entitlement date
Tuesday, 2 April 2024
Rights trading starts
Tuesday, 2 April 2024
Record Date for determining Entitlements (5:00pm AWST)
Entitlement Offer opening date / prospectus sent out
Wednesday, 3 April 2024
Friday, 5 April 2024
Rights trading ends at close of trading
Wednesday, 17 April 2024
Trading in shares commences
Thursday, 18 April 2024
Entitlement Close Date (5:00pm AWST)
Wednesday, 24 April 2024
Announcement of Entitlement Offer results
(including shortfall, if any)
Monday, 29 April 2024
Underwriter subscribes for shortfall under terms of Underwriting/Sub-Underwriting Agreement
Tuesday, 30 April 2024
Cash settlement
Tuesday, 30 April 2024
Quotation of New Shares under Entitlement Offer
Wednesday, 1 May 2024
Issue of any remaining shortfall securities under the Shortfall Offer
By no later than Wednesday, 24 July 2024
The timetable is indicative only and subject to variation. The Company reserves the right to alter the timetable at its discretion and without notice, subject to ASX Listing Rules and the Corporations Act.
4
EQUITY RAISING OUTCOME
Utilisation of funds to strengthen balance sheet and advance final funding package through to final investment
decision and main construction
Purpose of the Offer1
Pro-forma Balance Sheet2
AUD
Interim Financial
Report Consolidated
Project management team costs
$1,149,476
31-Dec-23
Payment for long lead equipment & associated engineering costs
$13,054,855
Site overheads, ongoing maintenance, ESG, & marketing
$2,808,912
Corporate costs including office costs/G&A, project funding/DD, insurance, IT
$4,575,286
Total (excl. costs)
$21,588,529
Expenses of offer
Item
Total Uses
1Refer to section 3.1 of Prospectus released 27 March 2024 for further information on purpose of the Offer.
Pro-forma fully
subscribed
Renounceable Rights
Issue
Pro-forma Post Rights
Issue
Current Assets
$47,391,854
$21,588,529
$68,980,383
Non-Current Assets
$418,277,643
-
$418,277,643
Current Liabilities
$17,876,433
-
$17,876,433
$557,949
Non-Current
Liabilities
$153,851,699
-
$153,851,699
$22,146,478
Net Assets
$293,941,365
$21,588,529
$315,529,894
2Refer to section 3.4 of Prospectus released 27 March 2024 for full details of the pro-forma balance sheet.
5
CORPORATE SNAPSHOT
Significant value upside from development of the
Yangibana Rare Earths Project
Yangibana Project
Reserve inventory of 20.9mt with high NdPr:TREO ratio3
Current mine life of 17 years with significant upside
$294 million
$0.37
Investment of $142 million in early works
Net Assets4
Share price1
137 million
$42 million
Ordinary shares on issue2
Cash balance at 31 December 2023
inclusive of restricted funds
$49.59 million
21.15%
Market capitalisation1
Investment in rare earth materials and
magnet producer Neo Performance
Materials (TSX:NEO)
WESTERN
AUSTRALIA
Onslow
Carnarvon
Gascoyne Junction
Major shareholders
12%
Executive Chairman
Charles Lew and family
6.6%
L1 Capital
~45%
Top 20 Shareholders
Geraldton
Retail
Institutions
Employees
Other
Perth
Yangibana
1 At 16 April 2024
2 Includes 4.5 million shares issued to Alpha Investment Partners as collateral for the At-The-Market facility
3 Refer ASX announcement “Yangibana Ore Reserves Increase by 25%”, dated 6 February 2023
4 Refer ASX announcement “Half Yearly Report and Accounts”, dated 15 March 2024
AUSTRALIA
6
6
YANGIBANA - UNIQUE TIER ONE ASSET
World-class deposit with unrivalled high percentage of NdPr:TREO in
the orebody in a tier one jurisdiction, supplying the critical raw
materials for rare earth magnets
Average NdPr:TREO Ratio1
Sichuan (China)
14%
Mountain Pass (US)
NdPr is critical to the
energy transition
16%
Kangankunde (Malawi)
20%
Ngualla (Tanzania)
21%
Bayan Obo (China)
21%
Mt Weld (Western Australia)
Nolans (Northern Territory)
23%
26%
Songwe Hill (Malawi)
33%
Yangibana Project (Western Australia)
37%
Average NdPr:TREO ratio surpassing
most global projects
Up to 52% NdPr:TREO ratio in certain
parts of the orebody
1 Source – refer to slide 37
7
STRATEGIC HIGHLIGHTS
Significant progress made to de-risk the pathway to first concentrate
production in 20261
Globally significant
world-class asset
World-class rare earth deposit with high proportion of neodymium and
praseodymium (average of 37% over mine life) in the rare earth basket,
producing minerals critical to the global energy transition
De-risked project
execution strategy
Shovel ready and fully permitted with $142 million invested to date
(December 2023) in non-processing infrastructure and long-lead critical path
equipment and with EPC contract in place to commence main construction
High margin offtake
supporting robust
project economics
New processing and offtake arrangement to deliver improved economic
returns including post-tax NPV11 of $865 million and IRR of 31.28%1 and enhance
project funding options and flexibility
ESG focus
Leading ESG credentials assessed by independent third-parties, providing
employment and business development opportunities for local communities
and Traditional Owners
Clear long-term
strategy to maximise
value
Yangibana is a multi-generational project with significant exploration upside
to support the increase in mine life, while also evaluating opportunities for
value-adding downstream processing opportunities
1 Refer ASX announcement “Binding Term Sheet Signed for Integrated Tolling and Offtake”, dated 16 February 2024
8
13X YANGIBANA PROJECTS TO MEET DEFICIT
Supply deficit for rare earths driven by growth in demand for permanent magnets this decade1
Global REO Magnet Demand – Anticipated Growth2
NdPr Oxide – Forecast Supply and Demand Balance2
Supply
Electric Vehicles / mobility
Wind Power
Industrial
Consumer
Demand
Other
Demand
•
Early 2026
First Concentrate –
Yangibana Project
CAGR 7.8%
•
Supply
+189%
•
•
•
+180%
2023
2032
1 Refer to Appendix B: Key Risks
CAGR of 7.8% for rare earth magnets driven
predominantly by electric vehicles and
renewable energy technologies
Significant demand gap to continue growing
for the next decade
2023
2 Global REO Magnet Demand represents rare earth elements used in magnets only (Nd, Pr, Dy, Tb oxides)
Source (Global REO Magnet Demand – Anticipated Growth): Adamas Intelligence Forecast (April 2023)
Source (NdPr Oxide – Forecast Supply and Demand Balance): Adamas Intelligence Forecast (Rare Earth Magnet Outlook to 2040 Q2/2023)
13x Yangibana Projects required by 2032 to
support demand
Near-term supply-side risks due to long
project development lead times
Market-wide cost escalations impacting
potential developers
2032
9
SHORT TERM MARKET DYNAMICS
Prices are recovering and sophisticated investors are building
positions within the sector
•
Rare earth prices
starting to rebound1
•
•
•
Electric vehicle sales and
wind turbines2,3
•
Sophisticated investors
and global partnerships
•
Global government
support for alternative
supply chain
•
•
•
Neodymium and praseodymium oxide prices have increased by ~10% in the past
month on key markets
Supply deficit expected to widen past 2030
Uncertainty around existing supply form Myanmar has potential to disrupt
supply into China
With inflation moderating and potential for lower interest rates this could bolster
consumer confidence and spending
Chinese EV sales have continued to increase, up 14.7% year-on-year from
January to March 2024
Wind turbines – new data from International Energy Agency indicates the global
offshore market grew by 35% in 2023 and the much larger onshore market
added 46% more capacity
Continued investment in rare earth companies in the past month in Australia
and abroad
Strong inbound interest from critical minerals funds and trading houses
Introduction of “Future Made in Australia” policy by Australian Government
providing increasing support for development of critical minerals projects
1 Asian Metals and Shanghai Metals Market pricing from 17 March to 17 April 2024
2 Source: Adamas Intelligence (Rare Earth Pricing Outlook Q1 2024)
3 “China's first-quarter EV sales”, dated 9-Apr-24 Available at: https://www.reuters.com
10
10
PROJECT OVERVIEW
Photo: Kurrbili Village at dusk
11
YANGIBANA PROJECT SNAPSHOT1
Fully permitted and high-margin project with multigenerational opportunities for the Gascoyne region
17 years
20.9mt
Life of mine
JORC Ore Reserves
37%
High margins
Average NdPr:TREO ratio over life of
mine, driving higher realised rare
earth oxide basket price
First quartile on global operational
margin curve, as verified by CRU Group
~1.1mtpa
37,000tpa
Material to the crusher, followed by
a grinding and flotation circuit
Rare earth concentrate at 27% TREO,
containing ~3,400tpa of NdPr oxide
Employment
Economic
contribution
Construction Jobs
Operations Jobs
>470
>270
>$1 billion in Commonwealth tax income
>$240 million in WA state royalties
>$65 million in Native Title royalties
1 Refer ASX announcement “Corporate Presentation – Staged Development Strategy”, dated 31 May 2023
12
PROJECT EXECUTION SIGNIFICANTLY DE-RISKED
Yangibana Project is shovel ready and fully permitted to move into development
Key Workstreams
Execution and cost
management
Technical and regulatory
•
Fully permitted for development
and first concentrate production in
2026
•
$210 million EPC contract awarded
to GR Engineering Services for
construction of process plant
•
Native Title agreement in place with
Traditional Owners
•
•
Completion of Staged Development
Study in Q2 2023
$120 million invested in
construction of non-processing
infrastructure – completed in Q4
2023
•
Mine plan optimisation for first five
years targeting lower strip ratios
while maintaining grade to the
process plant
•
Beneficiation plant flowsheet
extensively tested and de-risked
•
$22 million invested in long-lead
critical path items
•
Engineering designs for
beneficiation plant at 81% complete
•
Detailed design for bulk earthworks,
civil and structural elements
advanced
1 Refer ASX announcement “Yangibana Project Funding Update”, dated 22 November 2023
Commercial and funding
•
•
•
•
Offtake agreement in place for twothirds of annual concentrate
production with thyssenkrupp
Materials Trading
Binding term sheet in place with
Baotou Skyrock for integrated
processing and offtake agreement
for a minimum of 10,000tpa of
concentrate
Non-binding indicative financing
proposals received from multiple
parties1
Final due diligence phase
progressed including investor and
bank site visits and due diligence
calls with Hastings partners
Operational Readiness
•
Experienced management team in
place with strong track record of
project delivery
•
Ongoing work to build internal
processes and capabilities
•
Negotiation ongoing on key
commercial agreements, including:
o
Power purchase agreement
for the Project’s power
station
o
Catering contract issued to
market for competitive
tender
13
DEVELOPMENT READY
Fully permitted for first production in Q1 2026
Key Approvals
Status
WA Ministerial Approval
Commonwealth Ministerial Approval
Native Title Agreement
Mining Proposal (Early Works)
Mining Proposal (2023)
Works Approvals (Early Works)
Works Approval (Site-wide)
Water License (Early Works)
Water License (Site-wide)
Land Tenure
Project MP (Early Works)
Project MP (Early Works – Amendments)
Operating Licence
Radiation MPs and Site Registration
14
CAPITAL COSTS
$142 million capital investment1 to date provides
strong base to ramp up construction
$52
$22
Non-Processing Infrastructure
$120 million invested to date1 in finalising early site works
•
Kurrbili Accommodation Village
•
Yangibana Airstrip
•
SipHon Well Borefield
•
Site Access Roads
$120
$503m
$309
Critical path equipment
$22 million invested to date1 in long lead items
•
In Transit/Delivered – SAG Mill and Regrind Mill
•
Fabrication – Flotation Cells, Thickener, Mill Liner Handler
EPC contract
$210 million contract awarded to leading WA engineering and construction
company GR Engineering Services2
1As of 31 December 2023
2 Refer ASX Announcement “EPC Contract executed with GRES for Beneficiation Plant”, dated 4 August 2023
Remaining capital cost
Non Processing Infrastructure
Critical Path Equipment
Contingency
15
YANGIBANA PROJECT PROGRESS
Kurrbili Village
SipHon Borefield
Yangibana Airstrip
SAG Mill Shell
16
MINING SCHEDULE1
Process plant site
1.5
1.0
0.5
Bald Hill
Fraser's
Yangibana North
Yangibana
Auer North
Auer
Year 17
Year 16
Year 15
Year 14
Year 13
Year 12
Year 11
Year 10
Year 9
Year 8
Year 7
Year 6
Year 5
Year 4
Year 3
0.0
Year 2
Mining model is strategically designed to target zones with well-defined
grade and strip ratios, ensuring efficient extraction and maximising
resource value, while maintaining feed grade to the process plant
2.0
Year 1
Lower Strip ratio
2.5
Ore Tonnes Mined (Mt)
Focus on first five year to identify cost saving and
enhance economic returns
Life of mine optimised mining sequence by orebody1,2
3.0
Simon's find
Strategically located close to eight-kilometre long zone of economic
mineralisation at Bald Hill, Simon’s Find and Fraser’s
Higher free cashflow
Maximising returns in the early years of operations and reducing in the
capital payback period
High margins
Leveraging favourable basket composition with high NdPr, the Yangibana
Project is expected to be one of the highest margin producers globally,
sitting in the first quarter of CRU’s operational margin curve
1 Refer to Appendix B: Key Risks
2 Refer ASX announcement “Binding Term Sheet Signed for Integrated Tolling and Offtake”, dated 16 February 2024
17
BENEFICIATION PLANT CONSTRUCTION
EPC contract in place with leading engineering and construction firm GR Engineering Services1
$210 million contract
Fixed price lump sum portion of $180 million and
provisional sum portion of $30 million
Key benefits
Lowers project delivery risks, lower cost, greater
certainty on timeframe, process and product
quality guarantees
Performance guarantees
Commissioning and operational support to ensure
facility achieves quality and throughput guarantees
1 Refer ASX Announcement “EPC Contract executed with GRES for Beneficiation Plant”, dated 4 August 2023
18
BENEFICIATION PROCESS
Conventional flotation process which has been extensively tested and de-risked
Recovered grade of ~27% TREO
Feed grade of 1% TREO
Crushing
Grinding
Regrinding
Flotation
>100 bench scale tests
Completed at four commercial labs to develop robust
beneficiation flowsheet
>80 variability samples
Covering expected range of grade and mineralogy tested
through standard flowsheet
Two pilot plant tests
Input of
1.1mtpa of
mined ore
Successfully validated simple and effect
flowsheet
Successful bulk samples
For use in downstream engineering equipment design
test work
Output of
37,000tpa of rare
earth concentrate
Scale up from 150kg/h to
124t/h
Translation of process development batch and pilot
programs into engineering design
19
OPERATING SUSTAINABLY
Leading ESG credentials outperforming our peers and competitors in
sustainability performance
Health and Safety
Climate Change
Five years lost time injury free
Commitment to minimum 40% renewables allowed
for in capital forecast for Yangibana power station
Public benefit
Cultural Heritage
>470 and >270 jobs during construction and operations
respectively and >$1 billion in commonwealth tax
income and >$240 million in state royalties
Voluntary native title project agreement in place with
the Thiin-Mah Warriyangka, Tharrkari and Jiwarli People
Agency
Rating
Agency
Rating
Included in Sustainalytics’
2024 ESG top rated companies
list
Gold Rating – ranked in the
top five per cent of companies
assessed
Formal supporter of the Task
Force on Climate-Related
Financial Disclosures
Participant of the Ten
Principles of the UN Global
Compact
Positively assessed against the
IFC performance standards
(World Bank)
Positively assessed against the
Equator Principles IV (World
Bank)
20
PROJECT ECONOMICS
AND COMMERCIAL
ARRANGEMENTS
21
1
ROBUST PROJECT ECONOMICS
Improved metrics driven by move from previous domestic profitsharing model to realising 100% of net revenue, as well as lower
processing fees under the Baotou Skyrock agreement
$865 million
Post-tax NPV11 (ungeared)
3.4 years
Payback period
$3,345 million
Free cash flow (Life of Mine)
$503 million
Capital Cost (including $142 million
spent at 31 December 2023)
61%
23%
82%
7%
31.28%
Post-tax IRR (ungeared)
$9,639 million
Net revenue (Life of Mine)
$258 million
Average EBITDA per annum
$361 million
Remaining Capital Costs
1 Refer ASX announcement “Binding Term Sheet Signed for Integrated Tolling and Offtake”, dated 16 February 2024
Key Material Assumptions / Updates
The Base Case Financial Model (“BCFM”) assumptions adopted in the
Staged Development Study released on 31 May 2023 continues to apply
and has not materially changed, save for the following key updates:
•
Offtake and payabilities: Shift from domestic profit-sharing model to
rare earth concentrate sale and third-party processing
(hydrometallurgical and oxide separation) to achieve a full rare earth
oxide basket price, on terms expected in the term sheet with Baotou
Skyrock. Adjustments to yields and costs may be required following
pre-production pilot test work, as contemplated in the Term Sheet.
Negotiations are ongoing with other potential customers to conclude
similar arrangements.
•
Spent capital cost: $142 million of capital cost estimate incurred as
of 31 December 2023.
•
Commodity price: Average 10-year blended neodymium and
praseodymium (“NdPr”) oxide price (Wood Mackenzie, CRU, Adamas
Intelligence) of US$121/kg real, 2024$ (reduction from US$129/kg
adopted in the Staged Development Study).
•
Stage 1 standalone: The impact of Stage 2 for the Yangibana Project
(i.e. the potential hydrometallurgical plant) is excluded from the
economic analysis.
•
Mining: Mine schedule optimisation for the first five years of mining
targets lower strip ratio zones of the Yangibana Project’s ore bodies,
while maintaining the grade to the beneficiation plant. The total ore
processed remains at 20.9Mt, the mine life remains at 17 years, and
annual average production of rare earth concentrate remains at
37,000tpa as per the ASX Announcement ‘Yangibana Ore Reserves
increase by 25%’ dated 6 February 2023
•
Macroeconomics: FX Forward (Bloomberg January 2024), 10-year
average AUD:USD 0.65.
•
Cost assumptions: Incorporation of MREC and oxide separation fees
based on the fees provided in the Term Sheet, updated power tariffs
(40% renewable) from Independent Power Producer, and other
revisions for escalation.
14%
34%
48%
6%
22
BAOTOU SKYROCK OFFTAKE AGREEMENT1
Higher rare earth oxide revenue achieved through competitive offshore processing
Increased payability for the Yangibana Project’s concentrate through outsourcing multistage processing to mixed rare earth carbonate and rare earth oxides
No upfront capital cost required for hydrometallurgical
and oxide separation plant
Stage 1 – Yangibana Project
Mining and Beneficiation
Rare Earth Concentrate
Processing and Offtake Agreement
Hydrometallurgy
Mixed Rare Earth Carbonate
Indicative Domestic
Operating Costs
~US$13 to 27/kg REO
Indicative China
Processing Costs2
Up to 75% lower
Oxide Separation
Rare Earth Oxides
Company
Baotou Skyrock Rare Earth New Material Co., Ltd (“Baotou
Skyrock”)
Description
Established in 2006, Baotou Skyrock is a privately-owned
Chinese high-tech enterprise specialising in the production and
research an
Share your feedback
Discover