Hastings Corporate Presentation Diggers & Dealers
Released
Released
Announcement PDF
Hastings Technology Metals Ltd
PLANE
TEAM PHOTO
Corporate
Presentation
CAMP
Yangibana Rare Earths Project
Hastings Technology Metals Ltd | ASX:HAS
7 August 2024
Picture:
Yangibana
Rare
Earths
Project
Yangibana
Rare Earths
Project,
Western
Australia
1
DISCLAIMER
This presentation has been prepared by Hastings Technology Metals Limited (“Company” or “Hastings”). This presentation is not an offer, invitation, solicitation or other
recommendation with respect to the subscription for, purchase or sale of any securities in the Company. This presentation has been made available for information purposes
only and does not constitute a prospectus, short form prospectus, profile statement or offer information statement nor does it constitute investment or financial product
advice (nor taxation, accounting or legal advice) and it is not intended to be used as a basis for making an investment decision. This presentation is provided expressly on the
basis that you will carry out your own independent inquiries into the matters contained in the presentation and make your own independent decisions about the affairs,
financial position or prospects of the Company. The Company reserves the right to update, amend or supplement the information at any time in its absolute discretion
(without incurring any obligation to do so).
To the maximum extent permitted by law neither the Company, nor its related bodies corporate, officers, their advisers, agents and employees accept any responsibility or
liability to any person or entity as to the accuracy, completeness or reasonableness of the information, statements, opinions or matters (express or implied) arising out of,
contained in or derived from this presentation or provided in connection with it, or any omission from this presentation, nor as to the attainability of any estimates, forecasts
or projections set out in this presentation. Any such responsibility or liability is, to the maximum extent permitted by law, expressly disclaimed and excluded. Nothing in this
material should be construed as either an offer to sell or a solicitation of an offer to buy or sell securities in the United States or any other jurisdiction where it would be illegal.
It does not include all available information and should not be used in isolation as a basis to invest in the Company.
FORWARD LOOKING STATEMENTS
This presentation contains reference to certain intentions, expectations, future plans, strategies and prospects of the Company. Those intentions, expectations, future plans,
strategies and prospects may or may not be achieved. They are based on certain assumptions, which may not be met or on which views may differ and may be affected by
known and unknown risks. The performance and operations of the Company may be influenced by a number of factors, many of which are outside the control of the
Company. No representation or warranty, express or implied, is made by the Company, or any of its directors, officers, employees, advisers or agents that any intentions,
expectations or plans will be achieved either totally or partially or that any particular rate of return will be achieved.
Given the risks and uncertainties that may cause the Company’s actual future results, performance or achievements to be materially different from those expected, planned
or intended, recipients should not place undue reliance on these intentions, expectations, future plans, strategies and prospects. The Company does not warrant or represent
that the actual results, performance or achievements will be as expected, planned or intended. The Company is under no obligation to, nor makes any undertaking to, update
or revise such forward looking statements, but believes they are fair and reasonable at the date of the presentation.
COMPETENT PERSONS’ STATEMENT
The information in this presentation relating to Mineral Resources and Ore Reserves have been prepared by a Competent Person in accordance with the 2012 edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (“JORC Code”) and have been extracted from the release title ‘Annual Report to
shareholders’ dated 28 September 2023 which is available to view at www.asx.com.au under the code “HAS” (the original release). The Company confirms that it is not aware
of any other new information or data that materially affects the information included in the original market announcement and that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. Hastings confirms that the form and
context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements.
The information that relates to Mineral Resources is based on information compiled by David Princep and Lyn Widenbar. Both Mr. Princep and Mr Widenbar are independent
consultants to the Company and members of the Australasian Institute of Mining and Metallurgy (AusIMM). Mr Princep and Mr Widenbar have sufficient experience relevant
to the styles of mineralisation and types of deposits which are covered in this announcement and to the activity which they are undertaking to qualify as a Competent Person
as defined in the JORC Code.
The information that relates to the Ore Reserves at Bald Hill, Simon’s Find, Fraser’s, Auer, Auer North, Yangibana and Yangibana North is based on information reviewed or
work undertaken by Mr. Stephen O’Grady. Mr O’Grady is an independent consultant to the Company and a member of the AusIMM, and a Director of Intermine Engineering
Consultants. Mr O’Grady has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the preparation of mining studies to
qualify as a Competent Person as defined by the JORC Code. Mr O’Grady consents to the inclusion in this announcement of the matters based on his information in the form
and context in which it appears.
The scientific and technical information in this announcement and that relates to process metallurgy is based on information reviewed by Scott Atkinson. Mr Atkinson is a fulltime employee of Hastings Technology Metals Limited and member of the Australasian Institute of Mining and Metallurgy (AusIMM; 3056865) and has sufficient experience
relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined by the JORC
Code 2012. Mr Atkinson consents to the inclusion in this announcement of the matters based on their information in the form and context in which it appears.
Investor Site Visit – Yangibana Rare Earths Project
The information in this announcement that relates to exploration results in relation to the Yangibana Rare Earths Project (“Yangibana Project” or “Yangibana”) and the
Centipede Range Project (“Centipede Project” or “Centipede”) and other exploration results, are based on information compiled by Competent Person, Dr. Louis Schürmann.
Dr. Schürmann is a full-time employee of Hastings and Fellow of the Australasian Institute of Mining and Metallurgy (Aus IMM: 308067). Dr Schürmann has sufficient
experience relevant to the styles of mineralization and types of deposits which are covered in this announcement and to the activity which they are undertaking to qualify as a
Competent Persons as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results’. Dr Schürmann consents to the inclusion of this
announcement of the matters based on the information and context in which it appears. Dr Schürmann has +30 years’ experience as an exploration geologist and project
manager.
2
33
EXECUTIVE SUMMARY
Picture: Kurrbili Village (at dusk)
4
SNAPSHOT - YANGIBANA
Yangibana
AUSTRALIA
Significant value upside from development of the
Yangibana Rare Earths Project and Niobium byproduct credit stream
$474m
$465m
Total Capital Cost
Total Assets1
21.5%
Invested in early infrastructure2
Shareholding in Neo
Performance Materials Inc.
$320m
$865m
Remaining Capital Cost2
NPV11 (post-tax, ungeared)
32%
Top 20 Shareholders
9.8%
JL Mag. Investment4
Reserve inventory of 20.93mt with 188kt of
WESTERN
AUSTRALIA
Onslow
Carnarvon
Major shareholders
15%
World-class project with robust economics
contained TREO3, supporting 17-year mine life
$154m
Executive Chairman
Charles Lew & family
Office
Yangibana Project
Gascoyne Junction
Geraldton
Retail
Employees
Institutions
Other
Perth
1 As per Hastings’ Half Year Report (31 December 2023)
2 As at 30 June 2024
3Total Rare Earth Oxides
4 Refer ASX announcement “Leading Permanent Magnet Producer, JL Mag to become 9.8% Strategic Investor in Hastings”,
dated 9 July 2024
5
Picture: Investor Site Tour (July 2024)
YANGIBANA PROJECT
OVERVIEW
6
YANGIBANA - UNIQUE TIER ONE ASSET
World-class deposit with unrivalled high percentage of NdPr:TREO in
the orebody in a tier one jurisdiction, supplying the critical raw
materials for rare earth magnets
Average NdPr:TREO Ratio1
Sichuan (China)
14%
Mountain Pass (US)
NdPr is critical to the
energy transition
16%
Kangankunde (Malawi)
20%
Ngualla (Tanzania)
21%
Bayan Obo (China)
21%
Mt Weld (Western Australia)
23%
Nolans (Northern Territory)
Songwe Hill (Malawi)
26%
33%
Yangibana Project (Western Australia)
37%
Average NdPr:TREO ratio surpassing
most global projects
Up to 52% NdPr:TREO ratio in certain
parts of the orebody
1 Source – refer to slide 25
7
YANGIBANA PROJECT SNAPSHOT
Fully permitted and high-margin project with multigenerational opportunities for the Gascoyne region
17-year
20.9mt
Life-of-mine
Ore Reserves
37%
High margins
Average NdPr:TREO ratio over life
of mine, driving higher realized
rare earth oxide basket price
First quartile on global operational
margin curve, as verified by CRU
Group
~1.1mtpa
37,000tpa
Material to the crusher, followed
by a grinding and flotation circuit
Rare earth concentrate at 27%
TREO, containing ~3,400tpa of
NdPr oxide
Employment
Economic contribution
Construction Jobs
Operations Jobs
>470
>270
>$1bn (US$0.65bn) in Commonwealth tax
income
>$240m (US$156m) in WA state royalties
>$65m (US$42.2m) in Native Title royalties
Refer to disclaimer on Slide 2 for cautionary statements
8
Picture: Chief Geologist / Drill Core presentation
CAPITAL COSTS
$154m capital investment1 provides strong base to
ramp up construction. $320m remaining capital cost.
$27
$154m Capital Cost incurred1
$30
Represents 32% of total capital cost (including contingency)
Non-Processing Infrastructure
$124m (US$80m) invested to date1 in early site works
•
Kurrbili Accommodation Village
•
Yangibana Airstrip
•
SipHon Well Borefield
•
Site Access Roads
$124
$320m
remaining
(incl. contingency)
$293
Critical path equipment
$30m (US$20m) invested to date1 in long lead items
•
In Transit/Delivered – SAG Mill; Regrind Mill; Flotation
Cells; Thickener; Belt feeder; Mill Liner Handler; number
of pumps; MCC & VSD
•
Fabrication is complete for all long lead items
EPC contract
$210m (US$136m) contract awarded to leading WA engineering
and construction company GR Engineering Services
1As of 30 June 2024 (includes indirects costs)
Remaining Capex
Non Processing Infrastructure
Critical Path Equipment
Contingency
9
YANGIBANA PROJECT PROGRESS
Early infrastructure completed and long lead time items available
Kurrbili Village - 294 rooms fully commissioned with medical
centre, sports court, shop, dry and wet mess.
Yangibana Airstrip - 2km in length, suitable for planes up to 70
seat capacity. The airport buildings are in place ensuring fast
changeovers for employees.
Site Access Roads - 20km site access road to connect the Yangibana
Project’s mine site with the shire road network to the beneficiation
plant, village, mine and construction work.
SipHon Borefield - Fully permitted consisting of 6 bores, fully
equipped with holding tanks and high flow pumps and pipeline to
the process plant.
Equipment – Long Lead Equipment in WA and in storage ready for
installation.
Flotation Cells & Structural Steel ready for installation.
10
BENEFICIATION PLANT CONSTRUCTION
EPC contract with leading engineering and construction firm GR Engineering Services
$210m (US$136m) contract
Fixed price lump sum contract
Key benefits
Lowers project delivery risks, lower cost,
greater certainty on timeframe, process and
product quality guarantees
Performance guarantees
Commissioning and operational support to
ensure facility achieves quality and
throughput guarantees
Proposed Beneficiation Plant layout
11
LONG LEAD TIME EQUIPMENT PROCURED AND IN STORAGE IN PERTH
Significant Long Lead Time Items available for deployment
Acid Bake Kiln
Pumps and Equipment
Load Bin, OffGas Scrubber and Uranium Removal Circuit
12
PROJECT EXECUTION INDICATIVE SCHEDULE
Staged development strategy enabling a quicker pathway to cashflow
2023
Q1
Q2
Q3
2025
2024
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
2026
Q4
Q1
Q2
Q3
Q4
Feasibility Study –
Staged Development Strategy
Non-Processing Infrastructure
(Airstrip, Village, Access Roads, Borefields)
Process Plant EPC/
Main Construction
Practical
First concentrate on
Completion truck
Utilities and Services
(Power, Water, Gas)
Construction of beneficiation plant
Commissioning
Ramp-up to 37Ktpa
13
JL MAG TAKES 9.8% STRATEGIC STAKE
Hastings welcomes investment by JL Mag Rare-Earth Co., Limited, the leading global permanent magnet producer
STRATEGIC INVESTMENT
ABOUT JL MAG
The world’s leading producer of rare earths permanent magnets JL Mag to
make $7m strategic investment in Hastings (19.6m shares at $0.36 cents per
new ordinary share)
World’s number one producer of high-performance rare earth permanent
magnets by volume and is also widely acknowledged as the world leader in
the application of Grain Boundary Diffusion technology for magnets
JL Mag will own 9.8% of the enlarged issued share capital of Hastings, and Han
Yu, Vice President of JL Mag, will join the Board of Hastings
JL Mag’s global customer base includes: the world’s top 10 New Electric
Vehicles (“NEV”) manufacturers, eight of the world’s top ten variablefrequency air-conditioners (“VFAC”) compressor manufacturers and five of the
world’s top ten wind turbine generators
The price ($0.36/sh) is at a premium of:
• 22.8% to 10-day VWAP $0.2932; and
• 38.8% to 30-day VWAP $0.2593 up to and including 5 July 2024
JL Mag has the ability to participate in future capital raisings to maintain its
9.8% shareholding
Hong Kong Stock Exchange listed JL Mag (HKSE:6680) has a market
capitalization of HK$17.7bn / $3.4bn also listed on the Shenzhen Stock
Exchange (SZSE:300748)
Sales in 2023 were $1.4bn; EBITDA of $129m; cash of $819m1
Investment proceeds will be used to advance the flagship Yangibana Rare
Earths Project in Western Australia towards production, of which 32% of total
project cost has been completed.
1 Refer Hong Kong Stock Exchange JL Mag announcement “Annual Report 2023”, dated 12 April 2024 converted at an
exchange rate of 4.76 CNY per AUD
Global Customers
14
FINANCE & ESG
15
PROJECT ECONOMICS
Robust Financial Metrics
$865m (US$562m)
31.28%
3.4 years
Post-tax NPV11 (ungeared)
Post-tax IRR (ungeared)
Payback period
$9,639m (US$6,265m)
$3,345m (US$2,174m)
Net revenue (Life-of-Mine)
Free cash flow (Life-of-Mine)
$258m (US$168m)
Average EBITDA per annum
Key Material Assumptions / Updates
The Base Case Financial Model (“BCFM”) assumptions adopted •
in the Staged Development Study released on 31 May 2023
continues to apply and has not materially changed, save for
the following key updates:
• Offtake and payabilities: Shift from domestic profitsharing model to rare earth concentrate sale and third- •
party
processing
(hydrometallurgical
and
oxide
separation) to achieve a full rare earth oxide basket price,
on terms expected in the term sheet with Baotou Sky •
Rock. Adjustments to yields and costs may be required
following pre-production pilot test work, as contemplated
in the Term Sheet. Negotiations are ongoing with other
potential customers to conclude similar arrangements.
• Spent capital cost: $154m (US$99m) of capital cost
estimate incurred as of 30 June 2024.
Commodity price: Average 10-year blended neodymium •
and praseodymium (“NdPr”) oxide price (Wood Mackenzie,
CRU, Adamas Intelligence) of US$121/kg real, 2024$ •
(reduction from US$129/kg adopted in the Staged
Development Study).
Stage 1 standalone: The impact of Stage 2 for the
Yangibana Project (i.e. the potential hydrometallurgical
plant) is excluded from the economic analysis.
Mining: Mine schedule optimisation for the first five years
of mining targets lower strip ratio zones of the Yangibana
Project’s ore bodies, while maintaining the grade to the
beneficiation plant. The total ore processed remains at
20.9Mt, the mine life remains at 17 years, and annual
average production of rare earth concentrate remains at
37,000tpa as per the ASX Announcement ‘Yangibana Ore
Reserves increase by 25%’ dated 6 February 2023
Macroeconomics: FX Forward (Bloomberg January 2024),
10-year average AUD:USD 0.65.
Cost assumptions: Incorporation of MREC and oxide
separation fees based on the fees provided in the Term
Sheet, updated power tariffs (40% renewable) from
Independent Power Producer, and other revisions for
escalation.
16
16
GREEN FINANCE AND ESG
Yangibana Project will produce critical minerals to power the energy transition
Second Party Opinion
•
•
•
ESG Credentials
Hastings Green Bond Financing Framework and Carbon Reduction Transition Plan
reviewed by DNV
Agency
US$300m Senior Secured Green Bond Issue is aligned with the International Capital
Market Association’s ("ICMA") Green Bond Principles (“GBP”)
Included in Sustainalytics’
2024 ESG top rated
companies list
Carbon Reduction Transition Plan is aligned with the Climate Transition Finance
Handbook.
ICMA GBP Eligibility Criteria
Energy
efficiency
Clean
transportation
Rare earth permanent
magnets power over 90%
of Electric Vehicle ("EV")
motors
Rare earth permanent
magnets in EV motors
improve energy efficiency
compared to induction
motors
Yangibana Project potential to supply
55 million EVs
Reducing carbon emissions by approximately 1.2 billion
tonnes CO2e, compared to internal combustion engines
Renewable
energy
Sustainable water
and wastewater
management
Rare earths are key
components of direct-drive
wind turbines; investment in
solar photovoltaic (“PV”) for
Yangibana Project's
operations
Minimising water
consumption and
promoting recovered and
recycled water to create a
more sustainable operation
Yangibana Project potential
to supply
Up to
% of water
requirements at Yangibana
met by recovered process
water – equivalent of 1,200
Olympic-sized swimming
pools per annum
170GW
Installed direct wind
turbine capacity
Rating
82
Formal supporter of the
Task Force on ClimateRelated Financial
Disclosures
Positively assessed against
the IFC performance
standards (World Bank)
Gold Rating – ranked in
the top five per cent of
companies assessed
Participant of the Ten
Principles of the UN Global
Compact
Positively assessed against
the Equator Principles IV
(World Bank)
17
NIOBIUM – ADDITIONAL
BY-PRODUCT CREDIT
REVENUE STREAM
Photo: Viaduct de Millau bridge in southern France made 60% lighter due to the use of niobium
18
NIOBIUM MARKET
Niobium is a critical and strategic mineral
~90% of the world’s niobium produced by Brazil2
Niobium Demand Drivers3
Listed as a critical mineral by the US, Australia1, India, Japan, China and the EU.
Ranked number 2 out of 50 on the US Critical Minerals List2
Majority of niobium used in steel
Approximately 90% of all niobium is consumed in steelmaking. For example, the strength of the steel
can be increased by more than 30% by adding 0.03-0.05% niobium.
High-tech uses emerging (Lithium-ion batteries)
Key growth area is Niobium’s potential use in the next generation of Li-Ion Batteries (Faster Charging)
many other potential high-tech applications including superconducting magnets used in medical
imaging devices, magnetic levitation trains and nuclear reactors.
3
3
1 Australia’s Critical Minerals List https://www.industry.gov.au/publications/australias-critical-minerals-list-and-strategic-materials-list
2 Critical Mineral Resources National Policy and Critical Minerals List (8 April 2024): https://sgp.fas.org/crs/misc/R47982.pdf
3 NioCorp Presentation Q2 2024: https://gx0d43.a2cdn1.secureserver.net/wp-content/uploads/Detailed_NioCorp_Presentation_Q2-2024.pdf
4 CBMM https://niobium.tech/-/media/niobiumtech/documentos/resource-center/nt_bridge-steels-niobium-jan-2020.pdf
5 https://www.fastmarkets.com/insights/brazils-cbmm-niobium-batteries-2030/
Stronger and
lighter steel for
buildings,
bridges & megainfrastructure
projects
Growing demand
for lighter
weight and more
fuel efficient
cars, trucks and
buses
Next Gen
NiobiumLithium-Ion
Batteries
0.025% Niobium in
the steel of the
Viaduct de Millau
bridge reduced the
overall weight by
60%4
300g Nb reduces
weight of mid-sized
car by 200kg and
increases fuel
efficiency by 5%4
Significant potential
demand CBMM
expects nearly
35ktpa Nb oxide
sales by 20305
(270t in 2022)
19
Picture: SAG Mill Shell Arrival at Dampier Port
19
RESOURCE AND RESERVE DEVELOPMENT
Significant exploration targets providing growth optionality (Rare Earths and Niobium)
Exploration focus
Priority areas identified to expand
mine life beyond initial 17-years to
build long-term value for shareholders
66km strike length
Significant exploration upside with
only one-third of strike length (24km)
defined as a resource
Exploration target
40 – 60 million tonnes, confined to
ironstone hosted mineralisation
Existing 29.93mt Mineral Resource has
been defined over 24km of strike length
Additional exploration potential strike
length of 42km identified
Disclaimer: There is no certainty that further exploration work will result in the determination of Mineral Resources (or Ore Reserves)
20
NIOBIUM AT YANGIBANA RARE EARTHS PROJECT
There are niobium occurrences noted in all prospects of the Yangibana Rare Earths Project
Niobium (Nb2O5) concentrations occur in the form of mineral ferro-columbite
at the Yangibana Project over a 4-kilometre strike at the existing Simon’s Find
and Bald Hill deposits.
Historical mineralised drill intersections at the Simon’s Find prospect,
previously announced on 9 October and 22 November 2017, include:
• 5.45m at 5.3% Nb2O5 from 27.55 metres (SFDD002)
• 10m at 2.66% Nb2O5 from 7 metres (SFRC065)
Additional mineralised drill intersections at the Simon’s Find prospect include:
• 21m at 1.64% Nb2O5 from 34 metres (SFRC188)
• 15m at 1.82% Nb2O5 from 61 metres (SFRC174).
Niobium mineralisation is not limited to the Simon’s Find deposit with
significant occurrences identified in drill chips at both the Bald Hill and Hatchett
prospects, and in outcrops at the Yangibana and Yangibana South prospects.
Mineralised drill intersections include:
• 11m at 0.54% Nb2O5 from 24 metres (BHRC548)
• 12m at 0.47% Nb2O5 from 55 metres (BHRC550)
• 6m at 0.70% Nb2O5 from 17 metres (HARC005)
Refer to ASX Announcement 1 August 2024 ‘NIOBIUM TEST RESULTS ENHANCE YANGIBANA PROJECT POTENTIAL AS A
MULTI-COMMODITY RARE EARTHS PROJECT’
21
METALURGICAL TEST WORK
Niobium upgraded by 19 times using gravity separation and low intensity magnetic separation
Initial metallurgical test work using gravity separation followed by low intensity
magnet separation, the initial test work recovered and concentrated the ferrocolumbite to 16.88% Nb2O5 from a 0.87% Nb2O5 feed, a 19 times uplift of
niobium grade.
Further metallurgical test work results and maiden Resource Estimate for
niobium are expected by the end of 2024.
Hastings is expediting the investigation of including a niobium (Nb) circuit to its
Yangibana Rare Earths Project to provide a multi-commodity recovery process
stream
The potential for by-product credits from niobium in addition to Hastings’
primary focus on the rare earths elements’ (Nd, Pr, Dy, Tb) income stream
Refer to ASX Announcement 1 August 2024 ‘NIOBIUM TEST RESULTS ENHANCE YANGIBANA PROJECT POTENTIAL AS A
MULTI-COMMODITY RARE EARTHS PROJECT’
22
STRATEGIC HIGHLIGHTS
Summary
World-class rare earth deposit with high proportion of neodymium
and praseodymium (average of 37% over mine life) in the rare earth
basket.
Ideally placed to produce minerals critical for the global energy
transition and meet expected supply deficit.
Initial 17-year Life of Mine.
Shovel ready and fully permitted with $154m (32% of total Capex)
invested to date.
Significant exploration upside including heavy rare earths.
Significant upside as a future Niobium producer with potential
material by-product credit in addition to rare earths1.
1Refer to ASX Announcement 1 August 2024 ‘NIOBIUM TEST RESULTS ENHANCE YANGIBANA PROJECT POTENTIAL AS A
MULTI-COMMODITY RARE EARTHS PROJECT’
Picture: Yangibana Airport
23
APPENDIX
24
SOURCE DOCUMENTS
PEER COMPRISON – NDPR:TREO RATIO
Mine
Ownership
Ticker
Stage of
Development
Capex (A$m)
Reserves
Tonnage (mt)
TREO Grade
Category
NdPr:TREO
ratio
Yangibana
Hastings Technology Metals Ltd
HAS:ASX
Pre-production
503
20.93
0.90%
Proven and
Probable
37%
6 February 2023: ASX Announcement: “Yangibana Ore Reserves Increase by 25%”
Songwe Hill
Mkango Resources Ltd
MKA:TSXV
Feasibility
479
18.15
1.16%
Proven and
Probable
33%
5 July 2022: SEDAR Announcement: “Mkango Announces Results of Definitive Feasibility Study
For The Songwe Hill Rare Earths Project In Malawi - NPV of US$559.0 Million And IRR of 31.5%”
Nolans
Arafura Rare Earths Ltd
ARU:ASX
Pre-production
1,680
29.50
2.90%
Proven and
Probable
26%
11 November 2022: ASX Announcement: "Nolans Project Update"
13 December 2023: ASX Announcement: "Arafura Rare Earths: Equity Raise Presentation"
Mt Weld
Lynas Rare Earths Ltd
LYC:ASX
Production
N/A
19.7
8.60%
Proven and
Probable
23%
6 August 2018: ASX Announcement: “Lynas announces a 60% increase to Mt Weld Ore Reserves,
one of the world’s richest sources of Rare Earths”
Bayan Obo
China Northern Rare Earth Group
High-Tech Co Ltd
600111:CH
Production
N/A
>2,200
2.55%
Proven and
Probable
21%
15 December 2020: Ord Minnett Report, “Hastings Tech Metals, Thematic Firing”
S&P Capital IQ Pro: Property ID 31805 Reserves and Resources
PEK:ASX
FEED
Completed
4.8%
Proved and
Probable
21%
24 October 2022: ASX Announcement: “Ngualla Rare Earths Project Completion of Bankable
Feasibility Study Update”
30 November 2023: ASX Announcement: “Completion of FEED Study”
Ngualla
Kangankunde
Peak Rare Earths Limited
Lindian Resources Limited
Mountain Pass MP Materials Corp
Sichuan
Rising Nonferrous Metals Share
Co. Ltd
441
18.5
Source
LIN:ASX
Feasibility
A$60m
(US$40m)
261
(Resource)
2.14%
Inferred
20%
3 August 2023: ASX Announcement: “Maiden Mineral Resource”
7 Feb 2024: ASX Announcement: “Indaba Mining Conference Presentation”
1 July 2024: ASX Announcement: “Kangankunde Project Stage 1 Outstanding Feasibility Study
Results”
MP:NYSE
Production
N/A
29.3
6.32%
Proven and
Probable
16%
28 February 2023: SEC Filing: Form 10-K – Annual Report,
600259:CH
Production
N/A
N/A
N/A
N/A
14%
15 December 2020: Ord Minnett Report, “Hastings Tech Metals, Thematic Firing”
MINERAL RESOURCES AND ORE RESERVES1
TOTAL JORC (2012) MINERAL RESOURCES (30 OCTOBER 2022)
TOTAL JORC (2012) ORE RESERVES BY DEPOSIT (6 EFBRUARY 2023)
Deposit
mt
%TREO
%NdPr
NdPr: TREO
Bald Hill
8.12
0.79
0.32
41
Fraser’s
1.77
1.01
0.43
43
171,936
Simon’s Find
2.69
0.53
0.28
53
0.33
219,657
Auer
2.83
0.96
0.34
35
1.05
0.31
57,298
Yangibana
1.31
0.79
0.37
47
Yangibana North
4.21
1.29
0.34
26
0.93
0.32
276,955
TOTAL
20.93
0.90
0.33
37
Category
mt
%TREO
%NdPr
TREO tonnes
Measured
4.97
0.96
0.37
47,721
Indicated
19.51
0.88
0.32
Sub-total
24.49
0.90
Inferred
5.45
TOTAL
29.93
1 Refer ASX announcement “Yangibana Ore Reserves Increase by 25%”, dated 6 February 2023; numbers may not add due to rounding; for reference that the Ore Reserves stated is included as part of the Mineral Resources
Disclaimer: There is no certainty that further exploration work will result in the determination of Mineral Resources (or Ore Reserves)
25
HASTINGS STRATEGY
Building on the long-life of the Yangibana Project to unlock value through downstream processing opportunities
Rare Earth
Concentrate
Mixed Rare Earth
Carbonate
Rare Earth Oxides
Permanent Magnets
Mining and
Beneficiation
Metals and Alloys
Processing
Separation
Refining
Manufacturing
Yangibana Mine and
Beneficiation Plant
Establishing Hastings as a leading Australian
supplier of rare earth concentrate
Pursue downstream
opportunities
Developing processing capability to
capture higher margins
Mine to magnet
Exploring opportunities to build a vertically
integrated rare earths to magnet business
through its 21.5% investment in Neo
Performance Materials Inc.
26
Follow us on
Hastings Technology Metals Limited
ABN 43 122 911 399
Level 6, 197 St Georges
Level 3, 5Terrace
Mill St
Perth Western Australia 6000
T: +61 8 6117 6118
E: info@hastingstechmetals.com
hastingstechmetals.com
27