Annual Report to shareholders
Released
Released
Announcement PDF
Australia’s next
rare earths producer
Annual Report
2023
ANNUAL REPORT 2023
Contents
Acknowledgment of Country
We acknowledge the Traditional Custodians of all the lands on
which we operate and recognise their unique cultural heritage,
beliefs and connection to these lands, waters and communities.
We pay our respects to their Elders past, present and emerging.
Corporate Information
ABN 43 122 911 399
Directors
Mr Charles Lew (Chairman)
Mr Guy Robertson
Mr Neil Hackett
Mr Bruce McFadzean
Mr Malcolm Randall
Mr Jean Claude Steinmetz
Joint Company Secretaries
Mr Guy Robertson
Mr Neil Hackett
Registered office
Bankers
Level 6, 197 St Georges Terrace
National Australia Bank – Perth WA Australia
Perth WA 6000
Westpac – Sydney NSW 2000 Australia
Telephone: +61 (8) 6117 6118
Auditors
Principal place of business
PricewaterhouseCoopers
Level 6, 197 St Georges Terrace
125 St Georges Terrace
Perth WA 6000 Australia
PERTH WA 6000
Share register
Website
Automic Group
www.hastingstechmetals.com
Level 5, 191 St Georges Terrace
Perth WA 6000
Securities Exchange
Telephone: +61 1300 288 664
Australian Securities Exchange
ASX Code: HAS
Solicitors
King & Wood Mallesons – Perth WA Australia
Herbert Smith Freehills – Perth WA Australia
About Hastings
2
Letter from the Chairman
4
Senior Leadership Team
9
Review of Operations
12
Review of Sustainability
18
Mineral Resources and Ore Reserves Statement
20
Tenement Schedule
27
Directors’ Report
29
Corporate Governance Statement
49
Auditor’s Independence Declaration
50
Consolidated Statement of Profit or Loss and Other Comprehensive Income
51
Consolidated Statement of Financial Position
52
Consolidated Statement of Changes in Equity
53
Consolidated Statement of Cash Flows
54
Notes to the Financial Statements
55
Directors’ Declaration
90
Independent Auditor’s Report
91
Additional Shareholder Information
97
ABOUT
INVESTMENT
With a clear focus on developing the world-class Yangibana Rare Earths Project
(“Yangibana Project”), Hastings Technology Metals Limited (ASX:HAS) is wellpositioned to become Australia’s next rare earths producer.
Green economy
Tier 1 asset
Compelling rare earths
market fundamentals to
grow value, driven by the
global energy transition
World-class rare earths
deposit with globally high
LOM average NdPr:TREO
ratio of 37%
Attractive project
economics
Mine to magnet
ESG focus
Strategic investment in
TSX-listed Neo to pursue a
vertically integrated rare earth
to magnet strategy
Strong ESG credentials
verified by independent
third parties; targeting
40-80% renewable energy
for Yangibana Project’s
power supply
Hastings
Located 250km north-east of Carnarvon in Western
Australia’s Gascoyne region, Hastings’ flagship Yangibana
Project covers a total area of 650 square kilometres and
is underpinned by one of the world’s most highly valued
deposits of neodymium and praseodymium (“NdPr”),
with an average life of mine (“LOM”) NdPr to Total Rare
Earth Oxides (“TREO”) ratio of 37% and up to 52% in some
areas of the orebody.
With an initial mine life of 17 years, the Yangibana Project
will become a globally significant source of NdPr, a critical
component in the manufacture of permanent magnets used
in advanced technology products from electric vehicles
(“EVs”) to renewable energy, humanoid robotics, medical
applications and digital devices.
Fully permitted for first rare earth concentrate (“concentrate”)
production in the first half of 2025, the Yangibana Project
is well-timed to meet the forecast supply gap for rare
earth elements accelerated by the growth in EVs and wind
turbines, both vital for the global energy transition.
Hastings will develop the project in two stages with an initial
focus on the construction of the Yangibana Project’s mine
and beneficiation plant to produce up to 37,000 tonnes
per annum of concentrate, followed by the construction of
Project area
650km2
Highlights
a hydrometallurgical plant in Onslow with the capacity to
produce up to 15,000 tonnes per annum of mixed rare earth
carbonate (“MREC”).
Hastings has a strategic shareholding of 19.9% as of 30
June 2023 in TSX-listed Neo Performance Materials Inc.
(“Neo”) – a leading global rare earth processing and
advanced permanent magnets producer – providing the
Company with the opportunity to explore the creation of a
mine-to-magnet supply chain.
Development ready
Fully permitted for first
concentrate production
in Q2 2025 with $106
millions invested in early
infrastructure works
Hastings is committed to developing and operating the
Yangibana Project in a sustainable manner. The Company’s
strong Environment, Social and Governance (“ESG”)
credentials have been subject to independent third-party
ESG ratings including ranking in the top five per cent of
companies assessed by EcoVadis and fourth out of 159
companies in the 2022 diversified metals mining subindustry
category by Sustainalytics.
Once developed, the world-class Yangibana Project will
establish Hastings as a significant supplier in the global
critical minerals sector and generate strong returns for
shareholders, investors and for the Australian economy
and local communities.
Enhanced two-stage
project delivery model
enabling faster pathway
to early project cashflows
Average NdPr:TREO ratio
37%
Life of mine
17 years
First production
Q2 2025
2 | Hastings Technology Metals
Annual Report 2023 | 3
LETTER FROM THE
Chairman
lead and witness the advancement of
your Company from the discovery of
the amazing orebody at Yangibana as
a junior explorer to where we are today,
on the cusp of moving into construction
of our beneficiation plant to produce
a high-value concentrate by early 2025.
Dear Shareholders,
I trust this letter finds you in good
health and spirits.
As I celebrate my 10th anniversary
as Executive Chairman of Hastings,
I am writing to you with a sense
of enthusiasm and anticipation
that comes from reflecting on a
decade filled with both remarkable
achievements and formidable
challenges. It has been a privilege to
4 | Hastings Technology Metals
The world is now at a pivotal stage of
the global transition away from fossil
fuels towards cleaner energy sources.
This energy transition is accelerating at
an unprecedented pace, underpinned
by an unwavering demand for critical
minerals such as lithium and rare
earths to power EVs and drive the
renewable energy revolution as well
as enabling advanced robotics of
the future.
According to the International Energy
Agency’s inaugural Critical Minerals
Market Review, the market for critical
minerals has witnessed remarkable
growth. Its value has doubled over
the past five years, reaching an
astonishing $320 billion in 2022 –
this seismic shift in value is redefining
the future of the mining industry and
we have seen many new investments
into critical minerals.
Notably, governments worldwide
are driving investment into critical
minerals, spurred by their commitment
to net zero emissions. This includes
the United States’ introduction of
the Inflation Reduction Act which
seeks to shore up domestic critical
mineral supply chains. Likewise,
Australia’s Critical Minerals Strategy
and the Critical Raw Materials Act
by the European Union underscore
the global importance of securing
these resources.
Driven by robust demand in the
automotive sector and the emergence
of humanoid robotics, the global
permanent magnets market is
projected to reach $92 billion by
2033, which will drive the demand for
rare earths which is predicted
to increase at an eight per cent
compound annual growth rate
by Boston Consulting Group.
But where will this supply come from?
With long lead times of up to 10
years or longer to bring rare earth
projects from discovery to production,
international market analysts and
commentators envisage a serious
supply shortage in the coming decade.
The first drill program at the Yangibana
Project was initiated in early 2014,
and to date we have conducted over
300 bench scale tests, accumulated
over 30 kilometres of drilling meterage
and undertaken three pilot plant tests.
Our ore samples have undergone
lab testing by numerous rare
earth producers and independent
laboratories and the results have
consistently confirmed the quality
of our resource.
The orebody at the Yangibana
Project is widely recognised as
possessing one of the world’s highest
concentrations of NdPr:TREO, with a
ratio across multiple deposits in the
range of 26% to 52%.
We have continued to grow our
resources and reserves through ongoing
exploration and metallurgy test work and
last October successfully completed an
extensive drilling campaign along the
eight-kilometre long Bald Hill – Simon’s
Find – Fraser’s trend which resulted in
an increase in the Mineral Resources
to 29.93 million tonnes.
Subsequently, we announced in
February 2023 a 25% increase in
our total proved and probable ore
reserves to 20.93 million tonnes,
underpinning a solid 17-year mine life.
The growth was based on work from
the 2021-22 drilling campaign, as well
as the completion of the acquisition
of the 30% joint venture interest from
Cadence Minerals Plc which relates
to some legacy tenements.
Exploration will remain a focus for
Hastings as we look to continuously
grow our resource and reserves. Aeromagnetic and radiometric surveys
conducted in 2018 unveilled extensive
areas for future drilling to extend
and increase our resources from the
two main deposits at Yangibana and
Yangibana North, the four inferred
deposits of Gossan, Hook, Lion’s Ear
and Kane’s Gossan and a myriad of
other exploration targets within the
tenement area 100% owned and
controlled by Hastings.
Post COVID, the Australian mining
sector has seen significant cost inflation
due to labour shortages and rising
interest rates. To meet this challenge,
your Company adopted a proactive
stance to strengthen our management
team by appointing seasoned mining
executive Alwyn Vorster as Interim
Chief Executive Officer on a six-month
contract. We also made a number of
other senior appointments including
Teck Lim (Chief Financial Officer),
Robert Klug (General Counsel), Tim
Gilbert (General Manager Operations)
and Gareth Fleming (Project Director).
Each of them possesses extensive
domain knowledge and multiple
years of experience.
Annual Report 2023 | 5
Under this new management team, we
undertook a comprehensive review of
the capital cost and delivery model
for the Yangibana Project and in May
announced a two-stage development
approach that prioritises the Yangibana
Project’s mine and beneficiation
plant, aligning with our pursuit of
lower upfront capital requirements
and expedited cashflows by Q2
2025. Meanwhile, ongoing studies
on optimising capital and operating
expenditure for the hydrometallurgy
plant continues.
I am pleased to report that this new
approach has improved our project’s
financial and operational resilience,
with the Stage 1 capital cost is
projected at $470 million, a figure that
encompasses $106 million already
invested in crucial early infrastructure
works at the Yangibana Project. In
addition, we are confident that we will
identify more opportunities for cost
savings and lower the spend as we
continue to optimise the funding model
for the project.
To fund the procurement of critical long
lead equipment for the process plants
and build the mine site infrastructure,
we raised $110 million last September.
This was achieved through shares
placement of approximately 25 million
new fully paid ordinary shares at an
offer price of $4.40 per share.
I am pleased to report that despite
the complexities of navigating
extensive regulations for mining and
developing a greenfield site in such a
remote location, we are now ready to
commence full construction of the plant
following the finalisation of early works.
This includes the 294-room Kurrbili
Village, 20 kilometres of site access
roads, a two-kilometre long airstrip
and the SipHon Well Borefield with 30
kilometres of pipeline for water supply.
A major milestone in our revised delivery
model is the award of the Engineering,
Procurement and Construction contract
to GR Engineering Services on a
fixed price and fixed schedule. This
partnership ensures the delivery of
the beneficiation plant and associated
infrastructure, mitigating the potential
for capital cost escalation and
guaranteeing adherence to project
schedules, product throughput,
and plant recovery.
In March, the European Union introduced
the Critical Raw Materials Act to ensure
that the EU has access to secure,
diversified, affordable and sustainable
supply of critical raw materials. This
move resonates with our Europeancentric business model and aligns with
our vision to feed into the supply chain
for a “Made in Europe” magnet by
2030, promoted by the European Raw
Materials Alliance in mid-2022.
With this strategic vision in mind, your
Board and management team took
a decisive and opportunistic step in
August last year by acquiring a 19.9%
strategic investment in TSX-listed Neo.
We are pleased that Wyloo Metals, who
shares in our vision, provided funding
for this $150 million acquisition by way
of a convertible note secured entirely
on Neo shares. A key term of this loan,
inter alia, is that it is not secured over
any Yangibana Project assets. Any
project finance raised will be secured
over the Yangibana Project, and the
convertible notes have no security over
the project assets. The convertible
note that is secured entirely on the Neo
shares expires in October 2025 and
the equity conversion price is fixed at
$5.50 per Hastings’ share.
This is a long term strategic investment
and gives Hastings a pivotal position
and prospects of creating an integrated
mine to magnet supply chain all
under one single entity. It provides the
potential for our Company to become
a major player in the rare earth magnet
supply chain emerging in Europe.
In June, I had the honour of
participating in the groundbreaking
ceremony for Neo’s neodymium
sintered magnet manufacturing facility
in Narva, Estonia – the first of its kind
in Europe. This event coincided with
the signing of a non-binding Heads
of Agreement with Neo, the purpose
of which is to take another step
forward to realising synergies
between our companies.
$320bn
$92bn
8%
Value of critical minerals
market in 2022
Projected value of global
permanent magnets
market by 2033
Expected compound
annual growth rate for
permanent magnets
between 2022 and 2035
Turning to the market, it was a tale
of two halves for NdPr oxides in the
2023 financial year, with prices falling
60% from the peak in February 2022,
as demand for permanent magnets
in China remained weak due to the
disappointing post-COVID economic
rebound and rising interest rates
environment. It is no surprise that our
fortunes followed in tandem, with our
share price at its multi-year weakest
as a result of its close correlation to
the commodity price, as well as the
increase in capital costs for the project
due to industry-wide cost escalations.
of success and optimises the balance
sheet gearing and light on debt
covenants. Additional equity required
to complement the debt quantum has
been reduced significantly since we
published the capex number in May
- no doubt we will release the news to
the market when we have closed on
both the debt and equity financing.
projects, most recently at Mineral
Resources Limited and Fortescue
Metals Group.
We are confident that the forecast
supply deficit from the middle of the
decade will set the stage for more
favourable price trends, with our
targeted production start of Q2 2025
aligning perfectly with the supplydemand dynamics.
Against the background of these
significant developments over the
past 12 months, our commitment to
operating sustainably remains core
to our business. In November 2022,
we received our ESG rating from
Sustainalytics, where Hastings ranked
fourth out of 159 companies in the
diversified metals mining sub-industry
category. We were also awarded a
gold medal by EcoVadis, ranking
Hastings in the top five per cent of
all companies assessed.
As we look at the year ahead, our
main focus now is to close on the
debt financing. Multiple options were
explored and we are mindful that the
final choice will have the best chance
6 | Hastings Technology Metals
Before concluding, I would like to
extend my heartfelt condolences to
the family and friends of Thin-mah
Warrinyangki Tharrkari Jiwarli Elder
Herbert Eagles, who passed on in
May this year. I had the privilege of
working with a man whom I respect
for his determination and good faith in
negotiations and how he cared for the
interests of his community and family.
In November 2017, I was proud to be
able to sign our voluntary Native Title
Agreement with Herbert.
My fellow shareholders, the
journey ahead holds both promises
and challenges. Over the past
decade, I have had the privilege of
leading your company as Executive
Chairman and invested alongside
yourselves. Through a culture of
meticulous planning and continuous
improvement, we have laid the
groundwork for a lower risk construction
and commissioning phase.
For this next leg of the journey, we were
pleased to announce the appointment
of seasoned mining executive Paul
Brown to the role of Chief Executive
Officer, bringing two decades of
expertise across the entire mining
lifecycle and successfully delivering
Together with Paul, we will remain
steadfast in our focus to become
Australia’s next rare earths producer,
while keeping our eye on our vision
of building a vertically integrated
mine to magnet business, creating
long term value for our shareholders,
stakeholders and our people.
On behalf of the Board, I would like
to acknowledge and thank the entire
Hastings team for their continued
hard work and dedication. And I
extend our sincere gratitude to you,
our shareholders, and to our other
stakeholders for your patience as we
continue to journey together.
Bringing the Yangibana Project into
production will positively touch the
lives of many in our local communities,
including our Native Title partners,
the Australian economy, as well as
contributing to a cleaner, greener
planet for future generations.
One dream, one team.
Yours faithfully,
Charles Lew
Executive Chairman
Annual Report 2023 | 7
POWERING THE
SENIOR
By 2032, anticipated global rare earth magnet demand is forecast to outstrip supply
by the equivalent of 13 times the projected NdPr output of Yangibana.
During the year, Hastings undertook a review of its organisational structure
for the development phase of the Yangibana Project, with a number of senior
leadership changes undertaken to ensure a strong, experienced management
team is in place to deliver the Yangibana Project.
Green Energy Revolution
As the dominant EV motor technology, sintered NdFeB magnets (rare earth
magnets) have more than 90% market share among leading automotive original
equipment manufacturers.
1.8kg
3,400 tpa
Amount of sintered NdFeB magnet in a
passenger EV
Annual NdPr production rate at Yangibana
55 million
1.2 billion tonnes
Number of EVs Yangibana will potentially
supply over initial 17-year mine life
Potential reduction of carbon emissions by
using 55 million EVs compared to internal
combustion engines
Leadership Team
I am deeply honoured to join the Hastings team during such a
transformative phase for the Company. The Yangibana Project
holds immense potential, and I’m eager to apply my experience
and insights to realise its full value. My passion for forward-facing
commodities like battery minerals and rare earth magnets
resonates deeply with the ecosystem crucial for a greener future.
– Paul Brown, Chief Executive Officer
8 | Hastings Technology Metals
Annual Report 2023 | 9
Interim Chief Executive Officer Alwyn Vorster was appointed in November 2022 to oversee a comprehensive review
of the Yangibana Project’s delivery and funding model. Mr Vorster’s fixed-term contract ended on 31 July 2023.
Other updates to the senior management team during FY23 are summarised below:
• Subsequent to 30 June 2023, Paul Brown was appointed Chief Executive Officer
• Teck Lim was appointed Chief Financial Officer
• Robert Klug was appointed General Counsel
• Gareth Fleming was appointed Project Director
Paul Brown
Chief Executive Officer
Teck Lim
Chief Financial Officer
Rachael Ward-Pryce
Head of People
Robert Klug
General Counsel
Narelle Marriott
GM Process Development
Gareth Fleming
Project Director
Paul Brown was appointed Chief
Executive Officer in September 2023,
bringing over two decades of experience
across the entire mining project lifecycle
and strong track record in major
project construction management,
commissioning and operation.
Teck Lim is a chartered accountant
with 20 years’ accounting and finance
experience, specialising in mining
and metals project development
funding. He was the lead project
finance financial advisor to Hastings
while at KPMG Corporate Finance and
his corporate advisory and banking
experience include landmark critical
minerals projects and mega project
financings in Australia and globally.
Rachael Ward-Pryce joined Hastings in
April 2021 and brings over two decades
of experience across the resources
sector in Australia and overseas.
Robert Klug is an Australian qualified
resources and corporate lawyer with
over 30 years of experience in startup and operational environments,
including business development, due
diligence and associated risk allocation
to achieve sustainable operational
performance and growth.
Narelle Marriott joined Hastings in late
2014, working on metallurgical process
development, project engineering,
research and development and project
improvement.
Gareth Fleming brings 20 years’
experience both in Europe and
Australia, as a professional engineer,
project manager, construction
manager, as well as holding statutory
positions as registered manager and
site senior executive.
Paul has held various senior roles in the
mining industry, including most recently
as Chief Executive – Commodities
and Chief Executive – Lithium at
Mineral Resources Limited. Prior
to this, his career spanned general
management, operational leadership,
technical direction, project and studies
management, business enhancement,
mineral resource assessment and
mine strategy, including senior roles
at Fortescue Metals Group, Leighton
Holdings and HWE Mining.
In his career to date, Paul has
successfully delivered and operated
a number of significant mining projects,
including Fortescue’s Solomon
Hub and MinRes’ Mount Marion
and Wodigna lithium projects and
Wonmunna iron ore mine.
He is an alumnus of Federation
University in Victoria, holding a
Masters in Mine Engineering (M.Eng).
10 | Hastings Technology Metals
Teck’s financing experience extends
to government agencies, multilaterals,
commercial banks, private equity,
mining funds and bond markets and
has worked with strategic investors,
joint venture development partners,
offtakers and commodity trading
houses to fund large scale mining
projects from feasibility studies through
to commercial operations.
Prior to joining Hastings, Teck was
Chief Financial Officer at Nico
Resources Ltd and held various roles
with ING Bank, HSBC Bank and
Deloitte within their resource industry
sectors. Teck holds a Bachelor of
Commerce from Murdoch University, a
Certificate in Mining Studies from the
University of British Columbia and a
Master of Business Administration from
the University of Western Australia.
Prior to joining Hastings, Rachael
held various roles at Newmont
Australia, Resolute Mining, Iluka
Resources and Alcoa across all
facets of human resources.
She is highly experienced in shaping
all aspects of people strategy and
building high performing teams within
the resource sector. Her experience
spans across generalist and specialised
roles including talent sourcing and
development, employee relations,
culture and inclusion and diversity.
Rachael holds a Bachelor of Arts
(BA) from Murdoch University and
a Graduate Diploma in Human
Resources Management from
Curtin University.
Initially trained as an auditor with
KPMG Perth, Robert worked in London
as a corporate lawyer after completing
his law degree at Murdoch University
in Perth.
Upon his return to Perth, he joined
Freehills’ Perth office where he
worked almost exclusively with small
and mid-cap resource companies.
Since then, Robert has worked in
legal, commercial and business
development roles for a variety of
resources companies, including as
Chief Commercial Officer and General
Counsel for Sandfire Resources.
Robert holds a Bachelor of Commerce
(Accounting and Finance) and
a Bachelor of Laws.
She is a minerals process engineering
with 20 years of experience in the
mining industry across multiple
commodities including nickel, iron ore
and rare earths.
Prior to joining Hastings, Narelle
worked at BHP Nickel West, Greenland
Minerals and Energy, Crosslands
Resources, WMC Resources across
a range of roles including process
flowsheet development, testwork and
piloting and process improvement.
Narelle holds a Bachelor of Engineering
(Minerals Process) from The University
of Queensland and a Graduate
Diploma in Sustainability Management.
He has delivered several key schemes
ranging from re-development works
for the 2012 London Olympics to key
projects for Main Roads WA, network
management for numerous WA
utility companies and mining related
construction works.
He has experience in a vast range of
delivery models including construct
only with tier one contractors, design
and construct, EPCM, PMC, joint
delivery teams and owners self
delivery with significant experience
with remote construction in the Pilbara
Region of WA.
His most recent role prior to joining
Hastings was the construction of
Australia’s largest salt and potash
facility at Mardie for BCI Minerals
Gareth holds a Bachelor of Engineering
(Hons) in Civil Engineering from the
University of Strathclyde in Glasgow
Annual Report 2023 | 11
REVIEW OF
Operations
Hastings is focused on the development
of the Company’s flagship Yangibana
Project. Located 250km north east from
Carnarvon in Western Australia’s Upper
Gascoyne region, the project is located
on Gifford Creek Station which covers
Thiin-Mah Warriyangka, Tharrkari and
Jiwarli country.
Company activities in the 2023 financial
year were primarily focused on early
infrastructure works at the Yangibana
Project, with the project on track for the
commencement of main construction in
the second half of the 2023 calendar year.
Project delivery and capital review
During the reporting period, the Company completed a comprehensive review into the project delivery model and capital cost,
confirming the Yangibana Project remains a world-class tier one project with excellent project economics.
A key outcome of the review was the introduction of a staged development strategy to reduce the upfront capital requirements
and project execution risks. Under this new strategy, the project will be developed in two stages:
Stage 1:
Stage 2:
Develop the Yangibana Project’s mine and beneficiation plant
to produce up to 37,000tpa of rare earth concentrate (27%
REO grade) and achieve first concentrate on truck
by H1 CY2025
Develop the hydrometallurgy plant at Onslow to
produce up to 15,000tpa of MREC (59% REO grade)
To provide greater certainty to the capital estimate and delivery schedule, Hastings has elected to adopt a fixed price
Engineering, Procurement and Construction (“EPC”) contract model to reduce overall project risk.
On 3 May 2023, the Company announced that it had entered into a binding term sheet with GR Engineering Services Limited
(“GRES”) for the delivery of the Yangibana Project’s beneficiation plant and associated infrastructure. The long-form contract
was subsequently executed
on 4 September 2023.
The $210 million EPC contract is lower than cost estimates for an equivalent scope of works under the former Engineering,
Procurement and Construction Management (“EPCM”) model and includes:
• a fixed price component of $180 million for the beneficiation plant
• a provisional component of $30 million mainly for earthworks associated with the beneficiation plant and tailing storage facility.
In addition, the EPC model offers additional benefits and lowers risks in multiple areas, including:
• a reduction in cost and providing cost certainty
• guarantees on the timeframe, with first concentrate production in Q2 CY2025 providing a pathway to early project cashflows
• guarantees on time, cost and product quality.
Stage 1
Key project metrics (concentrate-MREC)
Total
capital cost
Capital incurred
(at 30 June 2023)
Post-tax NPV11
(ungeared)
Post-tax IRR
(ungeared)
Average EBITDA
per annum
$470m
$106m
$538m –
$1,018m*
27.5% –
50.9%*
$175m –
$250m*
*Potential for improved economics through tolling and/or profit sharing arrangements
12 | Hastings Technology Metals
Annual Report 2023 | 13
Development activities
As the Company moves towards the commencement of main construction for the Yangibana Project’s mine and beneficiation
plant, early infrastructure works at site, engineering design and procurement have advanced for all critical elements of
project development.
Strategic investment in
Neo Performance Materials
Enabling works at the Yangibana Project were largely completed during FY2023, including:
• a 20km site access road alignment to connect the Yangibana Project’s mine site with the shire road network
• works to install water infrastructure, including six bores and a 30km pipeline from the SipHon Well Borefield to supply water
to the beneficiation plant, village, mine and construction works
• construction of a 2km x 30m airstrip to allow for up to 70-seater aircraft
• installation of a series of communication towers to allow permanent high speed communication
• construction of the 294-bed Kurrbili Accommodation Village, including
Share your feedback