HIGHLIGHTS
▪ Updated Yangibana Stage 1 DFS: The Yangibana unincorporated joint venture (“Yangibana UJV”)
released an updated Definitive Feasibility Study (“DFS”) for Stage 1 of the Yangibana Rare Earths and
Niobium Project, with a pre-tax ungeared NPV₈ of A$649 million, a pre-tax ungeared IRR of 34% and
a payback of 2.4 years, on initial Stage 1 capital of A$333.4 million (100% basis; Hastings’ 40% share
approximately A$133 million). The 19-year mine life is based entirely on the JORC (2012) Ore Reserve
of 20.93Mt at 0.90% TREO.
▪ Thailand plant: Hastings announced plans to increase the initial capacity of the Kabin Buri
hydrometallurgical rare earth processing plant in Thailand (“Thailand plant”) to approximately
12,000 tonnes per annum of mixed rare earth chloride (“MREC”). Upgrade works continued during
the Quarter, with first MREC production targeted for Q2 CY2027. On 27 October 2026, Hastings
completed the acquisition of its 49% interest in BZNM Co Ltd (“BZNM”), the owner of the Thailand
plant.
▪ Subsequent to the Quarter: Hastings advised that its 2026 Annual General Meeting will be held
on 27 November 2026.1
Hastings Technology Metals Ltd (ASX:HAS) (“Hastings” or “the Company”), a focused rare earths
and critical minerals company, presents its Quarterly Activities Report for the three-month period ended
30 September 2026 (the “Quarter”).
OVERVIEW
Thailand was the focus for the Quarter. Hastings increased the planned initial capacity of the Thailand
plant to approximately 12,000 tonnes per annum of MREC and continued the upgrade and operational
readiness works. The acquisition of Hastings’ 49% interest in BZNM completed on 27 October 2026, after
the end of the Quarter. At Yangibana, the Yangibana UJV released the updated DFS for Stage 1, with
updated capital and operating cost estimates and pricing assumptions.
Hastings Technology Metals Ltd CEO, Mr Vince Catania, commented: “Thailand has been our main
focus this quarter. We lifted the planned capacity of the plant to around 12,000 tonnes per annum of MREC,
kept the upgrade works moving and, in October, completed the acquisition of our 49% interest. The job now is
to finish the works, commission the plant and get on-spec product out the door.
“At Yangibana, the updated DFS shows a 2.4 year payback and average annual EBITDA of A$108 million, based
entirely on Ore Reserves and with much of the infrastructure already built. Funding is the main step to a Final
Investment Decision, and we will keep working with Wyloo while its sale process runs.”
1
See HAS ASX Announcement "AGM Date and Director Nominations" dated 6 October 2026.
Page 2 of 14
Figure 1: Location of the Thailand plant
THAILAND HYDROMETALLURGICAL PLANT (HASTINGS 49%)
On 31 March 2026, Hastings signed a binding term sheet with Enuo Holdings Pte Ltd ("Enuo") to acquire
a 49% interest in a hydrometallurgical MREC processing plant in Kabin Buri, Thailand, for total
consideration capped at US$15 million.2
Capacity Increase and Operational Readiness
On 14 July 2026, Hastings announced plans to increase the capacity of the initial Thailand plant to
approximately 10,000 tonnes per annum of monazite concentrate feed and approximately 12,000
tonnes per annum of MREC. The additional capacity will be built into the initial plant rather than added
in a later expansion. The minimum feedstock volume under the framework agreement with Enuo for
African-sourced monazite concentrate was increased to 10,000 tonnes per annum (refer ASX
announcement “Plans to Increase Thailand MREC Production to 12,000tpa” dated 14 July 2026).
Upgrade and operational readiness works continued at the Thailand plant during the Quarter, including
tank welding and fabrication and the delivery and handling of process vessels. Hastings paid $1.10
million in operational readiness costs during the Quarter. On 18 August 2026, Executive Chairman
2
See HAS ASX Announcement "Hastings Acquires Hydromet Plant" dated 31 March 2026.
Page 3 of 14
Charles Lew and Chief Executive Officer Vince Catania attended the Thailand Australia Investment &
Business Partnership event in Sydney with the Prime Minister of Thailand, Mr Anutin Charnvirakul, and
the Secretary General of Thailand’s Board of Investment (“BOI”), Mr Narit Therdsteerasukdi. The
acquisition completed on 27 October 2026, after the end of the Quarter (refer Events Subsequent to the
Quarter).
Planned Activities for the December 2026 Quarter
In the December 2026 quarter, Hastings will focus on progressing the remaining installation and upgrade
works ahead of testing and commissioning, with first MREC production targeted for Q2 CY2027. Hastings
will also continue work on feedstock supply for the ramp-up, its application to the BOI for investment
promotion, and negotiations to increase its shareholding in BZNM to 51% or more.
Figure 2: Delivery of plant equipment to site
Figure 3: Tank welding and fabrication as part of the upgrade works
Page 4 of 14
YANGIBANA RARE EARTHS AND NIOBIUM PROJECT (HASTINGS 40% | WYLOO 60%)
The Yangibana Rare Earths and Niobium Project is located in the Gascoyne region of Western Australia,
approximately 250km northeast of Carnarvon. Hastings holds a 40% participating interest in the
Yangibana UJV. The remaining 60% participating interest is held by Wyloo Gascoyne Pty Ltd (“Wyloo”),
which acts as manager and operator.
Figure 4: Yangibana Rare Earths and Niobium Project location.
Updated Stage 1 Definitive Feasibility Study3
On 13 July 2026, Hastings released the updated DFS for Stage 1 of the Yangibana Project. Stage 1
comprises open pit mining and a conventional beneficiation plant producing a mixed rare earth
concentrate at 27% TREO. The updated DFS includes current capital and operating cost estimates,
updated market-based rare earth price forecasts, an owner-operator mining model and the
infrastructure already built on site. Key outcomes are summarised in Table 1.
Metric (100% project basis) Updated DFS outcome
Pre-tax NPV₈ (ungeared) A$649 million
Pre-tax IRR (ungeared) 34%
3
See HAS ASX Announcements "Updated DFS Confirms De-Risked Pathway to Production" and "Updated DFS Confirms De-Risked
Pathway to Production Revised", both dated 13 July 2026.
Page 5 of 14
Metric (100% project basis) Updated DFS outcome
Pre-tax payback (from first production) 2.4 years
Initial Stage 1 capital cost A$333.4 million (incl. A$32.4 million growth and
contingency)
NPV₈ to capital cost ratio 1.94
Life of mine 19 years
Peak annual concentrate production 37,000tpa at 27% TREO
TREO recovery (whole-of-ore flotation) 85.7%
LOM C1 cash operating cost A$162.21/t ROM ore (A$20.75/kg TREO in concentrate)
Average annual EBITDA (after royalties) A$108 million
Total LOM EBITDA A$2,037 million
Table 1: Key outcomes of the updated Yangibana Stage 1 DFS (A$, Q1 2026 real; NdPr oxide price assumption of
US$110/kg; AUD:USD 0.70). Capital cost estimate accuracy is Class 3 (Feasibility Study), ±15%.
STAGE 1: A DE-RISKED WEST AUSTRALIAN RARE EARTHS DEVELOPMENT
PRE-TAX NPV
$649M
34% IRR (pre-tax, ungeared)
STAGE 1 CAPITAL COST
$333.4M
NPV8 / capex ratio of 1.94
LIFE OF MINE EBITDA
$2,037M
$108M average per annum
RARE EARTH CONCENTRATE
37,000tpa
peak output at 27% TREO
NDPR CONTENT
37% of TREO
>90% of forecast revenue
MINE LIFE
19 years
fully underpinned by Ore
Reserves
Figure 5: Key metrics from the updated Yangibana Stage 1 DFS (100% basis).
Ore Reserves4
The production target in the updated DFS is based entirely on the Yangibana Ore Reserve, which was
first reported on 6 February 2023 and is set out in Table 2. No Inferred Mineral Resources have been
included in the mine schedule or attributed any value.
Table 2: Yangibana Ore Reserve (JORC Code 2012, 100% basis). Totals may not sum due to rounding.
4
See HAS ASX Announcements "Updated DFS Confirms De-Risked Pathway to Production" and "Updated DFS Confirms De-Risked
Pathway to Production Revised", both dated 13 July 2026.
Category Tonnes (Mt) % TREO %Nd2O3+Pr6O11 TREO (t)
Proved 4.89 0.95 0.37 46,700
Probable 16.03 0.88 0.32 141,435
TOTAL 20.93 0.90 0.33 188,135
Page 6 of 14
Infrastructure, Approvals and Development Timeline
Approximately A$160 million of infrastructure has already been delivered at Yangibana, including a 294
room accommodation village, airstrip, main access road, communications towers and completed water
borefields, and beneficiation plant equipment has been procured. All capital invested to date is treated
as sunk in the updated DFS.5
All primary statutory consents to construct and operate have been secured, including mining tenure,
environmental, water licensing and heritage approvals. Secondary approvals permit construction of the
process plant and tailings facility and mining for the first eight years of the 19 year mine life. Approvals
for years nine to 19 have been scoped and referred to the State and Federal governments.
Figure 6: Yangibana Project deposits and key infrastructure locations.
Subject to a Final Investment Decision (“FID”), first concentrate is targeted approximately 101 weeks
(around two years) after award of the process plant EPC contract. Early works to recommission existing
facilities and order long-lead items have been recommended.
Figure 7: Existing infrastructure at Yangibana: (a) Kurrbili Accommodation Village; (b) Yangibana Airstrip.
5
See HAS ASX Announcements "Updated DFS Confirms De-Risked Pathway to Production" and "Updated DFS Confirms De-Risked
Pathway to Production Revised", both dated 13 July 2026.
0 1 2 3 4 5
KILOMETRES
Existing 29.93mt Mineral Resource
has been defined over 24km of
Additional exploration potential
strike length of 42km identified
Page 7 of 14
Funding and Joint Venture
The Yangibana UJV intends to seek project-level debt funding with a target minimum gearing of 50%,
subject to lender due diligence and approvals. Hastings is assessing strategic investment, government-
backed financing and other options to fund its 40% share. No binding financing arrangements have been
entered into, and there is no certainty that funding will be secured on acceptable terms or at all. FID will
not occur until the joint venture participants are satisfied that funding is in place.
As announced with the updated DFS, Wyloo has started a process to sell its 60% participating interest in
the Yangibana UJV. The sale process is ongoing and, at the date of this report, no binding agreement has
been announced.
Downstream processing options for Yangibana concentrate, including processing at the Thailand plant,
are still being evaluated. No decision has been made, and the updated DFS does not include any costs
or revenue from downstream processing.
Production target and forecast financial information
The production target and forecast financial information derived from the production target referred to
in this report were first reported in the Company’s ASX announcements titled “Updated DFS Confirms
De-Risked Pathway to Production” and “Updated DFS Confirms De-Risked Pathway to Production
Revised”, both dated 13 July 2026. The production target is based 100% on Proved and Probable Ore
Reserves; no Inferred Mineral Resources or Exploration Targets are included. The Company confirms
that all material assumptions underpinning the production target and the forecast financial information
derived from it, as set out in those announcements, continue to apply and have not materially changed.
Development of Stage 1 requires funding of approximately A$333.4 million (100% basis) and there is no
certainty that this funding will be secured.
BROCKMAN RARE EARTHS AND NIOBIUM PROJECT (HASTINGS 100%)
The Brockman Rare Earths and Niobium Project is located approximately 16 kilometres south-east of
Halls Creek in the East Kimberley region of Western Australia and hosts an Inferred Mineral Resource of
41.6Mt at 0.35% Nb₂O₅ and 0.20% TREO. Brockman material is included in the metallurgical test work
being carried out with Enuo under the Technical Services and Research Agreement, which is looking at
processing options, including the potential recovery of niobium and other by-products. No material new
exploration or metallurgical results were reported during the Quarter and the Brockman Mineral
Resource is unchanged.
CORPORATE
Annual Report and Corporate Governance
On 30 September 2026, Hastings lodged its Annual Report for the year ended 30 June 2026, together
with its Appendix 4G and Corporate Governance Statement.
Capital Structure
Securities on issue as at 30 September 2026:
Page 8 of 14
Class Number
Fully paid ordinary shares (ASX: HAS) 234,317,116
Unlisted options (exercisable at $1.00, expiring 8 December 2028) 1,500,000
Performance rights 564,071
There were no other issues of securities during the Quarter. Subsequent to the Quarter, Hastings will
issue 23,000,000 fully paid ordinary shares to Enuo as consideration for the Thailand acquisition (refer
Events Subsequent to the Quarter).
FINANCIAL POSITION
Hastings had cash and cash equivalents of $1.85 million as at 30 September 2026 (30 June 2026: $3.71
million). Net cash used in operating activities during the Quarter was $1.14 million, comprising staff costs
of $0.61 million, administration and corporate costs of $0.40 million and interest and other finance costs
of $0.17 million, partly offset by interest received of $0.03 million.
Net cash used in investing activities was $1.56 million. This comprised payments of $1.07 million for
equipment relating to the Yangibana UJV, $1.10 million for operational readiness costs at the Thailand
plant and $0.07 million for exploration and evaluation, partly offset by a $0.68 million refund of
withholding tax previously deducted from dividends on the Company’s former investment in Neo
Performance Materials Inc.
Net cash from financing activities was $0.84 million, comprising the net proceeds of the August 2026
placement ($1.02 million after costs) less lease principal repayments of $0.18 million.
In accordance with Listing Rule 5.3.5, payments of $234,000 were made to related parties and their
associates during the Quarter, comprising directors’ fees, company secretarial fees and consultancy fees
paid to directors and director-related entities (refer item 6 of the accompanying Appendix 5B).
CORPORATE & SUSTAINABILITY
Health and Safety
Yangibana remained in care and maintenance during the Quarter, with site activities managed by Wyloo
as manager and operator. No mining production or development activities took place. Safety
performance at site was stable through FY26. Reported events were mostly low-consequence and
related to care and maintenance work, and all findings from a regulator site inspection during FY26 have
been addressed. The Emergency Response Arrangements, Mine Safety Management Plan and
operational risk registers have been updated, and a site Mine Safety Management System audit was
scheduled for the September 2026 quarter.
Page 9 of 14
Environment
Environmental work at Yangibana during the Quarter consisted of ongoing statutory reporting and
compliance monitoring under the Project’s existing approval conditions, including groundwater licence
monitoring and reporting and obligations under the Project’s Part V licence under the Environmental
Protection Act 1986 (WA). The site remained compliant with its environmental obligations, with no
outstanding compliance tasks reported. Existing approvals are being updated to reflect the updated DFS,
and approvals for the proposed expansion project remain on hold.
EVENTS SUBSEQUENT TO THE QUARTER
On 28 October 2026, Hastings announced that it had completed the acquisition of a 49% interest in
BZNM, the owner of the Thailand plant, on 27 October 2026 (refer ASX announcement “Hastings
completes acquisition of 49% interest in Thailand Hydromet Plant”). Total consideration remains capped
at US$15 million, in line with the terms announced on 31 March 2026. It comprises a cash deposit of
US$0.5 million (already paid), equity consideration of US$8.0 million, a US$1.0 million commissioning
payment payable by 30 November 2026, which Enuo has applied towards commissioning costs, and
deferred cash consideration of US$5.5 million.
As part of the consideration, Hastings is required under the sale and purchase agreement with Enuo
(“SPA”) to issue 23,000,000 fully paid ordinary shares to Enuo at an agreed issue price of A$0.50 per share
(US$8.0 million). The shares are proposed to be issued under Hastings’ Listing Rule 7.1 placement
capacity and, upon issue, are expected to represent approximately 9% of Hastings’ enlarged issued share
capital. Under the SPA, Enuo cannot sell or transfer the consideration shares for six months from their
issue date without Hastings’ prior written consent. The deferred cash consideration is payable in two
instalments of US$3.0 million and US$2.5 million on the first and second anniversaries of commercial
production, less applicable deductions, and only if all requirements of the contractual production and
sales performance trigger are met at the relevant payment date.
Installation and upgrade works are continuing towards a planned nameplate capacity of approximately
12,000 tonnes per annum of MREC. Following completion of the remaining works, the plant will move to
testing and commissioning, with first MREC production targeted for Q2 CY2027, subject to successful
commissioning, followed by a progressive ramp-up. Initial operations do not depend on concentrate
supply from the Yangibana UJV. A binding feedstock supply agreement with Enuo for a minimum of
10,000 tonnes per annum of monazite concentrate is in place, and Hastings has received enquiries from
prospective feedstock suppliers and MREC customers in the United States, Europe and Asia.
Hastings has started preparing an application to the BOI for investment promotion which, if granted,
may permit BZNM to be majority foreign-owned and give Hastings the flexibility to consider increasing
its interest from the current 49%. Hastings has also begun negotiations to increase its shareholding in
BZNM to 51% or more. Any increase would require agreement with BZNM’s other shareholders and any
required regulatory approvals.
Page 10 of 14
On 6 October 2026, Hastings advised that its 2026 Annual General Meeting will be held at 10:00am (WST)
on 27 November 2026, and that nominations for election as a director must be received by the Company
by 16 October 2026.6
Authorised by the Board for release to the ASX.
FOR FURTHER INFORMATION CONTACT:
Charles Lew Vince Catania
Executive Chairman Chief Executive Officer
+65 6220 9220 +61 8 6117 6118
6
See HAS ASX Announcement "AGM Date and Director Nominations" dated 6 October 2026.
Page 11 of 14
ABOUT HASTINGS TECHNOLOGY METALS LIMITED
Hastings Technology Metals Limited is a Perth-based rare earths and critical minerals company advancing Australian
resource projects and downstream rare earth processing in Thailand.
Hastings holds a 40% participating interest in the Yangibana Rare Earths and Niobium Project in the Gascoyne region
of Western Australia. Wyloo holds the remaining 60% participating interest and is manager and operator of the
Yangibana UJV. Yangibana has a planned initial mine life of 19 years and a neodymium and praseodymium (NdPr)
to Total Rare Earth Oxide ratio of up to 52% in some areas of the orebody. NdPr is used in permanent magnets for
electric vehicles, wind turbines, robotics and other technologies. The project is fully permitted for development.
The Company also holds a 49% interest in BZNM Co Ltd (BZNM), owner of the Kabin Buri hydrometallurgical
processing plant in Thailand. The plant is intended to process third-party monazite concentrate into Mixed Rare
Earth Chloride (MREC) for downstream separation and refining, providing a production pathway independent of
Yangibana’s development timetable.
The current plant upgrade programme targets approximately 12,000 tonnes per annum of MREC output capacity,
with first production targeted for Q2 CY2027, subject to completion of the planned works and successful
commissioning. Hastings is also evaluating a longer-term expansion to approximately 36,000 tonnes per annum,
subject to technical assessment, commercial arrangements, funding and required approvals. The plant is
approximately 175 kilometres from Laem Chabang Deep-Water Port, providing access to international shipping
routes.
Page 12 of 14
Hastings also holds a 100% interest in the Brockman Rare Earths and Niobium Project in the East Kimberley, WA,
which is subject to ongoing metallurgical test work in partnership with Enuo Holdings Pte Ltd. For more information,
please visit www.hastingstechmetals.com
FORWARD LOOKING STATEMENTS
This report contains forward-looking statements regarding Hastings’ intentions, expectations, plans, strategies,
targets and prospects, including in relation to the Yangibana Project and the Thailand plant, which may or may not
be achieved. Words such as “expect(s)”, “believe(s)”, “will”, “may”, “anticipate(s)”, “target(s)”, “potential(s)” and similar
expressions are intended to identify forward-looking statements, which include statements regarding future
production, construction and commissioning timetables, resources or reserves and economic outcomes. Such
statements are based on assumptions which may not be met and are subject to known and unknown risks and
uncertainties, many of which are beyond the control of the Company, that could cause actual results to differ
materially from those expressed or implied. No representation or warranty, express or implied, is made by the
Company or any of its directors, officers, employees, advisers or agents that any intention, expectation, plan or
target will be achieved, either totally or partially. There can be no assurance that Hastings’ plans for the Yangibana
Project or the Thailand plant will proceed as currently expected, or that funding will be secured on acceptable terms
or at all.
These risks and uncertainties include, but are not limited to: (i) risks relating to the interpretation of the geology,
grade and continuity of mineral deposits and conclusions of economic evaluations, (ii) risks relating to possible
variations in reserves, grade, planned mining dilution and ore loss, or recovery rates, and changes in project
parameters as plans continue to be refined, (iii) the potential for delays in development, construction and
commissioning activities, (iv) risks related to commodity price and foreign exchange rate fluctuations, (v) risks
related to failure to obtain adequate financing on a timely basis and on acceptable terms, or delays in obtaining
governmental approvals, (vi) risks relating to feedstock supply, product specifications and customer acceptance,
and (vii) other risks and uncertainties related to the Company's prospects, properties and business strategy. Readers
are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of
this report. The Company is under no obligation, and does not undertake, to update or revise any forward-looking
statement, whether as a result of new information, future events or otherwise, except as required by law.
In particular, any financial projections previously released by the Company in relation to the Thailand plant, including
in the Company's ASX announcements dated 14 April 2026 (“Hastings Secures Monazite Feedstock for Thai
Hydromet Plant”) and 22 April 2026 (“Hastings Reveals Thai Hydromet Plant Flowsheet”), are unaudited internal
management estimates prepared by the Company. They are based on assumptions that the Company considered
reasonable at the time they were prepared, but which are inherently subject to significant uncertainties and
contingencies, many of which are outside the Company's control. Actual production volumes, revenues, costs and
cash flows may differ materially from those projections. The projections have not been reviewed or audited by an
independent third party, do not constitute a profit forecast or financial product advice, and investors should not
place undue reliance on them.
CAUTIONARY STATEMENT
The updated DFS referred to in this report has been prepared to a Class 3 (Feasibility Study) level of accuracy of
±15%. The production target and forecast financial information referred to in this report are based entirely on
Proved and Probable Ore Reserves; no Inferred Mineral Resources have been included in the mine schedule or
attributed any value in the underlying Ore Reserve pit designs.
Funding of approximately A$333.4 million (100% basis) will be required to complete Stage 1 of the Yangibana Project.
There is no certainty that the Yangibana UJV will secure this funding on acceptable terms, or at all, and the timing of
a Final Investment Decision remains subject to funding being secured. Production, cost and revenue estimates
Page 13 of 14
referred to in this report are forward-looking and based on a number of assumptions, including rare earth oxide
pricing, foreign exchange rates and concentrate payability, each of which is inherently uncertain and beyond the
Company's control.
COMPETENT PERSON’S STATEMENT
The information in this report that relates to exploration results for the Yangibana Rare Earths and Niobium Project
(“Yangibana”), and other exploration activities, is based on information compiled by Dr Louis Schürmann, a full-time
employee of Hastings Technology Metals Ltd and a Fellow of the Australasian Institute of Mining and Metallurgy
(AusIMM Member No. 308067). Dr Schürmann has sufficient experience relevant to the styles of mineralisation and
types of deposits under consideration and to the activities undertaken to qualify as a Competent Person as defined
in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves (JORC Code). Dr Schürmann consents to the inclusion in this report of the matters based on his information
in the form and context in which they appear.
COMPLIANCE STATEMENT (LISTING RULE 5.23)
The Yangibana Mineral Resource Estimate referred to in this report was first reported by the Company in its ASX
announcement titled “Drilling along 8km long Bald Hill – Frasers Trend Increases Indicated Mineral Resources by
50%” dated 11 October 2022. The Yangibana Ore Reserve was first reported in the Company’s ASX announcement
titled “Yangibana Ore Reserve Increase by 25%” dated 6 February 2023. The Brockman Mineral Resource estimate
was first reported in September 2011 in accordance with the 2004 Edition of the JORC Code and was subsequently
updated in January 2021 to comply with the JORC Code (2012). These announcements are available to view on the
Company’s website.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in previously released market announcements relating to Mineral Resources and Ore Reserves and that all
material assumptions and technical parameters underpinning those estimates continue to apply and have not
materially changed. The Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original market announcements.
Page 14 of 14
APPENDIX – MINING TENEMENTS HELD
As at 30 September 2026 (all tenements are in Western Australia)
Yangibana Project
Yangibana Jubilee Pty Ltd (40%) / Wyloo Gascoyne Pty Ltd (60%) - Live
E09/1700 E09/1703 E09/1705 E09/1706 E09/1943 E09/1944 E09/1989
E09/2007 E09/2018 E09/2084 E09/2086 E09/2095 E09/2129 E09/2137
E09/2296 E09/2333 E09/2334 E09/2364 E09/2403 G09/10 G09/11
G09/13 G09/14 G09/17 G09/18 G09/20 G09/21 G09/22
G09/23 G09/24 G09/25 G09/26 G09/27 G09/28 G09/29
L09/66 L09/67 L09/68 L09/69 L09/70 L09/71 L09/72
L09/74 L09/75 L09/80 L09/81 L09/82 L09/83 L09/85
L09/86 L09/87 L09/89 L09/91 L09/93 L09/95 L09/96
L09/97 M09/157 M09/158 M09/159 M09/160 M09/161 M09/162
M09/163 M09/164 M09/165 M09/176 M09/177 M09/178 M09/179
Yangibana Project
Gascoyne Metals Pty Ltd (100%) - Live
E09/1704 E09/2298 E09/2404
Brockman Project
Brockman Project Holdings Pty Limited (100%) P80 Live; E80 Pending
P80/1626 P80/1628 P80/1629 P80/1630 E80/5248 E80/5977 E80/5978
No mining tenements were acquired or disposed of during the Quarter, and there were no changes to beneficial
percentage interests held in farm-in or farm-out agreements.
Yangibana Jubilee Pty Ltd, Gascoyne Metals Pty Ltd and Brockman Project Holdings Pty Limited are wholly owned
subsidiaries of Hastings. The Yangibana Project tenements are held under the Yangibana UJV with Wyloo Gascoyne
Pty Ltd (60%), established on 21 September 2025.
Rule 5.5
ASX Listing Rules Appendix 5B (01/12/19) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Hastings Technology Metals Ltd
ABN Quarter ended (“current quarter”)
43 122 911 399 30 September 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
- -
(a) exploration & evaluation (if expensed)
(b) development - -
(c) production - -
(d) staff costs (605) (605)
(e) administration and corporate costs (396) (396)
1.3 Dividends received (see note 3) - -
1.4 Interest received 28 28
1.5 Interest and other costs of finance paid (166) (166)
1.6 Net income taxes (paid)/recovered - -
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material) - -
1.9 Net cash from / (used in) operating
activities
(1,139) (1,139)
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (01/12/19) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
2. Cash flows from investing activities
- -
2.1 Payments
Share your feedback
Discover