MBK: Executing WA Gold Strategy
Released
Released
Announcement PDF
ASX ANNOUNCEMENT 10 September 2025
ASX: MBK
Executing WA Gold Strategy
Terms agreed to acquire the gold assets of Hastings Technology Metals Ltd
(HAS), including the Whiteheads Project, for MBK shares, subject to binding
documentation and other conditions precedent
Livingstone Scoping Study for the Kingsley and Homestead deposits is
underway
Livingstone and HAS’ Whiteheads projects well placed for further
exploration and fast-tracking to production
Metal Bank Limited (ASX:MBK) (‘MBK’ or ‘the Company’) advises that it has signed a non-binding
term sheet (Term Sheet) with Hastings Technology Metals Ltd (ASX:HAS) (HAS) for the acquisition
of the gold assets of HAS, (subject to due diligence, binding documentation and other conditions
precedent including MBK shareholder approval) (Proposed Acquisition), and has commenced a
scoping study for the Kingsley and Homestead deposits at the Livingstone Project, furthering its
Western Australian focussed gold strategy to expand MBK’s WA gold portfolio and move to
production.
Expanding MBK’s WA gold portfolio – HAS to vend its WA gold assets into MBK for shares*
In accordance with the Term Sheet, MBK is to acquire:
Great Western Gold Pty Ltd (GWG), the holder of a 75% interest in the Whiteheads Gold
Project JV tenements and other tenements 100% held by GWG (refer Appendix 1), covering
~380km2 located approximately 80km NE of Kalgoorlie (Whiteheads Project);
Ark Gold Pty Ltd (Ark), the holder of the Ark gold project, comprising two exploration
licences located approx. 40km southeast of HAS’ Yangibana Project, 250 km northeast of
Carnarvon in Western Australia (Ark Project); and
The Darcy’s gold project comprising 3 exploration licenses covering an area of ~ 100km2
situated adjacent to HAS’ Brockman Niobium and Heavy Rare Earths Project in the East
Kimberley region of Western Australia (Darcy Project).
*The Proposed Acquisition is subject to satisfactory completion of mutual due diligence, which is
currently in progress, signing of binding documentation, MBK shareholder approval under Listing
Rule 7.1 and other necessary approvals, including ASX review pursuant to Listing Rule 11.1.
As consideration for the Proposed Acquisition, MBK will issue to HAS MBK Shares (Consideration
Shares) for a total value of $2,300,000, at a share price of $0.014373, being the 10 day VWAP at
the date of signing the term sheet. The consideration comprises $2,000,000 for the HAS Gold
Assets plus $300,000 for the cash balance to be held by GWG at Completion.
Metal Bank Limited ABN: 51 127 297 170
Telephone: +61 2 9078 7669| Facsimile: +61 2 9078 7661| Email: info@metalbank.com.au
Suite 506, Level 5, 50 Clarence Street, SYDNEY NSW 2000 | GPO Box Q128 Queen Victoria Building NSW 1230 Australia
www.metalbank.com.au
A deferred consideration of $800,000 to the vendors of Whiteheads and subject to defined
resource milestones being achieved remains payable by HAS over the next five years 1.
It is the intention of HAS to seek approval of its shareholders to the distribution of the
Consideration Shares in-specie to its shareholders, following completion of the acquisition.
Charles Lew will join the board of MBK as a non-executive director and the Board has agreed to
appoint Tim Gilbert, currently Chief Operating Officer with HAS, as MBK’s new CEO following
completion. Ines Scotland will remain as MBK’s Chair in a non-executive role.
Mr Gilbert is a mining engineer with more than four decades of experience in a range of senior
roles in the resources sector across multiple commodities, including battery and base metals,
diamonds and gold. His expertise covers a range of strategic, operational, construction and
technical roles for major contractors including Theiss, as well as global mining companies including
Rio Tinto, Newmont and Gold Field Australia where he was VP Operations and previously General
Manager, Agnew Gold Mine.
A summary of the agreed terms for the Proposed Acquisition is set out later in this release.
Fast-tracking Livingstone and Whiteheads to production.
MBK has commenced a scoping study for the Homestead and Kingsley deposits at Livingstone.
These projects hold JORC 2012 Mineral Resource Estimates 2 from surface of:
o 1.68Mt @ 1.35g/t Au for 73.0koz Au, 100% Inferred at Kingsley;
o a total of 1.00Mt @ 1.35g/t Au for 43.4koz Au at Homestead, comprising 83% Indicated –
821Kt @1.37g/t Au for 36.2koz Au and 17% Inferred – 183Kt @1.22 g/t Au for 7.2koz Au;
Mark Cossom and Peter Lester are managing the scoping study for MBK and a mine services group
has been engaged to undertake the necessary pit design and technical work. Mark is a consultant
geologist and was formerly managing director of Gateway Mining Ltd and prior to that General
Manager – Geology and Exploration with Doray Minerals Ltd. Peter Lester is a consultant mining
engineer to MBK with over 40 years’ experience in the mining industry.
In addition, MBK has engaged the services of Stuart Stephens to provide exploration management
services for the Livingstone project, including progressing mining proposals and necessary
approvals required to proceed to production. Stuart is a geologist and former Exploration Manager
at Gateway Mining with extensive experience in the WA mining and environmental regulatory
framework.
Since acquiring Whiteheads earlier this year, HAS has developed a strategy of fast-tracking the
Seven Leaders and Blue Poles deposits to open pit. HAS will commence drilling at Whiteheads in
the coming weeks for a maiden JORC Resource and small mining proposals and associated
approvals will follow.
1
2
HAS ASX Release 21 August 2025 “Hastings Completes Acquisition of Whiteheads Gold Project”
MBK ASX Release 17 March 2025 “MBK Delivers Significant Increase to Livingstone Au Resource”
Page | 2
MBK’s Chair Ines Scotland commented: “Adding the HAS gold assets plus experienced
management to MBK provides MBK with scale for future gold production. The HAS gold projects
complement our strategy for the Kingsley and Homestead projects at Livingstone that we are now
advancing to Scoping Study stage. The HAS acquisition furthers our strategy of building a gold
portfolio in WA with assets that have the potential for near term production utilising nearby thirdparty processing infrastructure, as well as significant exploration upside. We are looking forward
to welcoming Charles Lew to the Board and Tim Gilbert joining as CEO to assist us in implementing
our strategy.”
Commenting on the Term Sheet for sale of Hastings’ gold assets, Hastings Executive Chairman,
Mr Charles Lew said:
“I am pleased to see the strategic integration of our Whiteheads Project with Metal Bank’s
Livingstone Project, creating a promising pathway toward early cash flow through the Seven
Leaders deposit. The addition of Hastings gold assets, complemented by experienced management
and a clear focus on near-term production opportunities in WA, positions the enlarged company
well for future growth. Capitalising on the strong gold price and a talented management team,
we aim to realize the full potential of these assets and to advancing our shared strategy for building
a robust gold portfolio."
HAS WA Gold Assets
Figure 1: HAS Gold Assets locations
Page | 3
Whiteheads
The Whiteheads project is located 80km north of Kalgoorlie in a world class minerals province with
several operating processing plants within trucking distance for toll treatment.
HAS acquired the project earlier this year following completion of separate Tenement Purchase
Agreements between GWG and each of Great Boulder Resources Limited (ASX:GBR), Mithril Silver
and Gold Limited and Aberdeen Pty Ltd, consolidating ownership of the Project’s tenements by
GWG with 100% ownership or 75% for eastern tenements subject to JV with Zebina Minerals 3
(refer Appendix 1). Great Boulder Resources Limited (ASX:GBR) acquired Whiteheads in 2019 and
amalgamated the eastern and western halves of the project via joint venture and farm-in
agreements. Prior to this ownership was fragmented and much of the area was underexplored.
GBR conducted extensive exploration with results previously announced to ASX by GBR.
Figure 2: Whiteheads Project location
The Whiteheads Project comprises a significant tenement package, including 13 exploration
licences, one prospecting licence and 1 mining lease (not currently in production) covering
approximately 380 sq kms, with walk-up drill targets, multiple prospects and untested surface gold
anomalies. The Whiteheads Project benefits from excellent access via sealed and well-maintained
unsealed roads, well-established infrastructure and proximity to operating mines, including
3
Refer HAS ASX Release dated 21 August 2025 “Hastings Completes Acquisition of Whiteheads Gold Project”
Page | 4
Northern Star Resources Ltd (ASX:NST) Kanowna Belle mine 40kms to the south. The project
location also offers potential access to significant nearby third-party processing capacity, which
could provide future pathways for toll treatment options. HAS has committed $500,000 to
expedite development work during the due diligence period ensuring that exploration and
permitting works continue.
The project has significant exploration upside supported by over 10,000 metres of historical
drilling, extensive soil sampling, gravity surveys and geochemical programs, which has enabled
HAS to commence execution of a systematic exploration program aimed at fast-tracking early
development options. HAS’ initial RC and AC drilling campaigns are focussed on testing extensions
and infilling key prospects, including Blue Pole, Lady Betty and Seven Leaders, to underpin a
maiden Mineral Resource Estimate. Entech has been appointed by HAS to assist with scoping
studies to assess mining potential utilising third party processing options.
Ark
The Ark Project consists of approximately 90km2 of Exploration licences adjacent to the Yangibana
REE Project 250 km northeast of Carnarvon in Western Australia. The tenements cover a portion
of the folded Narimbunna Dolerite sequence within the Proterozoic Capricorn Orogen in Western
Australia’s Gascoyne region.
In recent years, there has been increased interest in the gold prospectivity in the Gascoyne region.
In January 2025, Benz Mining Corp (ASX:BNZ) acquired the 510koz Glenburgh Gold Project and has
since delivered a new high grade gold discovery 4 and in May 2025, committed to 30,000 metres
of drilling at this project 5. In addition, Western Yilgarn (ASX:WYX) is also exploring for gold in the
region, following the acquisition of three exploration licences (E09/2986, E09/2987 and E09/2988)
covering a total area of 201km2 300km east of Carnarvon 6.
Darcy Project
The Darcy Project consists of 3 exploration licences covering approximately 100km2 in the East
Kimberley region of Western Australia, immediately adjacent to the Nicolsons Gold Mine and
within the historical Halls Creek gold mining area which hosts known base and precious metal
mineralisation. The Butcher’s Creek Au project (5.23Mt @ 1.91g/t Au for 321koz Au 7) held by WIN
Metals (ASX:WIN) is located several kilometres east.
The Darcy’s Gold Project currently forms part of the REE tenements for HAS’ Brockmans Project
and as a condition subsequent to completion, HAS has agreed to transfer the relevant gold project
tenement to MBK following their separation from the REE tenements.
Refer BNZ ASX Release dated 3 April 2025 “Benz Delivers a new high grade gold discovery at Glenburgh”
Refer BNX ASX Release dated 21 May 2025 “30,000m drilling program launched at the Glenburgy Gold Project”
6
Refer WYX ASX Release dated 6 May 2025 “WYX Secures new gold project within Gascoyne region in Western
Australia”
7
Refer WIN ASX release dated 16 April 2025 “WIN advances Butchers Creek towards development following
Resource Update”
4
5
Page | 5
MBK WA Gold Assets
Livingstone
The Livingstone Project is an advanced gold exploration project with 122,500oz of defined gold
resources and multiple exploration targets1. Located 140km northwest of Meekatharra in Western
Australia, it includes 395km2 of granted exploration licences covering the entire western arm of
the Proterozoic Bryah-Padbury Basin (host to the Fortnum, Horseshoe and Peak Hill gold deposits
and >2Moz Au endowment) (Figure 3).
Figure 3: Livingstone Project location within Bryah Basin and relative to other gold operations
The Livingstone Project holds JORC 2012 Mineral Resource Estimates from surface:
o Kingsley Deposit: 1.68Mt @ 1.35g/t Au for 73.0koz Au, 100% Inferred;
o Homestead: 1.00Mt @ 1.35g/t Au for 43.4koz Au, comprising 83% Indicated – 821Kt
@1.37g/t Au for 36.2koz Au and 17% Inferred – 183Kt @1.22 g/t Au for 7.2koz Au; and
o Winja: 125Kt @ 1.53g/t Au for 6.2koz Au, 100% Inferred,
for a project total of 2.8Mt @ 1.36g/t Au for 122.6koz Au (70% Inferred, 30% Indicated) 8.
8
MBK ASX Release 17 March 2025 “MBK Delivers Significant Increase to Livingstone Au Resource”
Page | 6
In addition, Livingstone also hosts an existing Exploration Target at Kingsley East of 290–400Kt @
1.8–2.0g/t Au for 16.8k to 25.7koz Au 9 plus numerous other high grade drill intersections on other
targets, including results up to 4m @ 6.26g/t Au 10 at the Livingstone North prospect.
It should be noted that the potential quantity and grade of the Exploration Target is conceptual in
nature and there is insufficient drilling information to estimate a Mineral Resource over the
Exploration Target area and it is uncertain if further exploration will result in the estimation of a
Mineral Resource over this area. The Exploration Target is located along strike to the East of the
existing Inferred Mineral Resource at Kingsley and has been subject to limited RC drilling which
provides an indication of volume and grade of mineralisation. It is supported by the extrapolation
of the Inferred Mineral Resource at Kingsley, the existing interpretation of continuity of host
geology, consistent strike of structural fabric supported by geophysics, significant soil
geochemistry anomalism and previous drill results. For further details, refer to MBK’s ASX Release
of 18 January 2022: “Kingsley Deposit Maiden Mineral Resource Estimate and updated Exploration
Target”.
Figure 4: Livingstone Project showing simplified geology, tenements, resources and prospects
The Company has defined numerous gold targets over more than 40km of strike length, with
limited drill testing or which remain untested. These gold targets include (Figure 4):
o Dampier and Drake (west along strike of Livingstone North)
9
MBK ASX release 18 January 2022: “Kingsley Deposit Maiden Resource Estimate and updated Exploration Target”
MBK ASX release 22nd November 2022: “Shallow High Grade Gold results at Livingstone North Prospect”
10
Page | 7
o Hilltop and VHF, located in the eastern part of the project
o A broad elongate structural/contact-related gold anomaly to the north of Livingstone
North including the Stanley and Stella prospects, and
o Other unnamed greenfield gold-in-soil anomalies/targets.
Forward Plan
The parties have agreed the following work programs for the Whiteheads and Livingstone
projects over the next 12 months, subject to completion of the Proposed Acquisition:
Whiteheads Project:
-
Undertake a drilling program to define a Maiden JORC Mineral Resource Estimate;
-
Progress an application for a mining licence and all necessary approvals;
-
Engage a mining contractor;
-
Pursue and secure toll treatment agreement for ore mined from the Whiteheads
projects.
Livingstone Project:
-
Prepare Scoping Study, including technical and engineering requirements and engaging
Stuart Stephens as Livingstone Exploration Manager
-
Apply for mining licence over Homestead and Kingsley projects;
-
Submit mining proposals for Homestead and Kingsley;
-
Pursue all necessary agreements and approvals for mining at Homestead and Kingsley,
including landowner and NT agreements;
-
Pursue and secure toll treatment agreement for ore mined from Homestead and Kingsley
projects.
Summary of Term Sheet
A summary of the key terms and conditions of the Term Sheet are set out below:
-
MBK to acquire all of the issued share capital of GWG and Ark, and as a condition
subsequent, the tenements relating to the Darcy’s Project from HAS.
Consideration of $2,300,000, to consist of 160,022,264 MBK Shares at $0.014373 per share
(being the 10 day VWAP of MBK’s shares as the date of signing the Term Sheet).
The term sheet is non-binding and is subject to:
o Completion of mutual due diligence;
o Signing of binding documentation;
o MBK receiving confirmation from ASX that for the purposes of LR 11.1, MBK is not
required to meet the requirements in Chapters 1 and 2 of the ASX Listing Rules in
connection with the Proposed Acquisition;
o GWG holding $300,000 in its bank account at completion;
Page | 8
-
-
-
-
o MBK Shareholder approval under Listing Rule 7.1;
o MBK Shareholders holding 13.7% of MBK’s shares delivering binding undertakings
to vote in favour of the Proposed Acquisition, with MBK using its best endeavours
to secure additional undertakings from shareholders holding at least 6.3%; and
o HAS, MBK and Ark entering into tripartite mineral rights agreement under which
HAS will retain all mineral rights regarding rare earths relating to the Ark Project
from completion.
Completion of the Proposed Acquisition will occur within 5 business days of the conditions
precedent being satisfied or waived, as the case may be.
Following Completion:
o Inés Scotland will move from Executive Chair to Non-Executive Chair;
o Charles Lew will join the board as a Non-Executive Director; and
o Tim Gilbert will join the company as Chief Executive Officer
Post Completion:
o HAS will transfer all tenements in respect of the Darcy Project to MBK;
o The Board of MBK will adopt an agreed work program including the Forward Plan
outlined above; and
o HAS will seek approval of its shareholders for the in-specie distribution of the
Consideration Shares to its shareholders by way of a return of capital as soon as
reasonably practicable following Completion.
The binding documentation will include usual warranties and indemnities from each party
to the other, including an indemnity from HAS in relation to obligations or liabilities arising
under HAS’ agreement for purchase of GWG, including the obligation to pay deferred
consideration achievement of certain milestones.
The parties have agreed to a 6-month exclusivity period in relation to the Proposed
Transaction.
Authorised by the Board
For further information contact:
Inés Scotland, Executive Chair
Email: ines@metalbank.com.au
or
Sue-Ann Higgins, Executive Director and Company Secretary
Email: sue-ann@metalbank.com.au
Page | 9
Competent Person Statements
The information in this report that relates to Exploration Results and Mineral Resource Estimates
has been extracted from various ASX Announcements referenced in this report and are available
to be viewed on the Company’s website at www.metalbank.com.au or through the ASX website at
www.asx.com.au (using ticker code “MBK”) .
The Company confirms that it is not aware of any new information or data that materially affects
the information included in the relevant ASX announcements and News Releases. In the case of
Mineral Resource estimates , all material assumptions and technical parameters underpinning the
estimates continue to apply and have not materially changed. The Company confirms that the form
and context in which the Competent Persons’ findings are presented have not been materially
modified from the original ASX announcements or News Releases.
Appendix 1
HAS Gold Assets and tenements
The HAS Gold Assets comprise the Whiteheads Project, Ark Project and Darcy Project with
tenements listed below:
Whiteheads Project
100% owned by Great Western Gold Pty Ltd:
• E27/538
• E27/582
• E27/584
• M27/505
75% owned by Great Western Gold Pty Ltd:
• E27/544
• E27/588
• E27/622
• E27/644
• E27/658
• E27/659
• E27/660
• E27/661
• E27/662
• P27/2439
Ark Project
100% owned by Ark Gold Pty Ltd
• E09/2385
• E09/2399
Darcy Project
100% held by Brockman Project Holdings Pty Limited
• E80/5248 (application pending)
Page | 10
Share your feedback
Discover