Annual Report to shareholders
Released
Released
Announcement PDF
Yangibana Rare Earths
and Niobium Project
Annual Report
2025
Annual Report 2025 | I
Acknowledgement of Country
Hastings Technology Metals Ltd acknowledges the Traditional Custodians of
Country and their connections to land, sea and community in the spirit of
cooperation and mutually beneficial objectives.
We pay our respect to their Elders, past and present, and extend that respect
to all Aboriginal and Torres Strait Islander peoples today.
We acknowledge the Traditional Custodians on the land in which we operate.
Corporate Information
ABN 43 122 911 399
Directors
Mr Charles Lew (Chairman)
Mr Guy Robertson
Mr Neil Hackett (resigned 12 June 2025)
Mr Bruce McFadzean (resigned 17 October 2024)
Mr Malcolm Randall
Mr Jean Claude Steinmetz
Joint Company Secretaries
Mr Guy Robertson
Mr Neil Hackett (resigned 12 June 2025)
II | Hastings Technology Metals
Registered office
Level 3, 5 Mill Street
Perth WA 6000
Telephone: +61 (8) 6117 6118
Principal place of business
Level 3, 5 Mill Street
Perth WA 6000 Australia
Share register
Automic Group
Level 5, 191 St Georges Terrace
Perth WA 6000
Telephone: +61 1300 288 664
Solicitors
Steinepreis Paganin – Perth WA Australia
Bankers
Westpac – Sydney NSW 2000 Australia
Auditors
PricewaterhouseCoopers
125 St Georges Terrace
PERTH WA 6000
Website
www.hastingstechmetals.com
Securities Exchange
Australian Securities Exchange
ASX Code: HAS
Annual Report 2025
Contents
Letter from the Chairman _______________________________________________________ 02
Executive Leadership Team______________________________________________________ 06
Review of Operations____________________________________________________________ 08
Environment, Social and Governance Review____________________________________ 12
Mineral Resources and Ore Reserves Statement ________________________________ 13
Tenement Schedule______________________________________________________________ 20
Directors’ Report_________________________________________________________________ 23
Corporate Governance Statement_______________________________________________ 48
Auditor’s Independence Declaration_____________________________________________ 49
Consolidated Statement of Profit or Loss and Other Comprehensive Income____ 50
Consolidated Statement of Financial Position ____________________________________ 51
Consolidated Statement of Changes in Equity ___________________________________ 53
Consolidated Statement of Cash Flows __________________________________________ 54
Notes to the Consolidated Financial Statements _________________________________ 55
Consolidated Entity Disclosure Statement _______________________________________ 96
Directors’ Declaration ___________________________________________________________ 97
Independent Auditor’s Report ___________________________________________________ 98
Additional Shareholder Information______________________________________________ 105
Annual Report 2025 | 1
Letter from the Chairman
Dear Shareholders,
It is my pleasure to present Hastings Technology Metals’
Annual Report for the financial year ended 30 June 2025.
A Transformative Year for Hastings
The last twelve months has been a transformative
year for the Company - one in which we materially
advanced the Yangibana Rare Earths and Niobium
Project (the “Project” or “Yangibana Project”) by entering
into a strategic partnership with Wyloo Metals which
strengthened our strategic positioning in bringing
Yangibana into production. During this period, we
added a maiden niobium resource estimate within the
Yangibana footprint reported at 6.74 million tonnes
grading 2,305 parts per million niobium pentoxide.
During the year we announced the acquisition of the
Whiteheads Gold Project near Kalgoorlie, completed
in August 2025. Shortly after, in September 2025, we
agreed to divest Whiteheads and other WA gold interests
to Metal Bank Limited. This transaction provides
shareholders with ongoing exposure to gold exploration
success while enabling Hastings to sharpen its focus on
advancing Yangibana.
2 | Hastings Technology Metals
Advancing the Yangibana Project
With the non-process infrastructure at Yangibana
built and operational, a defining development this
year was the formation of an unincorporated joint
venture (“Yangibana UJV” or “UJV”) with Wyloo Metals,
the privately owned metals and mining investment
company of Mr Andrew Forrest. The UJV represents a
step change in our ability to advance Yangibana Stage
1 toward production of a rare earth concentrate. It
brings complementary technical and financial capability,
deepens our project capital options, lighten our financial
burden and strengthens our credentials to secure
downstream partners. Together with Wyloo, who will
be the manager and operator of the Yangibana Project,
management has continued to focus on optimising
project design and process whilst maintaining a clear
pathway to get to construction readiness.
Building Global Strategic Partnerships
To progress options for a Stage 2 hydrometallurgy
downstream plant, we visited Saudi Arabia on a number
of occasions and presented our company and the
unique attributes of the Yangibana Project to Saudi
officials and investors as part of the government’s Vision
2030 economic diversification agenda. These visits
culminated in November last year, whereby we were
honoured to be selected by the Ministry of Investment
of Saudi Arabia (“MISA”) as one of nine parties for the
Global Supply Chain Resilience Initiative (GSCRI), a SAR
35 billion (US$9 billion / A$14 billion) program, and to
sign a non‑binding Memorandum of Understanding
establishing a framework for cooperation to develop an
integrated rare earths downstream processing supply
chain in the Kingdom. The MOU contemplates supplying
Yangibana rare earth concentrate to a joint venture
hydrometallurgy and oxides separation plants built in
the Kingdom. This strategic engagement complements
Yangibana’s development plan and provides a potential
pathway to capture additional value by producing rare
earth oxides closer to end markets.
Rare Earth Market Dynamics and Strategic
Importance
The geopolitical landscape for rare earths has evolved
materially in recent years. China has historically
dominated mining, processing and magnet production,
but Western governments, led by initiatives originating in
the United States and supported by partners in Australia
and Europe, are increasingly focused on reducing
that concentration through targeted industrial policy,
incentives for upstream and downstream capacity,
strategic partnerships and supply chain de risking
measures.
This global policy shift underscores the strategic
importance of the Yangibana Project. Our progress
on site and strategic partnership with Wyloo aligns
with western government efforts to establish resilient,
diversified supply chains for magnet rare earths and
related downstream capability. Yangibana is now the
most advanced rare earth project under construction
and is ready to progress to plant construction.
Magnet rare earth prices are expected to remain well
supported over the medium term as structural demand
from EVs, robotics, wind and other clean energy
technologies grows and Western policy measures to
reduce reliance on Chinese magnet supply increase
demand for secure non Chinese sources. Prices may
remain choppy as new projects and downstream
capacity come online and recycling and substitution
evolve, but with global market growth for rare earth
expanding at a compound annual growth rate in the
order of c.8–12% to 2030, demand for NdPr contained in
magnets is expected to increase materially. Many market
analysts have cited that total NdPr demand could rise
up to 3 times by 2030 relative to the mid 2020s as new
supply tries to catch up with anticipated demand. This
structural growth reinforces the strategic case for timely,
high integrity supply from projects such as Yangibana.
Annual Report 2025 | 3
Unlocking Niobium Potential at Yangibana
Yangibana also hosts niobium mineralisation alongside
its rare earth endowment. This niobium presents
the potential for valuable by product credits that can
improve project economics and diversify revenue
streams. We are advancing geological, metallurgical and
market assessments to quantify the scale, recoverability
and commercialising potential. We are mindful that
realising this value will require further technical work
and alignment with project development plans and
capital costs.
Diversifying Through Gold Projects
During FY2025 we moved decisively to diversify Hastings’
asset base and deliver direct value to shareholders
outside the rare‑earth sector. The execution of the term
sheet in May 2025 and subsequent acquisition in August
2025 of the Whiteheads gold project provided exposure
to an attractive near‑term opportunity at a low entry
cost. To rapidly crystallise that value, we have agreed to
dispose of Whiteheads together with our Ark and Darcy
tenements to Metal Bank, in a transaction that facilitates
an in‑specie distribution of Metal Bank shares directly
into the hands of Hastings’ shareholders. The combined
asset package — including Metal Bank’s Livingstone
project, which hosts a 122,000‑ounce gold resource and
is ready for a mining‑lease application — will be returned
to shareholders while allowing Hastings to remain
focused on advancing Yangibana.
4 | Hastings Technology Metals
Progressing Brockman – Niobium and
Heavy Rare Earths
Brockman has been part of the Hastings portfolio since
I took over the company in 2013. It is a 100% owned
niobium and heavy rare earths resource that offers
attractive strategic optionality alongside our Yangibana
light rare earth (NdPr) focus. Over the past decade
our primary effort has been on advancing Yangibana.
With the UJV now secured, we are able to broaden our
development attention.
In FY2026 we will commence a targeted evaluation of
options for our Brockman project investigating optimal
mining and processing routes, quantify potential
synergies with Yangibana, and evaluate cost, capital and
timing scenarios. The study intends to identify the most
value accretive development pathways for Brockman
and to inform how we prioritise capital and management
resources.
Leadership and Governance
In June, we appointed Mr Vince Catania as Chief
Executive Officer. Vince has a long association with the
Yangibana Project, having represented the constituency
that includes the Yangibana region during his time
in public office. After retiring from politics, he joined
Hastings in January 2023 as GM Corporate, led the
Yangibana UJV negotiations, and has overseen local,
state and Federal government interactions, Traditional
Owner engagements, environmental approvals and
investor and media engagement for Yangibana. His
deep regional knowledge and proven leadership give the
Board confidence as we transition from development to
delivery.
As the Group moves toward construction readiness at
Yangibana, Wyloo and ourselves will be enhancing our
ESG reporting and integrating best practice standards
into procurement and contractor selection.
I thank my fellow directors and the entire Hastings
team for their dedication and professionalism during a
transformative year. I also acknowledge the constructive
engagement of Wyloo Metals, MISA, Metal Bank, our
advisers and regional stakeholders. Above all, I am
grateful to our shareholders for your continued support
and patience as we advance through the complex
pathways on the many different initiatives as outlined.
Hastings enters FY2026 in a stronger, more focused
position: a plan to deliver Yangibana in a strategic
partnership with Wyloo, optionality from attractive non
core assets and a pragmatic approach to creating and
returning value to our shareholders.
The Board and management remain confident in the
long term opportunity for rare earths and associated by
products and in our ability to capture that opportunity
responsibly and profitably.
Clear Priorities for FY2026
Looking ahead to the next 12 months, our priorities
are clear:
• Progress the Yangibana UJV to final investment
decision readiness by advancing finance, offtake,
permitting and detailed engineering;
• Work with MISA to translate the GSCRI MOU into
practical downstream processing and offtake
outcomes that complement Yangibana’s upstream
value;
• Complete the Whiteheads disposal and the
associated in specie distribution process in a way
that maximises shareholder value while conserving
Hastings’ capital and sharpen operating focus; and
• Commence and deliver the Brockman feasibility
programme to establish the most value accretive
development plan.
Yours sincerely,
Charles Lew
Executive Chairman
Annual Report 2025 | 5
Executive Leadership Team
Hastings entered FY2025 with a revitalised leadership team, sharpened organisational
focus, and a clear mandate to deliver the Yangibana Rare Earths Project. The
appointment of Vince Catania as Chief Executive Officer, alongside strengthened
executive capability in operations and project delivery, reflects the Company’s
commitment to disciplined execution and stakeholder engagement. With a streamlined
structure and refreshed leadership, Hastings is well positioned to advance financing,
progress strategic partnerships, and unlock long-term value for shareholders.
Charles Lew
Vince Catania
Mr Lew has 30+ years’ of extensive investment
banking experience, having worked in London and
Singapore. He took over Hastings in December
2013 and working with two veteran geologists,
discovered the unique high grade NdPr ore
body in May 2014 and since then has invested
significantly and stewarded the Yangibana Project.
Mr Catania joined the company in early 2023
as General Manager of Corporate Affairs and
was instrumental in leading negotiations for the
strategic Joint Venture with Wyloo Metals for
the Yangibana Rare Earths and Niobium Project
before being appointed as CEO.
Executive Chairman
Between 1996 and 2000 he was the Managing
Director of ABN Amro’s regional investment
banking business in Singapore. Since leaving ABN
Amro in 2000, Mr Lew started his own investment
and asset management company, Equator Capital,
which evolved into a managed futures hedge fund
in which he relinquished active management in
2017 to focus on Hastings.
Mr Lew also served as Independent Non-Executive
Director of RHB Bank Group (Malaysia) from
2004 to 2016. He holds a BA (Hons) in Finance
from the University of East London and a MSc
in Management Science from Imperial College,
University of London.
As an entrepreneur he has successfully invested
in real estate, food & beverage and renewable
energy storage.
6 | Hastings Technology Metals
Chief Executive Officer
Prior to joining Hastings, Mr Catania has a
distinguished 18-year career as a Member of the
Western Australian Parliament, holding senior
roles in both Government and Opposition. In
his final term, he represented the expansive
electoral district of Northwest Central, the home
of Hastings’ Yangibana Project.
This extensive political background has equipped
Mr Catania with a robust understanding of
government agency processes and has forged
exceptional relationships at both State and
Federal levels. His deep experience in the region
provides him with a unique insight into the needs
of the community and key stakeholders, including
the Traditional Owners whose agreements are
critical to the project’s success.
As CEO, Vince is focused on steering the
Yangibana Joint Venture through development and
into production, ensuring strategic objectives are
achieved and value is delivered to shareholders
and partners.
Tim Gilbert
Addie Choon
Mr Gilbert is a senior mining executive with over
35 years’ experience in the resources sector across
multiple commodities, including battery minerals,
base metals, diamonds and gold. His expertise
covers a range of operational and technical roles
in both underground and open pit operations and
various ore processing plants.
Mr Addie Choon is a Chartered Accountant (CAANZ)
with strong experience in financial management,
reporting and advisory across both professional
services and listed companies. He stepped into the
role of Acting CFO at Hastings in April 2025.
Chief Operating Officer
Mr Gilbert has worked for major contractor Thiess
and global mining companies including Rio Tinto,
Newmont, Gold Fields, WMC, MIM, Covalent Lithium
and now Hastings. This work history has enabled
Mr Gilbert to have worked globally, Europe, Africa,
North America, Asia and of course Australia.
Mr Gilbert is responsible for operations, operational
readiness, health and safety, and exploration. Mr
Gilbert holds a B.Eng (Hons) in Mining Engineering
from the Camborne School of Mines and is a
MAusIMM.
Acting CFO
He began his career at KPMG, working closely with
exploration and mining clients before moving into
commercial roles, including as Finance Director of
an ASX-listed multinational. Addie has led finance
teams, managed audits and supported complex
transactions including acquisitions and due
diligence.
He holds a Bachelor of Commerce from the
University of Western Australia and is a member of
Chartered Accountants Australia and New Zealand.
Annual Report 2025 | 7
Review of Operations
Project Overview
Hastings Technology Metals is focused on developing
its flagship Yangibana Project, a strategically significant
source of neodymium and praseodymium (NdPr) critical
to the global clean energy transition and electric vehicle
supply chain. Located 250 km northeast of Carnarvon in
Western Australia’s Upper Gascoyne region, the Project
is situated on Gifford Creek Station within Thiin-Mah,
Warriyangka, Tharrkari and Jiwarli country.
During FY25, the Group maintained all tenements in
good standing while advancing preparations for the
next phase of construction of the beneficiation plant. In
parallel, the Group pursued opportunities to enhance
project economics and strengthen the overall value
proposition.
A key development was the declaration of a maiden
Niobium Mineral Resource within the Bald Hill and
Simon’s Find orebodies in September 2024, following
geological and metallurgical test work that confirmed
the potential for commercial extraction. This addition
not only diversifies the Project’s resource base but also
provides potential by-product credits to support future
revenue streams.
8 | Hastings Technology Metals
On 20 February 2025, the Group announced an exclusive,
non-binding term sheet with Wyloo Consolidated
Investments Pty Ltd and its related entities (“Wyloo”)
to establish a 60:40 unincorporated joint venture
(“Yangibana UJV” or “UJV”) over the Yangibana Project,
with Wyloo Gascoyne Pty Ltd appointed as manager and
operator. A key term of the agreement was the early
cancellation of all Wyloo Exchangeable Notes, partly
effected through the transfer of 8,350,311 shares in Neo
Performance Materials to Wyloo.
The parties executed a Transaction Agreement on 15
May 2025, and the transaction was completed on 21
September 2025 upon execution of the Joint Venture
Agreement. At completion, the remaining Exchangeable
Notes were cancelled, and the outstanding cash
consideration became payable to Wyloo, with settlement
due 45 days after completion. Establishment of the UJV
has materially de-risked project funding and significantly
reduced the Group’s residual equity requirement for its
40 percent interest, positioning the flagship Yangibana
Project to advance with greater certainty toward
production.
Project Delivery And Capital Review
Yangibana - Updated Capital Cost Estimate
Development activities at the flagship Yangibana Project
advanced steadily during FY25, with a particular focus on
delivery of non-process infrastructure and procurement
of long-lead items for the beneficiation plant. As at
30 June 2025, approximately 38% of the Project’s
total capital cost budget had been incurred, reflecting
disciplined execution against plan.
Capital cost
A$m
%
Processing Plant & NPI
201.0
42
Enabling Works1
114.1
24
Subtotal - Direct Capital Cost
315.1
67
Hastings Project Management
50.2
11
2
Other Indirects
81.3
17
Completion of the Yangibana UJV is expected to
accelerate the pathway to a Final Investment Decision
(FID) and subsequent commencement of full-scale
construction.
Subtotal - Indirect Capital Cost
131.5
28
Contingency/Reserve
26.9
6
Total Capital Cost
473.5
100
Incurred to 30 June 2025
180.0
38
Capital Position (as at 30 June 2025):
Remaining (incl. contingency)
293.5
62
• Total Capital Cost Budget: $474 million
• Capital Expenditure Incurred to Date: $180 million
• Remaining Capital Budget: $294 million (inclusive of
$27 million contingency)
6%
17%
42%
11%
24%
Processing Plant & NPI
Hastings Project Management
Contingency
Enabling works
Other Indirects
1
Enabling works - represents: equipment, roads, aerodrome, village,
borefields construction
2
Other indirects - represents: fuel, accommodation, IT & comms, health &
safety, consultants, insurances and other
Annual Report 2025 | 9
Development Activities
As at 30 June 2025, construction of the flagship Yangibana
Project was approximately 38% complete, with total
capital expenditure of $180 million incurred to date.
Progress during the year was primarily directed towards
non-process infrastructure and the procurement of longlead equipment for the beneficiation plant.
The Group has now acquired all major long-lead items,
which are currently in storage under preservation
routines. Deliveries continued throughout the year, with
key items including:
• acid bake kiln and off-gas scrubbing plant;
• SAG mill and regrind mill;
• thickeners, flotation cells and storage silos; and
• additional processing equipment packages.
With the majority of long-lead equipment now procured
and payments largely completed, forecast cash outflows
are expected to reduce significantly compared to
historical spend until mobilisation for main construction
works commences.
Niobium And Processing Test Work
A drilling campaign provided fresh niobium ore for
metallurgical test work. The first stage of testing,
undertaken in a certified laboratory, successfully
upgraded ore grading 0.41% Nb2O5 into a high-grade
concentrate assaying 50.59% Nb2O5.
The trial flowsheet involved grinding to P80=0.074
mm, gravity separation to remove slimes, low-intensity
magnetic separation to remove iron, high-intensity
magnetic separation to remove silicates, followed by
flotation comprising a rougher and four-stage cleaner
circuit. As expected at this stage of development,
recoveries were relatively low. The next phase of test
work is focused on improving recoveries through
optimisation of pre-concentration steps, flotation
conditions and flowsheet configuration.
Niobium test work continued through the latter part
of the year, building on the successful first stage and
further refining the process design. The Group remains
confident that additional niobium mineralisation will be
incorporated into the Yangibana resource and reserves
in due course and that a saleable niobium pentoxide byproduct stream can be established from Yangibana ore.
10 | Hastings Technology Metals
Portfolio Value Realisation –
Whiteheads Gold Project
In May 2025, the Group announced it had executed a
conditional binding term sheet to acquire 100% of the
shares in Great Western Gold Pty Ltd ("GWG"). This
transaction was completed on 21 August 2025. Through
this agreement Hastings secured GWG’s 75% joint
venture interest in the Whiteheads Gold Project, located
approximately 80 km north-east of Kalgoorlie in Western
Australia’s highly prospective Eastern Goldfields. The
Whiteheads Gold Project area spans about 380 km² and
comprises 14 licences, including 12 Exploration Licences,
one Prospecting Licence and one Mining Lease.
The consideration for the acquisition included an upfront
cash payment of $370,000 and the issue of 3 million fully
paid ordinary Hastings shares. Deferred consideration
of up to $800,000 in shares will become payable on
achievement of staged JORC-compliant Mineral Resource
milestones at 125,000 ounces, 250,000 ounces and
1,000,000 ounces of gold equivalent.
The Whiteheads Project is supported by a substantial
body of historical exploration work, including over
10,000 metres of drilling and extensive geochemical and
geophysical surveys. Several walk-up drill targets have
been identified alongside numerous untested anomalies,
providing near-term opportunities to advance exploration.
In September 2025, Hastings announced it had entered
into an agreement to divest the Whiteheads Gold Project
to Metal Bank Limited. This transaction is consistent
with the Group’s strategy of crystallising value from
non-core assets while maintaining exposure through
share consideration. Together with the Ark and Darcy
tenements already held by Hastings, the acquisition
and subsequent sale of Whiteheads reflects the Group’s
approach of leveraging its exploration expertise to
generate value, while remaining focused on advancing
the Yangibana Project.
Capital Raising
Loan Note
In October 2024, the Group entered into a senior
secured Project Loan Notes facility with a facility limit
of $5 million with long-term shareholder Equator
Capital Management Ltd. The initial subscription was
for $5 million, which was drawn down and settled on
31 October 2024. The funds were applied to project
costs associated with the staged development of the
Yangibana Project.
Placements
In March 2025, the Group completed a private placement
raising approximately $2.8 million before costs through
the issue of 8,730,000 fully paid ordinary shares
at $0.32 per share. Settlement funds for the entire
placement were received during the year. Of the total
shares, 7,480,000 were issued prior to year-end, with
the remaining 1,250,000 shares to be issued following
shareholder approval at the 2025 Annual General
Meeting.
Value Optimisation Studies
Geology and exploration
Mineralisation at the Yangibana Project occurs
predominantly within near-surface ironstone veins, which
are the weathered expressions of underlying ferrocarbonatite intrusives. The principal rare earth mineral is
monazite, hosted within iron oxides and hydroxides that
developed along major structural corridors between the
Lyons Creek Fault in the south and the Bald Hill Lineament
in the north. Additional occurrences have also been
identified along the margins of older granite intrusives.
Since the first drilling program in 2014, the Group
has progressively expanded its Mineral Resource and
Ore Reserve base through ongoing exploration and
metallurgical test work. As at 30 June 2025, the Yangibana
Project Mineral Resource stands at 29.93 million tonnes
at 0.93% TREO (0.32% Nd2O3 + Pr6O11), while the Proved
and Probable Ore Reserve is 20.93 million tonnes at 0.90%
TREO (0.33% Nd2O3 + Pr6O11). These estimates support
a projected mine life of at least 17 years and remain the
current published figures.
Exploration activity during FY25 focused on refining
targets along the eight-kilometre Bald Hill–Simon’s Find–
Fraser’s trend. This corridor is considered critical due to
its proximity to the proposed process plant site and is
expected to form the backbone of the initial ore supply
once operations commence.
In September 2024, the Group declared a maiden niobium
Mineral Resource at Yangibana, reported as 6.74 million
tonnes at 2,305 ppm Nb2O5 for 15,501 tonnes of contained
niobium pentoxide (Measured and Indicated). This initial
resource is located within the Bald Hill and Simon’s Find
deposits and demonstrates the potential for niobium to be
developed as a valuable by-product. Additional carbonatiterelated ironstone intrusions identified east of Bald Hill,
totalling around three kilometres of strike, highlight further
exploration upside. The Group expects that further drilling
will expand the niobium resource base across other
deposits in due course.
Refer to the Mineral Resources and Ore Reserves
Statement for further details of estimates, assumptions
and reporting standards.
Annual Report 2025 | 11
Environmental, Social and Governance
(‘ESG’) Review
During FY25, Hastings maintained its strong health, safety, and community performance as development progressed
at Yangibana. Highlights included:
• Zero lost time injuries and no recordable incidents were reported across the Group during the year.
• No heritage incidents were recorded and compliance with the Group’s voluntary Native Title Agreement was
maintained.
• In February 2025, the Department of Water and Environmental Regulation approved an amendment to the
Yangibana Works Approval under Part V of the Environmental Protection Act, ensuring permitting remains current
ahead of construction.
While a dedicated ESG or Sustainability Report will not be published for FY25, Hastings continues to align its practices
with recognised standards and frameworks and remains committed to safe, responsible and sustainable project
development.
12 | Hastings Technology Metals
Mineral Resources and
Ore Reserves Statement
Summary
This statement represents the Mineral Resources and Ore Reserves (“MROR”) for Hastings Technology Metals Ltd as
of 30 June 2025. This MROR statement has been compiled and reported in accordance with the guidelines of the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (“JORC
Code (2012)”).
This statement is to be reviewed and updated annually in accordance with Section 15 of the JORC Code (2012). The
nominated annual review date for this MROR statement is 30 June 2025.
The Company’s Rare Earth Mineral Resources at the Yangibana Project were announced in February 2023. The
information in this statement has been extracted from the relevant reports as indicated below in each Ore Reserve or
Mineral Resource table.
The Company has updated the Yangibana Mineral Resource to now include Niobium, which was anno