Annual General Meeting Presentation
Released
Released
Announcement PDF
1
Corporate Presentation November 2026
ADVANCING
TOWARDS RARE
EARTH
PRODUCTION
Delivering an Integrated Mine to Market Strategy
ASX:HAS
2
DISCLAIMER
This presentation has been prepared by Hastings Technology Metals Ltd (“Company” or “Hastings”). This presentation is not an offer, invitation, solicitation or other
recommendation with respect to the subscription for, purchase or sale of any securities in the Company. This presentation has been made available for information purposes only
and does not constitute a prospectus, short form prospectus, profile statement or offer information statement nor does it constitute investment or financial product advice (nor
taxation, accounting or legal advice) and it is not intended to be used as a basis for making an investment decision. This presentation is provided expressly on the basis that you will
carry out your own independent inquiries into the matters contained in the presentation and make your own independent decisions about the affairs, financial position or
prospects of the Company. The Company reserves the right to update, amend or supplement the information at any time in its absolute discretion (without incurring any obligation
to do so).
“This presentation does not purport to be all inclusive or to contain all information about the Company or any of the assets, current or future, of the Company. This presentation
contain summary information about the Company and its activities which is current as at the date of this presentation. The information in this presentation is of a general nature
and does not purport to contain all the information which a prospective investor may require in evaluating a possible investment in the Company or that would be required in a
prospectus or product disclosure statement or other offering document prepared in accordance with the requirements of Australian law or the laws of any other jurisdiction.”
To the maximum extent permitted by law neither the Company, nor its related bodies corporate, officers, their advisers, agents and employees accept any responsibility or liability
to any person or entity as to the accuracy, completeness or reasonableness of the information, statements, opinions or matters (express or implied) arising out of, contained in or
derived from this presentation or provided in connection with it, or any omission from this presentation, nor as to the attainability of any estimates, forecasts or projections set out
in this presentation. Any such responsibility or liability is, to the maximum extent permitted by law, expressly disclaimed and excluded. Nothing in this material should be construed
as either an offer to sell or a solicitation of an offer to buy or sell securities in the United States or any other jurisdiction where it would be illegal. It does not include all available
information and should not be used in isolation as a basis to invest in the Company.
FORWARD LOOKING STATEMENTS
This presentation contains reference to certain intentions, expectations, future plans, strategies, targets and prospects of the Company which may or may not be achieved. They
are based on certain assumptions, which may not be met or on which views may differ and may be affected by known and unknown risks. The performance and operations of the
Company may be influenced by a number of factors, many of which are outside the control of the Company. No representation or warranty, express or implied, is made by the
Company, or any of its directors, officers, employees, advisers or agents that any intentions, expectations or plans will be achieved either totally or partially or that any particular
rate of return will be achieved.
Given the risks and uncertainties that may cause the Company’s actual future results, performance or achievements to be materially different from those expected, planned or
intended, recipients should not place undue reliance on these intentions, expectations, future plans, strategies and prospects. The Company does not warrant or represent that
the actual results, performance or achievements will be as expected, planned or intended. The Company is under no obligation, and does not undertake, to update or revise any
forward looking statement, whether as a result of new information, future events or otherwise, except as required by law.
“In particular, recipients should be aware that the financial projections set out in this presentation which relate to the Thailand MREC Processing Plant are unaudited internal
management estimates prepared by the Company. The projections are based on assumptions that the Company considered reasonable as at the date of this presentation, but
which are inherently subject to significant uncertainties and contingencies, many of which are outside the Company’s control. The assumptions may prove to be incorrect and the
projections may not eventuate.Actual production volumes, revenues, cots and cashflows may differ materially from those projected. The financial projections have not been
reviewed or audited by an independent third party and are provided by management for indicative purposes only; they do not constitute a profit forecast or financial product
advice. Investors should not place undue reliance on those projections. Please refer to the slide in this presentation headed “Thai Plant Economic and Deal Structure” and to the
Company’s announcements dated 14 April 2026 (“Hastings Secures Monazite Feedstock for Thai Hydromet Plant” and 22 April 2026 (“Hastings Reveals Thai Hydromet Plant
Flowsheet”) for further details of such projections (including the assumptions which underpin them). No representation is made that any projection will be achievedThe recipient or
any prospective investor must do its own research and form its own judgment in relation to any assumption, forecast or estimate contained in this presentation and not rely on any
information in this presentation as being either absolute or the likely outcome. This presentation does not purport to exhaustively list the assumptions or risks which may influence
such projections.
COMPLIANCE STATEMENT (LISTING RULE 5.23)
The Mineral Resource Estimate referred to in this announcement was first reported by the Company in its ASX announcement “Drilling along 8km long Bald Hill – Frasers Trend
Increases Indicated Mineral Resources by 50%” dated October 2022. The Ore Reserve referred to in this announcement was first reported by the Company is its ASX
announcement “Yangibana Ore Reserve Increase by 25%” dated 6 February 2023. The announcements are available to view on the Company’s website. The Company confirms that
it is not aware of any new information or data that materially affects the information included in the original market announcement and, in the case of estimates of Mineral
Resources, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially
changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
Refer to Appendix 1 for glossary of defined terms.
3
Rare Earth Overview 4
Hastings projects 5
Yangibana Joint Venture Project 6
Thailand Hydromet Processing Plant 9
Timeline 17
Appendix 19
CONTENTS
4
Pm Sm Eu Gd Tb
Sc Y La Ce Pr Nd Er Tm Lu
Yb
Dy Ho
NdPr is the critical input for the world’s strongest permanent magnets
RARE EARTHS: THE METALS BEHIND THE ENERGY TRANSITION
What are rare earths?
A group of 17 elements. They are not actually rare, but economic deposits are
uncommon and the elements are very difficult to separate from each other.
Supply, Refining and Magnet production are largely concentrated in China.
Light rare earths Heavy rare earths
NdPr: the key to permanent magnets.
CAGR growth - estimated at ~9% over the next 10 years (AdamasIntelligence)
Neodymium (Nd) and Praseodymium (Pr) are the primary components in
the making of NdFeB magnets, which deliver smaller, lighter and energy-efficient
motors. Dysprosium and terbium are added for high-temperature performance
magnets.
EVs Wind turbines Robotics HVAC Electronics Defence
Export controls: China’s April 2025 licensing for 7 medium/heavy rare earths still applies; wider October 2025 controls are suspended until 10 Nov 2026.
Sources: IEA (April 2026); Shanghai Metals Market (30 Sep 2026); China Ministry of Commerce
Rare Earth Concentrate Mixed Rare Earth
Carbonate/Chloride
Rare Earth Oxides Metals and Alloys Permanent Magnets
Hydrometallurgy Oxides Separation Refining Manufacturing
Mining and
Beneficiation
Yangibana Rare Earths Project Hydrometallurgical Plant Oxide Separation Plant Rare Earth Metals Refinery Rare Earth Magnets
5
Yangibana JV Project2
› Ownership: Hastings 40%, Wyloo 60%
› Australia's highest-grade NdPr project:
37% avg NdPr:TREO (≥52%).
› 20.9Mt Ore Reserve, 19 years Life of
Mine.
› $649M NPV8, 34% IRR (pre-tax
ungeared).
› A$160M+ already spent on mine site
infrastructure. Completed construction
of accommodation village, water bores,
internal roads and airstrip.
› Fully permitted, shovel-ready.
› A$70m spent on plant and equipment
mostly from Tier 1 equipment suppliers
now in storage.
› Prospects of future supply of
concentrate to Thailand Hydromet Plant
Diversified rare earths company, with near-term revenue and profits
HASTINGS SNAPSHOT
Thailand Hydromet Plant1
› Interim holding of 49% in Thai MREC plant,
and application to Thai authorities for up
to 100% foreign ownership.
› First MREC targeted Q2 2027, for maiden
cash flow.
› 10,000tpa of feed / approx. 12,000tpa
MREC output.
› HAS share of pre-tax profit: US$15.5M in
Year 1 (indicative).
› Accepts qualifying monazite concentrate,
providing flexibility across ore
sources as future capacity scales.
Growth & Upside
› Staged ramp: 12,000 tpa capacity initially,
expanding to 36,000 tpa in future
(aspirational target Q4 CY2029)1.
Refer Appendix for Ore Reserves and Mineral Resources
1. Refer ASX Announcement “Planned increase of Thailand MREC Plant Output Capacity to 12,000 tpa” dated 15 July 2026
2. Refer ASX Announcement “Updated DFS Confirms De-Risked Pathway to Yangibana Stage 1 Production” dated 13 July 2026
6
PRE-TAX NPV8
$649M
34% IRR (pre-tax, ungeared)
STAGE 1 CAPITAL COST
$333.4M
NPV8 / capex ratio of 1.94
MINE LIFE
19 years
fully underpinned by Ore
Reserves
LIFE OF MINE EBITDA
$2,037M
$108M average per annum
RARE EARTH CONCENTRATE
37,000tpa
peak output at 27% TREO
NdPr CONTENT
37% of TREO
>90% of forecast revenue
YANGIBANA JOINT VENTURE PROJECT WITH
Refer ASX Announcement “Updated DFS Confirms De-Risked Pathway to Yangibana Stage 1 Production” dated 13 July 2026
Updated DFS
Resource & Reserve
Category Tonnes TREO % NdPr:TREO
JORC Mineral Resource 29.9 Mt 0.93% 32%
Updated MRE (Feb 2024) 21.0 Mt 1.12% up to 52%
JORC Ore Reserve 20.9 Mt 0.90% 37% avg LOM
20%
26%
22%
37%
52%
Industry
Average
Mount
Weld
Arafura
Nolan
Yangibana
(avg)
Yangibana
(peak)
NdPr:TREO Grade Comparison
Around 2x the industry average: more magnet-critical material in the TREO
7
INFRASTRUCTURE BUILT AND FULLY PERMITTED
Kurrbili Village - 294 rooms fully commissioned with
medical centre, sports court, shop, dry and wet mess.
Yangibana Airstrip - 2km in length, suitable for planes up
to 70 seat capacity and with airport buildings are in place
ensuring fast changeovers for employees.
Site Access Roads - 20km site access road to connect the
Yangibana Project’s mine site with the shire road network to
the beneficiation plant, village, mine and construction work.
A$160M spent on mine infrastructure & long-lead equipment1
1 ReferASXAnnouncement“HastingsandWylootoFormJointVentureontheY
angibanaRareEarths&NiobiumProject”dated20February2025.
WITH
Rotary Kiln – Perth, Western Australia. Equipment – Plant and equipment in storage in WA ready for
installation.
Floatation Cells & Structural Steel ready for installation.
8
Significant long lead-time items ready for deployment
LONG LEAD TIME EQUIPMENT PROCURED AND STORED IN WA
8
Re-Grind Mill Pumps and Equipment Load Bin, Off-gas Scrubber and Uranium Removal Circuit
9
A CAPITAL-EFFICIENT, NEAR-
TERM REVENUE PATHWAY
Thailand
Hydromet
Processing
Plant
ReferASXAnnouncement“HastingsAcquiresHydrometPlant”dated31March2026
Corporate Presentation
November 2026
10
Strategically located MREC processing facility
THAILAND HYDROMET PLANT
Location
Kabin Buri, Thailand - 175km from Laem Chabang deep-water port.
Facility
Purpose-built Modular hydrometallurgical facility on site area of
~103,000sqm and 2 Factory buildings of ~4,000 sqm each with ample
space for capacity expansion.
Planned Output
10,000tpa of feed / approx. 12,000tpa MREC output, a doubling of planned
output from the original 6,000tpa.
Permitting
Revised contracting arrangements and license amendments required to
accommodate the expanded capacity underway.
Product
Mixed Rare Earth Chloride (MREC) — preferred feed for REO separation.
Feed
Designed for monazite-bearing concentrates, providing flexibility across
multiple ore sources including third-party feedstock.
1. Refer ASX Announcement “Hastings Acquires Hydromet Plant” dated 31 March 2026
2. Refer ASX Announcement “Planned increase of Thailand MREC Plant Output to 12,000 tpa” dated 14 July 2026
Plant equipment
Approx 85% of equipment procured with all major equipment on site or
arriving on site before end Oct.
11
Fiscal & Geopolitical Support
THAILAND ADVANTAGE
Tier-1 Infrastructure
Kabin Buri industrial area provides access to
energy grid, skilled industrial workforce,
established regional chemical supply chains
within the Eastern Economic Corridor (EEC).
Excellent Logistics
On major Asian shipping routes, with Laem
Chabang, Thailand’s largest deep-water
port, 175 km by road.
Low OPEX
Competitive energy prices; ample supply of
reagents locally and SE Asian sources;
competitive labour costs
BOI Fiscal Support
8-13 year corporate income tax exemption,
import duty exemptions on equipment and
feedstock, full foreign ownership rights.
Access to Local Talent
Availability of skilled labour from Thailand's
well established automotive and chemical
sectors in the EEC.
Near-Term Cash Flow
Secured monazite feedstock for
commissioning in Q1 CY27. Hastings able to
generate MREC revenue independent of
Yangibana.
~4x
Lower indicative OPEX
vs remote WA
13yr
BOI Corp Tax
exemption target
175km
From Laem Chabang
deep-water port
2025
US-Thailand Critical
Minerals MOU
Refer ASX Announcement “Hastings Acquires Hydromet Plant” dated 31 March 2026]
12
Operating experience, feedstock and financial commitment behind the Thailand plant
ENUO: OUR PARTNER
About Enuo2
Singapore-based critical minerals group
• 9% Shareholder of HAS
• Experience in operating
beneficiation and hydromet
plants in Africa and Asia
• Smelting, separation and
recycling plants in China and
Japan
• Products include MREC, NdPr
oxide, and Dy and Tb oxides
• Supplying monazite concentrate
feedstock from Africa to Thailand
plant
Plant operator
Hastings will be the manager
with operational support from
Enuo.
Plant in place
Buildings structurally complete
and permitted, with ~80% of
plant equipment having arrived
on site.
Secured feedstock
Framework agreement for
African monazite concentrate,
doubled to 10,000 tpa for the
expanded plant.3,4
Commissioning
Enuo to be responsible for
testing and commissioning of
the Thailand plant.
Deferred Payment
US$5.5M deferred payments
due only after ≥70% nameplate
for 30 days, on-spec MREC and
paid deliveries.2
Technical services
Metallurgical test work on
Yangibana ore at Enuo’s
facilities in Africa, China and
Japan.1
Sources: ASXannouncements—¹27Jan2026“TechnicalServicesandResearchAgreement…”; ² 31Mar2026“HastingsAcquiresHydrometPlantinThailand”; ³ 22Apr2026“HastingsRevealsThaiHydrometPlantFlowsheet”; ⁴ 14Jul2026“HastingsPlans
toIncreaseThailandMREC Productionto12,000tpa”.
13
Mixed Rare Earth Chloride Production
THE HYDROMET PROCESS
Feedstock Optionality
Stage 1: African sourced monazite concentrates
Stage 2: Yangibana and third-party
7-Step Hydromet Process
1. Grinding
2. Caustic Cracking
3. Leaching & Filtration
4. Acid Dissolution
5. Purification
6. Concentration & Crystallization
7. Phosphate Crystallization (TSP byproduct)
Output
High-purity MREC in chloride form – preferred feed
for Western separators due to lower cost structure.
Chloride Price
MREC chloride flake commands ~20% premium vs
carbonate equivalents (SMM/Benchmark 2026)
Refer ASX Announcement “Hastings Acquires Hydromet Plant” dated 31 March 2026
Refer ASX Announcement “Hastings Reveals Thai Hydromet Plant Flowsheet” dated 22 April 2026
Thailand Plant Flowsheet
14
Estimated Capex US$12M
THAI PLANT ECONOMICS AND DEAL STRUCTURE
YEAR 1 YEAR 2 YEAR 3
Total MREC Produced 10,700tpa 12,000tpa 12,000tpa
Gross Revenue US$98.4M US$110.4M US$110.4M
Feedstock, Processing and Operating Costs (US$66.8M) (US$74.7M) (US$74.7M)
Profit Before Tax (100%) US$31.6M US$35.7M US$35.7M
Profit Before Tax (HAS 49%) USD US$15.5M US$17.5M US$17.5M
Profit Before Tax (HAS 49%) AUD AU$22.1M AU$25.0M AU$25.0M
Forward-LookingFinancialInformation:ThefinancialprojectionssetoutbelowareunauditedinternalmanagementestimatespreparedbytheCompany.Theyarebasedonanumberofassumptionswhichare
subject to uncertainty, andwhichmaynot eventuate. Actual production volumes, revenues, costs, and cashflowsmaydiffer materiallyfromthose projected. These projections have not been reviewed or
audited byanindependentthird party. Theyare provided bymanagement for indicativepurposes onlyand do not constitutea profit forecast or financial product advice. Investorsshould not placeundue
relianceontheseprojections.Note: Inputcapacityupgradeassumescapital costof US$3Mincurredtodesign, installandcommissionadditionalprocessingcapacity. Installationandcommissioningactivities
occurpriortoYear1offullproduction.HASportionrepresents49%ofProfitsbeforeTax.
ReferASXAnnouncement“HastingsSecuresMonaziteFeedstockforThaiHydrometPlant”dated14April2026
ReferASXAnnouncement“HastingsRevealsThaiHydrometPlantFlowsheet”dated22April2026
Ownership %:
Interim holding of 49%
Submitting an application to Board of
Investment (BOI), Thailand for up to
100% foreign ownership (Thai law
prohibits majority ownership of certain
businesses).
Deposit: US$500K upfront deposit (paid).
Equity:
US$8.0M = 23m new Hastings shares
@ A$0.50 per share (issued).
Cash US$1.0M towards commissioning costs
Deferred
Payments:
US$5.5M cash; production-contingent.
No deferred cash payments due unless
commercial production achieved.
Downside
Protection:
Downside protection on deferred
payments.
BOI Benefits
8 - 13 yrs corporate income tax relief;
import duty exemptions and up to
100% foreign ownership rights.
Indicative 3-Year Projections
(unaudited management estimates from first year of full production)
Acquisition Cost - US$15M
US$98.4M
Year 1 Gross Revenue
(100%)
US$15.5M
Year 1 HAS 49% Pre-Tax
Profit
US$17.5M
Year 2 HAS 49% Pre-Tax
Profit
15
Hydromet Plant Construction & Delivery of equipment (as at late September)
THAILAND HYDROMET PLANT
16
Low-cost processing buffers price risk, avoids mine-scale capex and keeps Yangibana mine development optional
THAILAND - EXECUTION STRATEGY
Third-party feedstock
10,000 tpa monazite input
Kabin Buri processing plant
12,000 tpa MREC production output
MREC product
Production in Q2 2027
A capital-light route to
production
~US$12M
Management estimates for capex
1H CY27
First MREC production targeted³
01
MITIGATED COMMODITY
PRICE RISKS
• Monazite feedstock and
MREC are both priced
off the market
• Input costs and output
revenue move in
tandem with RE oxide
prices.
02
CAPEX LIGHT
• Low capex does not
burden Balance Sheet.
• Capital channeled to
Thai Plant to generate
cash flow
• No mine-scale project
debt to service while the
plant ramps up.
03
SPEED TO CASH FLOW
• Anticipating Q2 2027 for
cash flow.
• Lower cost production
in Thailand supports
strategy of maximizing
long term returns to
shareholders.
THE INVESTMENT THESIS
• Build hydromet plant in Thailand now for early cash flow whilst awaiting a conclusion of Wyloo’s execution plan for Yangibana.
• Proposal in place to acquire balance of 51% equity upon approval by BOI next year.
¹Estimatedcapex,excludingacquisitionconsideration(cappedatUS$15M,mainlysharesandproduction-contingentpayments). ²ASX22Apr2026“HastingsRevealsThaiHydrometPlantFlowsheet”.³ASX14Jul2026“Hastings
PlanstoIncreaseThailandMREC Productionto12,000tpa”;Y
ear1profitisanunauditedmanagementestimate(Hastings49% interest) andshouldbereadwiththeforward-lookingstatementsinthatannouncement.
04
OPTIONALITY
• Yangibana is a potential
source for future
concentrate supply.
• Multiple sources for RE
concentrate globally
allows for competitive
sourcing.
17
The Road to Revenue: Key Milestones 2026-2027
INDICATIVE TIMELINE & VALUE CATALYSTS
Q1 CY26
Acquisition of 49%
Interest in Thai
MREC Hydromet
Plant.
Commenced
capital and
operating cost
review.
Q2 CY26
Signed Framework
Offtake Agreement
for feedstock with
Enuo
Release of
information on
Process Flow Sheet
1H CY27
12,000tpa MREC
output capacity
testing and
commissioning .
Target first MREC
production and
cash flow.
BOI Approval
(expected)
2H CY26
Commence site
preparation work
Mobilisation prior
to commencement
of construction.
Delivery of
equipment to site.
Submission of BOI
application
Q4 CY27
Commence plant
design for 36,000
tpa MREC output
Production at
expanded capacity
targeted for Q4
CY29.
ReferASXAnnouncement“HastingsRevealsThaiHydrometPlantFlowsheet”dated22April2026
18
Hastings Technology Metals Limited
ABN 43 122 911 399
Level 6, 197 St Georges Terrace
Perth Western Australia 6000
T: +61 8 6117 6118
E: info@hastingstechmetals.com
hastingstechmetals.com
Follow us on
Level 3, 5 Mill St
Perth Western Australia 6000
19
APPENDIX
20
YANGIBANA JV PROJECT RESOURCES AND RESERVES
MINERAL RESOURCES AND ORE RESERVES1
Category mt %TREO %NdPr TREO tonnes
Measured 4.97 0.96 0.37 47,721
Indicated 19.51 0.88 0.32 171,936
Sub-total 24.49 0.90 0.33 219,657
Inferred 5.45 1.05 0.31 57,298
TOTAL 29.93 0.93 0.32 276,955
Deposit mt %TREO %NdPr NdPr: TREO
Bald Hill 8.12 0.79 0.32 41
Fraser’s 1.77 1.01 0.43 43
Simon’s Find 2.69 0.53 0.28 53
Auer 2.83 0.96 0.34 35
Yangibana 1.31 0.79 0.37 47
Yangibana North 4.21 1.29 0.34 26
TOTAL 20.93 0.90 0.33 37
1 ReferASXAnnouncement6February2023“YangibanaOreReservesIncreaseby25%”; numbersmaynotaddduetorounding; forreferencethattheOreReservesstatedisincludedaspartoftheMineralResources. Otherprospectsof1.82Mtnotincludedintheindividualprospectssection.
2 ReferASXAnnouncement4September2024“MaidenNiobiumMeasuredandIndicatedMineralResourceattheYangibanaRareEarthandNiobiumProject”
Disclaimer: ThereisnocertaintythatfurtherexplorationworkwillresultinthedeterminationofMineralResources(orOreReserves).
Category mt %TREO %NdPr NdPr: TREO
Proved 4.89 0.95 0.37 39
Probable 16.03 0.88 0.32 36
TOTAL 20.93 0.90 0.33 37
INDIVIDUAL DEPOSITS (at Yangibana)
NIOBIUM RESOURCES (at Yangibana)
Simon’s Find
Category mt %TREO %NdPr TREO tonnes
Measured - - - -
Indicated 3.14 0.52 0.27 16,206
Sub-total 3.14 0.52 0.27 16,206
Inferred 0.05 0.06 0.31 295
TOTAL 3.19 0.52 0.27 16,501
Bald Hill
Category mt %TREO %NdPr TREO tonnes
Measured 3.55 0.82 0.34 29,136
Indicated 5.23 0.75 0.30 39,290
Sub-total 8.79 0.78 0.31 68,425
Inferred 1.17 0.67 0.27 7,787
TOTAL 9.96 0.77 0.31 76,212
Fraser’s
Category mt %TREO %NdPr TREO tonnes
Measured 0.75 1.25 0.53 9,407
Indicated 1.47 0.75 0.32 11,001
Sub-total 2.23 0.92 0.39 20,408
Inferred 0.01 0.60 0.25 44
TOTAL 2.24 0.91 0.39 20,452
Auer
Category mt %TREO %NdPr TREO tonnes
Measured - - - -
Indicated 3.54 0.93 0.32 32,796
Sub-total 3.54 0.93 0.32 32,796
Inferred 1.10 0.76 0.24 8,297
TOTAL 4.64 0.89 0.30 41,093
TOTAL JORC (2012) ORE RESERVES BY CATERGORY AND DEPOSIT (6 FEBRUARY 2023)
Yangibana
Category mt %TREO %NdPr TREO tonnes
Measured - - - -
Indicated 1.98 0.71 0.34 14,034
Sub-total 1.98 0.71 0.34 14,034
Inferred 0.33 0.64 0.31 2,146
TOTAL 2.31 0.70 0.33 16,180
Yangibana North
Category mt %TREO %NdPr TREO tonnes
Measured 0.66 1.39 0.36 9,179
Indicated 4.15 1.41 0.36 58,609
Sub-total 4.81 1.41 0.36 67,788
Inferred 0.97 1.43 0.37 13,914
TOTAL 5.78 1.41 0.36 81,702
Category mt Nb2O5 ppm Nb2O5 tonnes
Measured 2.37 1,035 2,251
Indicated 4.36 2,995 13,050
Sub-total 6.73 2,305 15,501
Inferred 0.01 1,435 20
TOTAL 6.74 2,305 15,521
TOTAL JORC (2012) MINERAL RESOURCES (30 OCTOBER 2022)
21
PEER COMPARISON – NDPR:TREO RATIO
Mine
Majority / Full
Ownership
Ticker
Stage of
Development
Capex (A$m)
Ore Reserves
(Proved)
Mt
Ore Reserves
(Proved)
Grade –
NdPr / TREO
Ore Reserves
(Probable)
Mt
Ore Reserves
(Probable)
Grade
NdPr/TREO
Ore Reserves
(Total)
Mt
Ore Reserves
(Total)
Grade
NdPr/TREO
NdPr:TREO
ratio1
(Total Ore
Reserves)
Source
Yangibana
Hastings Technology
Metals Ltd
HAS:ASX
Pre-
production
474 4.89 0.37 / 0.95% 16.03 0.32 / 0.88% 20.93 0.33 / 0.90% 37%
6 February 2023: ASX Announcement: “Yangibana Ore
Reserves Increase by 25%”
Nolans
Arafura Rare Earths
Ltd
ARU:ASX
Pre-
production
1,886
(US$1,226m)
5 0.791 / 3.00% 24.6
0.741 /
2.80%
29.50 0.771
/ 2.90% 26%
11 November 2022: ASX Announcement: "Nolans
Project Update"
23 July 2024: ASX Announcement: "Arafura achieves
major debt funding milestone"
Mt Weld
Lynas Rare Earths
Ltd
LYC:ASX Production N/A 21.2 1.72 / 7.40% 10.8 1.06 / 4.50% 32.0 1.50 / 6.42% 23%
5 August 2024: ASX Announcement: “Mineral
Resources and Ore Reserve Update”
Bayan Obo2
China Northern
Rare Earth Group
High-Tech Co Ltd
600111:C
H
Production N/A - - - - 48 1.261
/ 6% 21%
September 2021: Dating of monazite-apatite-allanite-
epidote corona from the Bayan Obo Group in the
northern margin of the North China
4-7 September 2014: 1st
European Rare Earth
Conference, “China’s Rare Earth Ore Deposits and
Beneficiation Techniques” refer table 2
Ngualla
Peak Rare Earths
Limited
PEK:ASX
FEED
Completed
441 17.0 1.021
/ 4.78% 1.5 1.081
/ 5.10% 18.5 1.07 / 4.80% 21%
24 October 2022: ASX Announcement: “Ngualla Rare
Earths Project Completion of Bankable Feasibility Study
Update”
30 November 2023: ASX Announcement: “Completion
of FEED Study”
Songwe Hill
Mkango Resources
Ltd
MKA:TSXV Feasibility
479
(US$311m)
8.16 0.26 / 1.28% 9.99 0.21 / 1.07% 18.15 0.24 / 1.16% 20%
19 August 2022: SEDAR Announcement: “Technical
report (NI-43-101) Mkango”
Kangankunde
Lindian Resources
Limited
LIN:ASX Feasibility
A$60m
(US$40m)
- - 23.7 0.571/ 2.9% 23.7 0.571/ 2.9% 20%
1 July 2024: ASX Announcement: “Kangankunde
Project Stage 1 Outstanding Feasibility Study Results”
Mountain Pass MP Materials Corp MP:NYSE Production N/A 0.583
0.671
/ 4.28% 25.233
0.981
/ 6.25% 25.813
0.971
/ 6.20% 16%
28 February 2024: SEC Filing: Form 10-K – Annual
Report
YANGIBANA PROJECT PEER COMPARISON
Notes:
1Calculated from available information i.e. NdPR/TREO ratio when provided converted to NdPr % (grade)
2 Bayan Obo is a Chinese Ore Reserve estimate and doesn’t have Proved and Probable estimates. The Ore Reserve estimate (Total) was obtained from a geological research paper
3 Mountain Pass has been converted from US short-tons to metric tonnes
Capital Costs in US Dollars converted at 0.65 AUD/USD exchange rate.
22
AUSTRALIA’S HIGHEST-GRADE
NdPr RARE EARTHS PROJECT –
FULLY PERMITTED, SHOVEL-
READY
Yangibana REE
& Nb Project
20.9Mt
JORC Ore Reserve
37%
Avg NdPr:TREO
A$160M+
Capital Spent To Date
19 yr
Mine Life
ReferAppendixforOreReservesandMineralResources
1.ReferHastingsASXAnnouncement“ExecutionofBindingAgreementwithWyloo”dated16May2025
Active Work Program
Yangibana process flow review underway
targeting maximisation of full basket
value across NdPr, niobium and HREE
recovery pathways. Results will inform
construction parameters for an
incoming JV partner, with potential to
further improve overall project
economics.
Joint Venture (UJV)1
A JV with Wyloo holding 60%, and HAS
retaining a 40% interest of project
revenue and free cash flows. Wyloo
currently running a strategic process to
sell its 60% interest.
23
Enuo Framework Binding Offtake Agreement (FOA)
AFRICAN MONAZITE FEEDSTOCK
Estimated REE Composition
NdPr (Nd + Pr)
20.0% TREO
Primarymagnetelements| EV&windturbinemagnets
DyTb (Dy + Tb)
1.0 – 1.3% TREO
High-tempperformance| premiumpricing
Product
African Monazite Concentrate.
Minimum Grade
≥54% TREO on dry basis (excl thorium).
Annual Volume
Minimum 10,000 tpa feedstock input.
Delivery
CIF Laem Chabang Deep-Water Port, Thailand.
Term
2 years + 1 year renewal option.
Price
Indexed dynamically to Monazite concentrate
benchmarks (e.g. ~US$5,458 – $5,978/mt -
SMM, July 2026).
Key Elements Recovery Rates
NdPr
93% (95% from
monazite / 98%
from MREC)
Dy
91% (95% from
monazite / 96%
from MREC)
Tb
91% (95% from
monazite / 96%
from MREC)
ReferASXAnnouncement“HastingsSecuresMonaziteFeedstockforThaiHydrometPlant”dated14April2026
24
24
Thai Plant Processing Strategy vs. Traditional (Sulfuric Acid) Processing
THAILAND HYDROMET PLANT
~20% Price
Premium
MREC chloride flake
commands ~20% premium vs
carbonate equivalents
(SMM/Benchmark 2026).
Chloride is used by oxide
separators globally.
Significantly
Lower OPEX
Competitive Thai energy,
labour and reagent costs.
Labour, electricity and reagent
costs materially below
Western benchmarks.
ReferASXAnnouncement“HastingsAcquiresHydrometPlant”dated31March2026
ReferASXAnnouncement“HastingsRevealsThaiHydrometPlantFlowsheet”dated22April2026
PRIMARY
EQUIPMENT
Multiple Stirred Tank Reactors
(Parallel)
Single Large Rotary Kiln
FEEDSTOCK
FLEXIBILITY
High: Multiple parallel lines
accept simultaneous inputs
from different sources
Low: Optimised for a single,
consistent concentrate
REDUNDANCY
High: Individual reactors can
be serviced without total plant
shutdown
Low: Kiln failure or
maintenance stops the entire
front-end
CHEMICAL
OUTPUT
Rare Earth Chloride (High Purity)
Rare Earth Sulphate /
Carbonate
CAPITAL
INTENSITY
Low: Modular reactor design,
lower capital cost than kiln-
based equivalents
High: Single large rotar
Share your feedback