Niobium Maiden Mineral Resource
Released
Released
Announcement PDF
4 September 2024
Maiden Niobium Measured and Indicated Mineral Resource
at the Yangibana Rare Earth and Niobium Project
HIGHLIGHTS
Hastings Technology Metals Ltd (ASX: HAS) (Hastings or the Company), is pleased to announce a
Maiden Niobium Measured and Indicated Mineral Resource at the Yangibana project, located in Western
Australia’s Gascoyne region; herein referred to as the Yangibana Rare Earth and Niobium Project (the
“Yangibana Project”).
•
•
•
•
•
•
•
•
•
Maiden Niobium Measured and Indicated Mineral Resource estimated at the Yangibana Project
within Bald Hill and Simon’s Find deposits.
Niobium Pentoxide Measured and Indicated Mineral Resource now 6.7Mt at 2,305ppm for
15,501t Nb2O5.
Niobium present within the existing footprint of the Yangibana Project.
Niobium (Nb2O5) concentrations occur in the form of mineral ferro-columbite at the
Yangibana Project over a 4-kilometre strike at the existing Simon’s Find and Bald Hill deposits.
A Bald Hill sample generated from process development test work reported XRF assays 1.35% Zr and
0.08% Hf. Subsequent standardless semi-quantitative analysis reported that zircon in the sample
was the source of the reported zirconium and hafnium, contained at a ratio of 13 to 1 (49.0% / 3.8%).
The Hf-enriched zircons from Bald Hill thus contain 3.8 times the HfO2 content compared to
the benchmark of 50:1 1.
Studies underway to incorporate the ferro-columbite estimate value into an updated Ore Reserve.
Besides this reported maiden Niobium MRE, an updated Mineral Resource Estimate is
expected to be available by November 2024, including the potential of associated Critical Minerals
ZrO2 and HfO2 after conclusion of metallurgical testing of the recovery of zircon, (and associated
hafnium) in addition to TREO and ferrocolumbite 2.
The additional Critical Metals will provide a multi-commodity recovery process stream and byproduct credit income.
Niobium is a technology-Critical Metal with major uses in making steel lighter and stronger, hightech alloys and faster recharging of Li-ion batteries. Global production is centred on Brazil (about
90%, with new supply chains being sought).
Analysis of previous drilling at Bald Hill and Simon’s Find trend (Figures 1 and 2) and the completion of
additional Niobium assays has allowed for the completion of an initial Niobium Mineral Resource
estimate for these deposits (Table 1). Importantly, this area is near the planned process plant and vital
for the feed required upon project commissioning in Q4 2026.
1
ASX Announcement 26 August 2024 “High-grade Niobium, Rare earth and Hafnium-rich Zircon Rock Chip Results at Hastings
Yangibana Project”.
2
ASX Announcement 26 August 2024 “High-grade Niobium, Rare earth and Hafnium-rich Zircon Rock Chip Results at Hastings
Yangibana Project”.
Page 1 of 37
Hastings Chief Geologist, Dr Louis Schürmann, said: “The maiden Niobium Mineral Resource Estimate
is an important step towards providing a multi-commodity recovery process stream and by-product
credit income. The Yangibana Project hosts the Gifford Creek Carbonatite which is an important
depository’s of REE and Critical Metals, while the designed beneficiation plant will be capable of
producing ferrocolumbite, Hf-rich zircon and monazite concentrates. Yangibana’s multi-commodity
potential is being expanded through further exploration and ongoing metallurgical testing of hafniumenriched zircon.”
Table 1: Total JORC (2012) Niobium Mineral Resources September 2024.
Category
M Tonnes
Nb2O5 ppm
Nb2O5 t
Measured
2.37
1,035
2,451
Indicated
4.36
2,995
13,050
sub-total
6.73
2,305
15,501
Inferred
0.01
1,435
20
TOTAL
6.74
2,305
15,521
•
•
Numbers may not add up due to rounding. Includes JV tenement contributions.
Reporting of Mineral Resources for Bald Hill and Simon’s Find is at a cut-off grade of 0.24% total rare earth oxides (TREO)
within the existing pit design.
Summary
The initial Niobium Mineral Resource Estimate has been applied to defined at Bald Hill and Simon’s Find.
Total Niobium Mineral Resources at the Yangibana project now stand at 6.74Mt @ 2,305ppm Nb2O5.
The most recent drilling program conducted from November 2021 to February 2022 was targeting
remaining areas of Inferred Mineral Resource category material along the 8km long Bald Hill, Simon’s
Find, Fraser’s trend. Holes were also drilled to extend mineralised trends outside of the current Mineral
Resource down dip.
All Yangibana project deposits start from surface and contain large coherent domains comprising mostly
high-value rare earths dominated mineral assemblage. Hastings is planning additional drilling programs
across all Yangibana deposits. The work undertaken to estimate the Niobium Mineral Resource was
completed by David Princep of Gill Lane Consulting and incorporates all the information and data that
was used in the previous Mineral Resource estimates plus the 2021-2022 drill program data which was
released to the ASX on the following dates: 9 June 2022 and 25 July 2022 with the previous REE estimates
being released to the ASX on 11 October 2022.
Hastings is focussed on progressing further metallurgical testing of Niobium bearing mineralisation to
ensure that the maximum value is returned from the deposits. Additional mine planning studies will be
undertaken based on this initial Niobium Mineral Resource to maximise the extraction of material from
the Bald Hill and Simon’s Find pits.
Page 2 of 37
Impact on Yangibana Project
Recent geological, mineralogical, and metallurgical studies have revealed a promising pathway for
extracting high-grade Niobium concentrate from the Bald Hill and Simons Find deposits.
Key findings include:
•
High-Grade Niobium Occurrence: The majority of Niobium in the ore is present in ferrocolumbite,
a mineral with a high Niobium content.
•
Liberation Potential: A substantial portion of Niobium is liberated at a particle size of 90µm,
indicating excellent potential for concentration.
•
Tailings Recovery: Opportunities identified to recover Niobium from the tailings stream of the
existing rare earth flotation process by implementing specific chemical conditions and additional
processing steps.
These findings have identified the unit processes that would enable the niobium to be recovered
from the existing beneficiation flowsheet with modifications that incorporate:
•
•
•
Ore Dressing: A preliminary stage to separate high-density minerals, including Niobium-bearing
minerals, from the ore.
Magnetic Separation: The use of high-intensity magnetic separators to further concentrate
Niobium-rich materials.
Flotation Optimisation: Tailored flotation conditions to selectively recover Niobium from the
concentrate.
Hastings is confident that these additional unit processes will enable Yangibana to produce a high-quality
Niobium concentrate, significantly enhancing the value of the Bald Hill and Simons Find deposits.
Hastings Chief Operating Officer, Tim Gilbert, said:
“Hastings have been working closely with its partners to optimise the Yangibana process plant for rare
earth recovery. Hastings see another opportunity at Yangibana to include an additional Niobium
recovery circuit. Initial test work indicates a relatively simple circuit comprising magnetic separation
and float circuit, positioned after and in series with the rare earths circuit, to recover Niobium and
Zircon/hafnium concentrates in two streams. Additional test work is required to confirm the final
circuit, with process design, detailed engineering and capital cost estimation to follow. Hastings is
confident that the additional magnetic separation and flotation circuit can be effectively and quickly
designed and implemented at Yangibana.”
GR Engineering Services Manager – Projects, Antonio Cinanni, said:
“GRES has been working with Hastings on the Yangibana Rare Earths beneficiation plant for over 12
months. During the time, GRES have undertaken detailed process engineering and design of the
benefaction plant. With the presence of niobium in the existing permitted Yangibana ore bodies,
Hastings has initiated discussions with GRES to modify the current process plant to also include the
recovery of niobium. Hasting's intention is to work with GRES to complete test work and implement the
Niobium recovery circuit.”
Page 3 of 37
Figure 1: Yangibana Conceptual Critical Mineral Flowsheet – additional unit processes required
boxed with black dashed line.
Hastings continues to progress work on the fully permitted project at Yangibana. Yangibana has a 17year mine life and will create significant employment via construction and operations jobs in the
Gascoyne region as well as making a strong economic contribution at each of Commonwealth, State and
local levels (including Native Title royalties).
The ability to recover niobium within the current mine life, coupled with the project cost reductions
announced in June 2024 3, with the current ongoing exploration and updated Mineral Resource estimates
(this announcement), has the potential for life of mine and product extensions.
Substantial progress at Yangibana has been made with early infrastructure (accommodation village,
airstrip, access roads etc) having been completed, an EPC contract with GR Engineering Services for
Beneficiation Plant construction in place, and long lead equipment having been secured and ready for
deployment. Timing remains on track for first production in 2026, subject to FID / Project Funding.
Page 4 of 37
3
ASX Announcement 13 June 2024 “Yangibana Rare Earths Project Cost Reduction”.
Figure 2: Current designed beneficiation plant for the Yangibana Project.
Figure 3: Planned timeline for the Yangibana Project from Q1 20230 to Q4 2026 (reference to ASX Announcement 31
May 2023 “Yangibana Project Update – Staged development strategy to reduce project delivery risk and enable
further pathway to cash flow”).
Page 5 of 37
Figure 4: Map showing location of Yangibana deposits and planned site infrastructure.
Page 6 of 37
Figure 5: Oblique Bald Hill to Simon’s Find Long Section (looking east) showing Resource Classifications originally from
the 2022 TREO block model which underpins the MRE outlined in this announcement (Red = Measured Resource; Blue
= Indicated Resource; Green = Inferred Resource).
Page 7 of 37
Geology
The near surface mineralisation throughout the Yangibana Project is hosted by iron oxides and
hydroxides termed ironstone, being the alteration products of the primary hosts ferro-carbonatite and
phoscorite intrusive veins. The main rare earths-bearing mineral is monazite which has locally
undergone alteration at shallow depths (to 25m depth) to its hydrous equivalent rhabdophane and to
rare earths-bearing aluminium-phosphates such as florencite.
The deposits occur as narrow but strike extensive veins that have a range of dips from almost horizontal
(10-20o) to sub-vertical. Average true thickness varies from 2.2m to 3.5m throughout the Yangibana
deposits although locally true thicknesses in excess of 20m occur.
Drilling
Hastings completed an extensive drill program between November 2021 and February 2022 comprising
170 holes for 13,334m of reverse circulation (RC) drilling. The results from the program successfully
extended known mineralisation down dip within the mineralised Bald Hill – Simon’s Find – Fraser’s trend
as well as infilling near-surface portions which previously had insufficient drilling and were subsequently
classified as Inferred Mineral Resources (>50m by 50m drill spacing). This drilling also improved the
distribution of Niobium assays throughout the Bald Hill and Simon’s Find deposits.
Drillholes were a mix of vertical and inclined (between 50-70 degrees) to optimise the mineralised zone
intersection angle as close to true thickness as possible. Internal downhole surveys were carried out at
30m intervals downhole by the drilling contractors using a Reflex electronic multi-shot survey tool.
Collar surveys were carried out and collected by Survey Group using DGPS utilising a locally established
control point. Accuracies of the drillhole collar locations collected by Survey Group is better than 0.1m.
Downhole density data was collected on a large suite of holes utilising a Geovista FDSB-4620 downhole
density tool on a continuous basis giving 1cm data resolution.
RC holes were drilled using a nominal 5¼ inch diameter face-sampling bit. Samples were collected
through a built-in cyclone with a triple-tier riffle-splitting system providing a large sample of
approximately 25kg and a sub-sample of 2-4kg from each metre drilled, of which selected samples were
sent for analysis, from each metre drilled. Field duplicates, blanks and Reference Standards were
inserted at a rate of approximately 1 in 20.
Sampling
Samples were routinely sent to Intertek Genalysis in Perth for analysis using techniques considered
appropriate for the style of mineralisation. Samples were analysed for the range of rare earths, rare
metals (Nb, Ta, Zr, Hf), thorium and a range of common rock-forming elements (Al, Ca, Fe, Mg, Mn, P, S,
Si, Sr).
Page 8 of 37
Once assay data were returned, the elemental values were converted to oxides using standard factors.
Quality Control
In total, the quality control regime executed has provided reasonable support for the accuracy and
precision of the assay results underpinning the Mineral Resource estimate. The vast majority of results
for standards remain within the normal control limits of 2 standard deviations.
Bulk densities were completed previously by either the Company or at independent laboratories on core
from each of the main deposits. Samples from each of the oxidised, partially oxidised, and fresh
mineralisation zones were tested with results feeding into the Mineral Resource estimations based on
weathering surfaces as defined by the Company.
During the 2020 and the more recent 2021-2022 drilling program 191 drill holes were downhole logged
using a gamma – gamma density probe in order to provide additional bulk density values. The
geophysically derived density values were compared to existing and new physically measured density
values as well as to known geology (quartz veining in particular) and was found to be a reliable indication
of in-situ bulk density. A review of the total bulk density dataset showed variations in density in line with
the type of mineralisation that was encountered in the diamond drilling. The incorporation of a
significant amount of downhole density data into the Mineral Resource estimate dataset has allowed for
the derivation of density factors with respect to vertical depth for both mineralised and non-mineralised
intervals. These have been used in the updated Mineral Resource estimate.
Interpretation of Geology
The mineralisation at Bald Hill and Simon’s Find comprises a series of narrow, high grade TREO zones,
associated with fenitised hanging and footwall country rock with strike extents up to several kilometres.
Individual mineralised zones are 1 to 15m wide and extend down dip for at least 125m with dips varying
from sub-horizontal to sub-vertical.
Confidence in the geological interpretation is good. The interpretation is based on drilling that ranges
from a 25 m by 25 m spacing to 50 m by 50 m spacing. The interpretation also incorporates data gathered
from surface mapping of exposures. The mapping has assisted in understanding the controls on
mineralisation to improve the confidence in the geological interpretation. All available data from drilling
and mapping is used in the geological interpretation. An iterative process has been adopted with respect
to the geological interpretation to ensure that it reflects the current understanding of the geology and
controls on mineralisation.
Each of the two deposits was assessed for grade and geological continuity and the mineralised
wireframes were defined around a nominal 250ppm Niobium (Nb) value.
The drilling data was limited to selected assay intervals with several sections of the drilling unsampled
in areas where no mineralisation was believed to exist. In some areas these wireframes were reasonably
coincident with the previously estimated TREO wireframes however the correlations between the two
Page 9 of 37
were not universal with areas where the Nb wireframe were partially or wholly outside of the TREO
wireframe. It is expected that, with additional metallurgical test work, these areas may be able to be
included within the Niobium mineral resource estimate and therefore constitute a potential upside to
the two deposits. Within the Mineral Resource estimate data set the unsampled zones within the drilling
were replaced with zero values. In a limited number of instances, for geological consistency, the
mineralised envelopes were carried through areas within drill holes that had not been sampled. In these
cases, the minimum thickness of intercept was assumed to be 2m and, in common with the rest of the
drilling, these intervals were assumed to be at zero grade.
Figure 6: Bald Hill section, TREO wireframe in blue, Nb wireframe in red.
Figure 7: Simon’s Find section, TREO wireframe in blue, Nb wireframe in red.
Cut-Off Grades
Wireframing of the two deposits was conducted using a Nb cut-off grade to improve the geological and
grade consistency of the modelled wireframes. In this instance a Nb grade of approximately 250ppm
was chosen for the wireframing value as this was considered to represent the transition between
consistently mineralised and unmineralized material. In cases where a lower grade was adjacent to
significantly higher grades, the lower grade interval was incorporated into the wireframe as these were
constructed around the final 1m composites rather than the original selective sampling.
This process created a level of conservatism whereby lower grades of Nb were incorporated into the
wireframe. Additional conservatism was added by only allowing the wireframes to be extrapolated down
dip below the last drill hole, using the geological convention of 50% of the local drill hole spacing.
Page 10 of 37
Following mine planning studies a reporting cut-off grade of 0.24% TREO has been defined. This value
was initially based on a net smelter return (NSR) calculation using all the component elements making
up the TREO value, with additional work allowing this to be simplified to a singular TREO value. The cutoff grade is based on Hastings’ view on the individual prices for the various rare earth elements,
individual processing recoveries and overall processing costs. As the recovery of Niobium is currently
expected to be as a direct byproduct value the TREO cut-off grade has been retained for the reporting
of Nb mineral resource grades. The Nb mineralisation has also been limited to the existing Ore Reserve
pit designs to reflect its byproduct status. It should be noted that Nb mineralisation is present outside
of the TREO wireframes which has the potential to add additional value to the project should additional
metallurgical testing and process costing prove successful.
Sample Data
The population distributions for Nb for Bald Hill and Simon’s Find show significant differences with the
Bald Hill mineralisation being generally lower in tenor and biased very much towards the lower grades.
In contrast Simon’s Find mineralisation is significantly higher in grade with a much more pronounced
high-grade tail. The mineralisation is also more consistent, potentially because of revised sampling
protocols, providing for more infill assays.
Figure 8: Distribution of Nb grades for the Bald Hill deposit.
Page 11 of 37
Figure 9: Distribution of Nb grades for Simon’s Find deposit.
The coordinated dataset was intersected with the mineralisation wireframes with the resulting domain
allocated data being used for the estimation. To limit the impact of extreme grades a top cut of
15,000ppm was applied. This resulted in a reduction in the mean value from 1,627 to 1,506ppm with 77
out of a total of 7,026 samples being cut; more importantly the coefficient of variation for the dataset
was reduced from 2.23 down to 1.75 making the dataset more appropriate for an ordinary kriged (OK)
estimate.
Table 2: Statistics for both un-cut and cut datasets.
Un-cut Nb
Cut Nb
Minimum
0
0
Maximum
82,229
15,000
Mean
1,627
1,506
Median
487
487
Standard Deviation
3,624
2,643
Coefficient of Variation
2.227
1.754
Samples
5,823
5,823
Comparison with Previous Mineral Resource Estimate
The mineral resource estimate outlined in this announcement represents an initial mineral resource for
both deposits and therefore no comparison to any previous estimate is presented.
Page 12 of 37
Block Modelling Parameters – Bald Hill and Simon’s Find Mineral Resources only
Due to the complexity and generally narrow nature of the mineralisation the Mineral Resource estimates
were undertaken on ‘flattened’ block models following the allocation of block proportions from the
updated mineralisation wireframes. This flattening process allowed for the use of Ordinary Kriging
estimation techniques. One metre down hole compositing based on the assay data and wireframes was
used to regularise the assayed intervals. Summary statistics for each deposit were used to identify the
presence of outliers.
For each deposit, variograms of Nb were defined and used in the mineral resource estimate. In all
instances the directional trends evident in the variogram maps are evident to some extent in plan views
of the sample data, and they normally conform to the orientation of the mineralisation within the
wireframes. As expected, variogram model ranges in the vertical direction are relatively short due to the
predominantly thin nature of the mineralisation. The majority of variograms display reasonable
structure, with anisotropies reflecting those observed in the variogram maps.
Variography was performed on the flattened dataset with the following results. Three component
models were constructed with the nugget being 303,335, sill 1 150,000, Sill 2 1,023,264 and Sill 3
9,786,987 for a target total sill of 11,259,019.
Table 3: Variogram direction parameters.
Direction
1
2
3
0
22.2
62.4
963.8
90
10.0
45.0
1,664.0
0/-90
1.6
3.9
6.8
Table 4: A six-pass search process was employed to fully populate the block model; the search
parameters are detailed.
Distance
Octants
Minimum
Samples
Thickness
1
25
2
8
1
2
50
2
8
2
3
80
2
8
4
4
120
2
4
6
5
200
1
4
10
6
200
1
4
20
Pass
Page 13 of 37
The mineral resources were created with the same original block size of 2m x 2m x 1m. This size was
chosen as a compromise between the average drill spacing (up to 40m x 40m in some areas), size of the
mineralisation wireframes (in order to limit resulting low mineralised proportions), orientation of
mineralisation (ideally, the blocks would have been orientated with the mineralisation however this
results in a model that is unusable for pit optimisation purposes), grade distribution within the
mineralisation and the models’ ultimate use for mine planning purposes. A re-blocked (to 4m x 4m x
2m) model was provided for mine planning purposes to reduce the overall size of the Mineral Resource
models, this resulted in the addition of minor amounts of dilution being incorporated into these models.
The reporting within this announcement is based on the re-blocked models to provide a more direct
comparison to any future ore reserve estimates.
In order to confirm the impact of the cutting of the sample dataset both the cut and un-cut values were
estimated in conjunction with a check, nearest neighbour estimate. Validation of the resulting model
was undertaken both visually, by comparing the local block model grades and by completing swath plots
of the model estimated grades and underlying samples. The various swath plots are shown in Figure 10
to 13.
Figure 10: East Swath Plot.
Page 14 of 37
Figure 11: North Swath Plot.
Figure 12: RL Swath Plot.
To detail the relationship between the cut, uncut and nearest neighbour estimates swath plots of the
three values were completed with the north section plot presented.
Figure 13: North Block Model Swath Plot.
Page 15 of 37
The swath plot shown in Figure 13 indicates the areas where the extreme grades occur within the
deposits, particularly at the southern end of the main, continuous Simon’s Find – Bald Hill trend.
The Mineral Resources have been classified in the Measured, Indicated and Inferred categories, in
accordance with the 2012 Australasian Code for Reporting of Mineral Resources and Ore Reserves (JORC)
by the Competent Person. A range of criteria was considered in determining the classification including
geological and grade continuity, data quality, drill hole spacing, and modelling technique and kriging
output parameters.
As a rule, the following spacings characterise the Mineral Resource classification:
•
•
•
Infill drilling between 20m by 20m and 35m by 35m – Measured Category
Drill spacing up to 50m by 50m – Indicated Category
Drill spacing 100m by 50m to 100m by 100m – Inferred Category.
Page 16 of 37
Estimated (JORC 2012) Mineral Resources – by Deposit
The following tables represent those deposits that have been re-estimated and updated from the May
2021 Mineral Resource estimate. Numbers may not add up due to rounding and are reported at a 0.24%
TREO cut-off grade within the Ore Reserve pit shell.
Table 5: Bald Hill Nb Estimated Mineral Resource, 100% Hastings Technical Metals Ltd.
Category
M Tonnes
Nb2O5 ppm
Nb2O5 t
Measured
2.37
1,035
2,451
Indicated
2.20
1,635
3,594
Inferred
0.007
735
6
TOTAL
4.57
1,325
6,6051
Table 6: Simon’s Find Nb Mineral Resource, 100% Hastings Technology Metals Ltd.
Category
M Tonnes
Nb2O5 ppm
Nb2O5 t
Measured
-
-
-
Indicated
2.16
4,375
9,455
Inferred
0.006
2,290
14
TOTAL
2.17
4,370
9,469
Authorised by the Board for the release to the ASX.
FOR FURTHER INFORMATION CONTACT:
Louis Schürmann
Charles Lew
Executive Chairman
Chief Geologist
+65 6220 9220
+61 8 6117 8629
MEDIA ENQUIRIES:
Vince Catania
General Manager - Corporate
+61 408 230 277
vince.catania@hastingstechmetals.com
Page 17 of 37
Teck Lim
Chief Financial Officer
+61 8 6117 6118
ABOUT HASTINGS TECHNOLOGY METALS LIMITED
Hastings Technology Metals Limited is a Perth-based rare earths company focused on the development
of its 100% owned Yangibana Rare Earths Project. Located in the Gascoyne region of Western Australia,
the Yangibana Project contains one of the most highly valued deposits of NdPr in the world with an NdPr
to Total Rare Earth Oxide ratio of up to 52% in some areas of the orebody.
With an initial mine life of 17 years, the Yangibana Project will become a globally significant source of
NdPr, a critical component in the manufacture of permanent magnets used in advanced technology
products including electric vehicles, renewable energy, humanoid robotics, and digital devices.
The Yangibana Project is fully permitted for immediate development and is well-timed to meet the
forecast supply gap for rare earth elements accelerated by the growth in electric vehicles and wind
turbines, both vital for the global energy transition. It will be developed in two stages with an initial focus
on the construction of the mine and beneficiation plant to produce 37,000 tonnes per annum of mixed
rare earth concentrate.
Hastings continues to assess downstream processing opportunities including the development of a
hydrometallurgical plant to capture more of the rare earth value chain. The Company holds a strategic
21.5% shareholding in TSX-listed Neo Performance Materials, a leading global rare earth processing and
advanced permanent magnets producer, providing future optionality to explore the creation of a mine
to magnet supply chain.
Hastings recognises in its geological model and mine plan the potential of a multi-commodity recovery
process stream which underpins the economic recovery of REM and associated critical minerals like
ferro-columbite, and hafnium-enriched zircon.
For more information, please visit www.hastingstechmetals.com
Competent Person Statements
The information in this announcement that relates to Mineral Resources is based on information
compiled by David Princep. Mr Princep is an independent consultant to the Company and member of
the Australasian Institute of Mining and Metallurgy (MAusIMM). Mr Princep has sufficient experience
relevant to the styles of mineralisation and types of deposits which are covered in this announcement
and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012
edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’ (“JORC Code”). Mr. Princep consents to the inclusion in this report of the matters based on his
information in the form and context in which it appears.
The scientific and technical information that relates to process metallurgy is based on information
reviewed by Mr Scott Atkinson (Principal Metallurgist – Process Development). Scott Atkinson is an
employee of the Company and a member of the Australasian Institute of Mining and Metallurgy
(MAusIMM). He has sufficient experience relevant to the style of mineralisation and type of deposit
under consideration and to the activity being undertaken to qualify as a Competent Person as defined
by the JORC (2012) Code. Mr Scott Atkinson consents to the inclusion in this announcement of the
matters based on their information in the form and context in which it appears.
The information that relates to Exploration Results is based on information reviewed and compiled by
Louis Schürmann. Dr Schürmann is an employee of the Company and is a Fellow of the Australian
Page 18 of 37
Institute of Mining and Metallurgy (FAusIMM). Dr Schürmann has sufficient experience relevant to the
styles of mineralisation and types of deposits which are covered in this report