Yangibana Project Economics Update
Integrated tolling and
offtake agreement
16 February 2024
Hastings Technology Metals Ltd | ASX:HAS
1
Picture: 3D Render of Yangibana Beneficiation Plant (Mapability)
DISCLAIMER
DISCLAIMER
This presentation has been prepared by Hastings Technology Metals Limited (“Company” or “Hastings”). This presentation is not an offer, invitation, solicitation or other
recommendation with respect to the subscription for, purchase or sale of any securities in the Company. This presentation has been made available for information purposes
only and does not constitute a prospectus, short form prospectus, profile statement or offer information statement nor does it constitute investment or financial product
advice (nor taxation, accounting or legal advice) and it is not intended to be used as a basis for making an investment decision. This presentation is provided expressly on the
basis that you will carry out your own independent inquiries into the matters contained in the presentation and make your own independent decisions about the affairs,
financial position or prospects of the Company. The Company reserves the right to update, amend or supplement the information at any time in its absolute discretion
(without incurring any obligation to do so).
To the maximum extent permitted by law neither the Company, nor its related bodies corporate, officers, their advisers, agents and employees accept any responsibility or
liability to any person or entity as to the accuracy, completeness or reasonableness of the information, statements, opinions or matters (express or implied) arising out of,
contained in or derived from this presentation or provided in connection with it, or any omission from this presentation, nor as to the attainability of any estimates, forecasts
or projections set out in this presentation. Any such responsibility or liability is, to the maximum extent permitted by law, expressly disclaimed and excluded. Nothing in this
material should be construed as either an offer to sell or a solicitation of an offer to buy or sell securities in the United States or any other jurisdiction where it would be illegal.
It does not include all available information and should not be used in isolation as a basis to invest in the Company.
FORWARD LOOKING STATEMENTS
This presentation contains reference to certain intentions, expectations, future plans, strategy and prospects of the Company. Those intentions, expectations, future plans,
strategy and prospects may or may not be achieved. They are based on certain assumptions, which may not be met or on which views may differ and may be affected by
known and unknown risks. The performance and operations of the Company may be influenced by a number of factors, many of which are outside the control of the
Company. No representation or warranty, express or implied, is made by the Company, or any of its directors, officers, employees, advisers or agents that any intentions,
expectations or plans will be achieved either totally or partially or that any particular rate of return will be achieved.
Given the risks and uncertainties that may cause the Company’s actual future results, performance or achievements to be materially different from those expected, planned
or intended, recipients should not place undue reliance on these intentions, expectations, future plans, strategies and prospects. The Company does not warrant or represent
that the actual results, performance or achievements will be as expected, planned or intended. The Company is under no obligation to, nor makes any undertaking to, update
or revise such forward looking statements, but believes they are fair and reasonable at the date of the presentation.
COMPETENT PERSONS’ STATEMENT
The information in this presentation relating to Mineral Resources and Ore Reserves have been prepared by a Competent Person in accordance with the 2012 edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (“JORC Code”) and have been extracted from the release title ‘Annual Report to
shareholders’ dated 28 September 2023 which is available to view at www.asx.com.au under the code “HAS” (the original release). The Company confirms that it is not aware
of any other new information or data that materially affects the information included in the original market announcement and that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. Hastings confirms that the form and
context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements.
The information that relates to Mineral Resources is based on information compiled by David Princep and Lyn Widenbar. Both Mr. Princep and Mr Widenbar are independent
consultants to the Company and members of the Australasian Institute of Mining and Metallurgy (AusIMM). Mr Princep and Mr Widenbar have sufficient experience relevant
to the styles of mineralisation and types of deposits which are covered in this announcement and to the activity which they are undertaking to qualify as a Competent Person
as defined in the JORC Code.
The information that relates to the Ore Reserves at Bald Hill, Simon’s Find, Fraser’s, Auer, Auer North, Yangibana and Yangibana North is based on information reviewed or
work undertaken by Mr. Stephen O’Grady. Mr O’Grady is an independent consultant to the Company and a member of the AusIMM, and a Director of Intermine Engineering
Consultants. Mr O’Grady has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the preparation of mining studies to
qualify as a Competent Person as defined by the JORC Code. Mr O’Grady consents to the inclusion in this announcement of the matters based on his information in the form
and context in which it appears.
The scientific and technical information that relates to process metallurgy is based on information reviewed by Ms. Narelle Marriott (General Manager Process Development)
of Hastings Technology Metals Limited. Ms. Marriott is a member of the AusIMM and has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined by the JORC Code. Ms. Marriott owns shares in the company and participates
in the company employee share plan. Ms. Marriott consents to the inclusion in this announcement of the matters based on their information in the form and context in which
it appears.
The information that relates to Exploration Results in relation to the Yangibana Project is based on information compiled by Dr. Louis Schürmann (PhD) (Chief Geologist) of
Hastings Technology Metals Limited. Dr. Schürmann is a Fellow of the AusIMM and has sufficient experience that is relevant to the activity being undertaken to qualify as a
Competent Person as defined in the JORC Code. The Qualified Person has verified the data disclosed in this release, including sampling, analytical and test data underlying the
information contained in this release. Dr. Schürmann consents to the inclusion in the announcement of the matters based on his information in the form and context in which
it appears.
2
STRATEGIC HIGHLIGHTS
Integrated tolling and offtake agreement supports enhanced
economics and builds on de-risking milestones for Yangibana Project
Project execution
strategy significantly
de-risked
•
•
•
•
•
Innovative tolling and
offtake agreement
providing higher
payabilities
Improved project
economics underpinned
by highly competitive
processing fees
•
•
•
•
•
•
Senior management team in place with strong track record of project delivery
Yangibana Project is ‘shovel ready’ with $120 million1 invested to date in
completion of critical non-processing infrastructure
$22 million1 invested to date in ordering long-lead critical path equipment
Engineering Procurement Construction (“EPC”) contract in place with leading
engineering and construction company GR Engineering Services
Hastings to receive rare earth oxides’ prices minus highly competitive tolling
fees for multi-stage processing of concentrate to mixed rare earth carbonate
and separated oxides
Rare earth oxides’ prices realised with lowered operational risk
96% of Hastings revenue basket comes from higher value rare earth elements
including neodymium (Nd), praseodymium (Pr), dysprosium (Dy), and terbium
(Tb)
61% increase in post-tax NPV11 to $865 million
14% increase in post-tax IRR to 31.28%
82% increase in life of mine cashflow to $3,345 million
Capital payback period reduced by 23% to 3.4 years
1As of 31 December 2023
3
Photo: Kurrbili Village at dusk
INTEGRATED TOLLING AND OFFTAKE AGREEMENT
Higher rare earth oxide revenue achieved through competitive and fixed price offshore toll processing
Increased payability for the Yangibana Project’s concentrate through outsourcing multistage processing to mixed rare earth carbonate and rare earth oxides
Key Terms
Company
Baotou Sky Rock Rare Earth New Material Co., Ltd (“Baotou Sky Rock”)
Description
Established in 2006, Baotou Sky Rock is a privately-owned Chinese
high-tech enterprise specialising in the production and research and
development of rare earth metals and permanent magnet materials.
Its main products are sintered neodymium baron and sintered
samarium cobalt magnets.
Products
Minimum of 10,000tpa of rare earth concentrate, commencing upon
Hastings’ certification that the mine has been successfully
commissioned
Term
Seven years commencing on date of execution of the term sheet, with
an option to extend for another five years at Hastings’ election
Pricing
Rare earth oxide pricing to be based on 15-day average market pricing
for neodymium, praseodymium, dysprosium and terbium oxides
recovered, less a competitive capped hydrometallurgical process and
oxide separation fee
Payment Structure
Irrevocable letter of credit
No upfront capital cost required for hydrometallurgical
and oxide separation plant
Stage 1 – Yangibana Project
Mining and Beneficiation
Rare Earth Concentrate
Integrated Tolling and Offtake Agreement
Hydrometallurgy
Mixed Rare Earth Carbonate
Indicative Domestic
Operating Costs1
~US$13 to 27/kg REO
Indicative China
Processing Costs2
Up to 75% lower
1 Source: Refer Slide 14
2 Based on integrated tolling and offtake agreement with Baotou Sky Rock
Oxide Separation
Rare Earth Oxides
~US$2 to 6/kg REO
Up to 70% lower
4
IMPROVED STAGE 1 PROJECT ECONOMICS
The Yangibana Project is fully permitted, long-life and high-margin
Robust project economics
Integrated Tolling and
Offtake Model
(February 2024)1
Profit-Sharing Model
(May 2023)
Variation
Post-tax NPV11 (ungeared)
$865 million
$538 million
61%
Post-tax IRR (ungeared)
31.28%
27.54%
14%
Payback Period
3.4 years
4.4 years
23%
Key Financial Outcomes (AUD)
Capital Costs (incl. $142 million spent as of
31 December 2023)
$503 million
$470 million
7%
Remaining Capital Costs (excl. $142 million
spent as of 31 December 2023)
$361 million
$383 million
6%
Net Revenue (LOM)
$9,639 million
$7,201 million
34%
Free Cash Flow (LOM)
$3,345 million
$1,835 million
82%
Average EBITDA per annum
$258 million
$174 million
48%
Improved metrics driven by move from previous
domestic profit-sharing model (50:50) to realising
100% of net revenue, as well as lower processing
fees under the integrated tolling and offtake
model
Mine schedule optimisation
Focus on initial five years to identify cost savings
through targeting lower strip ratio zones, while
maintaining the grade to the beneficiation plant
Concentrate dryer
Addition to suit external offtake requirements for
concentrate with a moisture content of between
6-8% - reducing concentrate transport costs
Key Material Assumptions / Updates
The Updated Stage 1 Yangibana Project Economics relies on the Base Case Financial Model
(“BCFM”) and the assumptions adopted in the Staged Development Study released in
connection with the BCFM on 31 May 2023. Those assumptions continue to apply and have not
materially changed, other than in respect of the following matters:
•
•
Stage 1 standalone: The impact of Stage 2 for the Yangibana Project (i.e. the potential
hydrometallurgical plant) is excluded from the economic analysis.
•
Mining: Mine schedule optimisation for the first five years of mining targets lower strip ratio
•
Macroeconomics: FX Forward (Bloomberg January 2024), 10-year average AUD:USD 0.65
•
Cost assumptions: Incorporation of MREC and oxide separation fees based on the fees
Offtake and payabilities: Shift from domestic profit-sharing model to rare earth concentrate
sale and third-party processing (hydrometallurgical and oxide separation) to achieve a full
rare earth oxide basket price, on terms expected in the Term Sheet for the Integrated
Arrangement. Adjustments to yields and costs may be required following pre-production
pilot test work, as contemplated in the Term Sheet.
•
Spent capital cost: $142 million of capital cost estimate incurred as of 31 December 2023
•
Commodity price: Average 10-year blended neodymium and praseodymium (“NdPr”) oxide
price (Wood Mackenzie, CRU, Adamas Intelligence) of US$121/kg real, 2024$ (reduction from
US$129/kg adopted in the Staged Development Study).
zones of the Yangibana Project’s ore bodies, while maintaining the grade to the beneficiation
plant. The mine life remains at 17 years, and annual average production of rare earth
concentrate remains at 37,000tpa (“Existing Targets”). Refer to per ASX announcements
‘Yangibana Ore Reserves Increase by 25%’ dated 6 February 2023 and ‘Corporate
Presentation – Staged Development Strategy’ dated 31 May 2023
Updated capital cost
Increase of $33 million to $503 million consisting
of additions of the concentrate dryer facility,
escalations, warranty extensions, earthwork rates,
EPC indirects and holding costs.
provided in the Term Sheet, updated power tariffs (40% renewable) from Independent
Power Producer, and other revisions for escalation
5
YANGIBANA PROJECT’S BASKET PRICE FORECAST
Based on market consultants and the expected element composition for the Yangibana Project
Average basket price and opex from first production to 20301
Consultant / source
Market
Consultant
Expected gross basket price (US$/kg TREO) (real, 2024$)1
High Case
Base Case
1
US$/kg TREO US$/kg TREO1
100
90
CRU
57.3
72.9
Adamas Intelligence
54.3
60.4
36.4
N/A
2
49.33
66.7
50
22.5
22.5
40
Woodmac
CRU, AI,
Woodmac
Blend
OpEx (incl. MREC processing and oxide
separation costs)
80
70
Blend (High Case)
60
Blend (Base Case)
30
CRU (Base)
Woodmac (Base)
Adamas (Base)
Blend (CRU/AI/WM - Base)
Opex
2-Year Historical Average
CRU (High)
Adamas (High)
CRU / Adamas Blend (High)
30-Nov-30
30-Sep-30
31-Jul-30
31-May-30
31-Mar-30
31-Jan-30
30-Nov-29
30-Sep-29
31-Jul-29
31-May-29
31-Mar-29
31-Jan-29
30-Nov-28
30-Sep-28
31-Jul-28
31-May-28
31-Mar-28
31-Jan-28
30-Nov-27
30-Sep-27
31-Jul-27
31-May-27
31-Mar-27
31-Jan-27
30-Nov-26
30-Sep-26
31-Jul-26
0
31-May-26
Yangibana Project will be one of the highest margin producers
globally once in production – first quartile on global margin
curve as assessed by CRU
10
31-Mar-26
High-value NdPr composition leads to higher realised rare
earth oxide basket price
20
31-Jan-26
Up to 52% NdPr composition in certain parts of the orebody
Yangibana Opex
1 Pricing includes 13% VAT
2 Woodmac does not publish a high case
3Hastings’ modelling adopts the blend (CRU, AI and Woodmac) base case forecast
Source: Wood Mackenzie (January 2024) Global rare earths short-term outlook, CRU (August 2023) Updated REE Prices and Margin 2023, Adamas Intelligence (Q1/2024) Rare earth pricing quarterly outlook
Average 10-year blended NdPr oxide price (Woodmac, CRU, Adamas Intelligence) of US$121/kg real 2024$
6
WORLD-CLASS ASSET
The Yangibana Project’s average NdPr:Total Rare Earth
Oxide (“TREO”) ratio surpasses most global projects
Yangibana Revenue
NdPr
Average NdPr:TREO Ratio1
3%
Sichuan (China)
3%
Dy
Tb
Other
4%
14%
Mountain Pass (US)
16%
Kangankunde (Malawi)
20%
Ngualla (Tanzania)
21%
Bayan Obo (China)
21%
Mt Weld (Western Australia)
91%
23%
Nolans (Northern Territory)
Songwe Hill (Malawi)
26%
Hastings’ Revenue Basket
96% anticipated to come from the ‘Big Four’ rare earth magnet
elements (Nd, Pr, Dy, Tb)
33%
Yangibana Project (Western Australia)
37%
‘Big Four’ Rare Earth Elements
Neodymium, praseodymium, dysprosium and terbium are
critical elements in green technologies, defence applications
and digital devices
1 Source: Refer to Slide 13 and Slide 14
7
ADVANCED PROJECT
DEVELOPMENT
8
STRONG BASE TO RAMP UP CONSTRUCTION
$142 million invested to date1 for Stage 1 of the Yangibana Project
De-risked project delivery
500
Slight increase in capital cost to $503 million due to addition
of a concentrate dryer to meet product specifications and
additional holding costs – remaining capital of $361 million
503
470
142
87
400
Development ready
Fully permitted to begin construction with first concentrate
production in 2026
$120 million invested to date1 in finalising early site works
•
Kurrbili Accommodation Village
•
Yangibana Airstrip
•
SipHon Well Borefield
•
Site Access Roads
Critical path equipment
$22 million invested to date1 in long lead items
•
•
In Transit/Delivered – SAG Mill and Regrind Mill
Fabrication – Flotation Cells, Thickener, Mill Liner Handler
1As of 31 December 2023
A$m
Non-Processing Infrastructure
300
200
383
361
100
0
May 2023
February 2024
Remaining capital cost
Spent
9
YANGIBANA PROJECT’S PROGRESS
Kurrbili Village
SipHon Borefield
Yangibana Airstrip
SAG Mill Shell
10
BENEFICIATION PLANT CONSTRUCTION
$210 million Engineering, Procurement and Construction contract in place with GR Engineering Services1
GR Engineering Services
Leading engineering and contracting
company with strong track record of
delivering integrated project solutions
Cost certainty
Fixed price component of $180 million (~85%)
Key benefits
Lowers project delivery risks, provides greater
certainty on timeframe and process and
product quality guarantees
Early works agreement
Detailed engineering and design work for
beneficiation plant ahead of schedule at 81%
complete
1 Refer ASX announcement “Hastings Reduces Yangibana Delivery Risk Awards EPC Process Plant Contract to GR Engineering”, dated 3 May 2023
11
APPENDIX
12
RESOURCES AND RESERVES
Yangibana Rare Earths Project
TOTAL JORC (2012) MINERAL RESOURCES (30 OCT 22)1
TOTAL JORC (2012) ORE RESERVES BY DEPOSIT (6 FEB 23)1
Category
mt
%TREO
%NdPr
TREO tonnes
Deposit
mt
%TREO
%NdPr
NdPr: TREO
Measured
4.97
0.96
0.37
47,721
Bald Hill
8.12
0.79
0.32
41
Indicated
19.51
0.88
0.32
171,936
Fraser’s
1.77
1.01
0.43
43
Sub-total
24.49
0.90
0.33
219,657
Simon’s Find
2.69
0.53
0.28
53
Inferred
5.45
1.05
0.31
57,298
Auer
2.83
0.96
0.34
35
TOTAL
29.93
0.93
0.32
276,955
Yangibana
1.31
0.79
0.37
47
Yangibana North
4.21
1.29
0.34
26
TOTAL
20.93
0.90
0.33
37
1 Refer ASX announcement “Yangibana Ore Reserves Increase by 25%”, dated 6 February 2023; numbers may not add due to rounding; for reference that the Ore Reserves stated is included as part of the Mineral Resources
Disclaimer: There is no certainty that further exploration work will result in the determination of Mineral Resources (or Ore Reserves)
SOURCE DOCUMENTS
References
PEER COMPRISON – NDPR:TREO RATIO
Mine
Ownership
Ticker
Stage of
Development
Capex (A$m)
Reserves
Tonnage (mt)
TREO Grade
Yangibana
Hastings Technology Metals Ltd
HAS:ASX
Pre-production
503
20.93
0.90%
Songwe Hill
Mkango Resources Ltd
MKA:TSXV
Feasibility
479
18.15
1.16%
Nolans
Arafura Rare Earths Ltd
ARU:ASX
Pre-production
1,680
29.50
2.90%
Mt Weld
Lynas Rare Earths Ltd
LYC:ASX
Production
N/A
19.7
8.60%
Bayan Obo
China Northern Rare Earth Group
High-Tech Co Ltd
600111:CH
Production
N/A
>2,200
2.55%
Ngualla
Peak Rare Earths Limited
PEK:ASX
FEED Completed
441
18.5
4.8%
Kangankunde
Lindian Resources Limited
LIN:ASX
Stage 1 Feasibility
due Q1/2024
N/A
261
(Resource)
2.19%
Inferred
20%
Mountain Pass
MP Materials Corp
MP:NYSE
Production
N/A
29.3
6.32%
16%
28 February 2023: SEC Filing: Form 10-K – Annual Report,
Sichuan
Rising Nonferrous Metals Share Co.
Ltd
Proven and
Probable
600259:CH
Production
N/A
N/A
N/A
N/A
14%
15 December 2020: Ord Minnett Report, “Hastings Tech Metals, Thematic Firing”
Category
Proven and
Probable
Proven and
Probable
Proven and
Probable
Proven and
Probable
Proven and
Probable
Proved and
Probable
NdPr:TREO ratio
37%
33%
26%
23%
21%
21%
Source
6 February 2023: ASX Announcement: “Yangibana Ore Reserves Increase by 25%”
5 July 2022: SEDAR Announcement: “Mkango Announces Results of Definitive Feasibility Study For The Songwe Hill
Rare Earths Project In Malawi - NPV of US$559.0 Million And IRR of 31.5%”
11 November 2022: ASX Announcement: "Nolans Project Update"
13 December 2023: ASX Announcement: "Arafura Rare Earths: Equity Raise Presentation"
6 August 2018: ASX Announcement: “Lynas announces a 60% increase to Mt Weld Ore Reserves, one of the world’s
richest sources of Rare Earths”
15 December 2020: Ord Minnett Report, “Hastings Tech Metals, Thematic Firing”
S&P Capital IQ Pro: Property ID 31805 Reserves and Resources
24 October 2022: ASX Announcement: “Ngualla Rare Earths Project Completion of Bankable Feasibility Study Update”
30 November 2023: ASX Announcement: “Completion of FEED Study”
3 August 2023: ASX Announcement: “Maiden Mineral Resource”
7 Feb 2024: ASX Announcement: “Indaba Mining Conference Presentation”
HYDROMETALLURGICAL AND SEPARATION COSTS OF DOMESTIC DEVELOPERS AND OPERATIONS
Mine
Ownership
Ticker
Total Costs /
Processing Costs ($m)
REO Production (tpa)
Nolans
Arafura Rare Earths Ltd
ARU:ASX
US$138m
4,919t
7 February 2019: ASX Announcement: “Nolans DFS Delivers Robust Project Economics”
11 November 2022: ASX Announcement: “Nolans Project Update”
Mt Weld
Lynas Rare Earths Ltd
LYC:ASX
A$346.2m
16,780t
12 October 2023: ASX Announcement “2023 Annual Report”
Eneabba
Iluka
ILU:ASX
A$160m
12,400t
4 April 2022: ASX: Announcement “Eneabba Rare Earths Refinery – Final Investment Decision Presentation”
Source
Note: Cost indication range was based on Hastings’ Onslow Hydrometallurgical study and desktop analysis of peers’ processing costs escalated to 2024 real$. Note estimates are a desktop study only. AUD/USD rate of 0.65 was adopted.
14
Follow us on
Hastings Technology Metals Limited
ABN 43 122 911 399
Level 6, 197 St Georges Terrace
Perth Western Australia 6000
T: +61 8 6117 6118
E: info@hastingstechmetals.com
hastingstechmetals.com
15
Share your feedback
Discover