Quarterly Activities Report March 2025
Released
Released
Announcement PDF
28 April 2025
QUARTERLY ACTIVITIES REPORT
FOR THE PERIOD ENDED 31 MARCH 2025
HIGHLIGHTS
•
Hastings and Wyloo have signed an exclusive, non-binding term sheet to enter into an
Unincorporated Joint Venture (“UJV”) for the Yangibana Rare Earths and Niobium Project (“Yangibana
Project” or the “Project”) 1.
•
Key commercial terms include:
o
60:40 UJV with Wyloo holding a 60% participating interest and Hastings’ wholly owned
subsidiary, Yangibana Jubilee Pty Ltd (“YJPL”) holding a 40% participating interest.
o
Cancellation of all Exchangeable Notes owing to Wyloo and early repayment of debt in full
ahead of maturity in October 2025.
o
Hastings retains a 40% share of revenue (rare earth, niobium and other by-product credits)
and Project cash flows.
o
UJV includes both Stage 1 of the Yangibana Project and Stage 2 Hydrometallurgical Plant.
o
Wyloo will act as the UJV Manager and Operator with an option to increase its participating
interest to 70%.
•
Wyloo brings established technical and financial credentials and the UJV provides a credible path to
funding and development with the potential for significant job and economic opportunities for the
Gascoyne region.
•
Significantly reduced remaining capital cost of $126m for Hastings’ 40% interest and residual equity
of $32 million assuming 50:50 project gearing structure.
•
Hastings will retain 100% of the Brockman Heavy Rare Earths Project, and Ark Gold tenements.
•
$2.6 million raised in March 2025 through private placement to existing shareholders and new
investors 2.
•
$6.6 million in cash and cash equivalents as at 31 March 2025.
Hastings Technology Metals Ltd (ASX:HAS) (“Hastings” or “the Company”), is pleased to report on its
development, corporate, and exploration activities for the three-month period ended 31 March 2025.
1
2
Refer ASX Announcement “Hastings Yangibana project in 60 / 40 JV with Wyloo” dated 20 February 2025
Refer ASX Announcement “Proposed Issue of Securities” dated 21 March 2025
Page 1 of 8
CORPORATE & SUSTAINABILITY
Health and Safety
A Total Recordable Injury Frequency Rate of 0.00 was maintained for the quarter.
Environment
The quarter represented a peak period of environmental statutory reporting and compliance initiatives.
This included ongoing environmental monitoring and statutory reporting in accordance with regulatory
approvals, and initiatives to support future phases of planning and site activities. Annual reporting was
completed across a range of approvals instruments, including environmental licence under Part V of the
Environmental Protection Act; implementation of conditions under the Environmental Protection and
Biodiversity Conservation (“EPBC”) Act; and annual environmental reporting and related Mine
Rehabilitation Fund (“MRF”) reporting.
An update to the existing Yangibana Works Approval under Part V of the Environmental Protection Act
was finalised, and the Department of Water and Environmental Regulation (“DWER”) granted this licence
amendment in February 2025.
Ongoing activities include statutory reporting, implementing on-site compliance monitoring and
rehabilitation, regulatory stakeholder dialogue, and supporting preparation for next phase of site
implementation.
JOINT VENTURE WITH WYLOO FOR YANGIBANA
During the quarter, Hastings executed an exclusive non-binding term sheet with respect to a UJV with
Wyloo on the Yangibana Project. The UJV with Wyloo involves the establishment of a strategic
partnership between Hastings and Wyloo, through which the parties will jointly own and participate in
the Yangibana Project as follows:
a.
Wyloo – 60% participating interest in the UJV, UJV manager and operator; and
b.
YJPL (Hastings) – 40% participating interest in the UJV with pro-rata representation on the UJV
management committee.
Page 2 of 8
Figure 1 Wyloo and Hastings teams (left to right): Teck Lim (Chief Financial Officer – Hastings), Vince
Catania (General Manager Corporate – Hastings), Luca Giacovazzi (Chief Executive Officer – Wyloo) and
Joel Turco (Chief Development Officer – Wyloo).
As part of the joint venture transaction, the parties executed a share purchase agreement (“SPA”)
pursuant to which Hastings will sell to Wyloo 8,350,311 shares held in Neo Performance Materials Inc.
(“Neo”), representing an approximate 19.99% interest in Neo (“Transferred Neo Shares”). The
Transferred Neo Shares have a value of A$79.8m 3, which was paid to Wyloo by way of a set-off against
the outstanding amount of the Exchangeable Notes.
Security over the Transferred Neo Shares has been released and these shares have been transferred to
Wyloo and Exchangeable Notes of the corresponding value have been cancelled.
Hastings’ portfolio of assets and tenements post completion is set out in Figure 2 below. This includes
40% JV participating interest in Stage 1 of the Yangibana Project and 40% of the Stage 2 downstream
Hydrometallurgical Plant Project. In addition, Hastings will retain 100% of the Brockman Niobium and
Heavy Rare Earths Project, Ark Gold and exploration tenements.
3
Converted at an AUD/CAD exchange rate of 0.9025
Page 3 of 8
Figure 1 Group Structure
FUNDING
Placement
In March 2025, the Company issued 8,281,250 ordinary fully paid shares, raising $2.6 million to fund
working capital requirements. Hastings’ Executive Chairman, Mr Charles Lew, participated in the issue
to the extent of 801,250 shares which will require shareholder approval at the next shareholders
meeting 4.
Partial Cancellation of Exchangeable Notes
Exchangeable Notes issued to Wyloo in October 2022 have been partially cancelled. A reduction in face
value of the Exchangeable Notes equal to the value of the Neo share purchase price of A$ 79,848,403
(C$72,063,184) security over the Transferred Neo Shares (8,350,311 shares) has been released.
Upon Wyloo earning a 60% participating interest in the UJV over the Project, security over the remaining
623,816 shares (1.49%) will be released and Hastings will settle the value of those shares via cash
payment to Wyloo, and the balance of the Exchangeable Notes will be completely cancelled. Hastings
has the flexibility to meet the final payment of A$6.0m by selling the remaining 623,816 Neo shares held
(current market value of A$6.0m).
4
Refer ASX Announcement “Proposed issue of securities” dated 21 March 2025
Page 4 of 8
YANGIBANA PROJECT DEVELOPMENT
Development Activities
As at 31 March 2025, 33% of the Yangibana Project’s budget remains spent to date. Main activities are
for non-process infrastructure and long-lead equipment for the beneficiation plant.
o
o
o
$474 million
$158 million (as at 31 March 2025)
$315 million (including contingency of $27 million)
Total Capital Cost Budget
Capital Expenditure Spent to Date
Remaining Capital Cost Budget
Yangibana - Updated Capital Cost Estimate
Capital cost
A$m
%
Processing Plant & NPI
201.0
42%
Enabling Works 5
114.1
24%
Subtotal - Direct Capital Cost
315.1
67%
Hastings Project Management
50.2
11%
Other Indirects
6
81.3
17%
Subtotal - Indirect Capital Cost
131.5
28%
Contingency/Reserve
26.9
6%
Total Capital Cost
473.5
100%
Incurred to 31-Dec-24
158.2
33%
Processing Plant & NPI
Enabling Works
Remaining (incl. contingency)
315.3
67%
Hastings Project Management
Other Indirects
6%
17%
42%
11%
24%
Contingency
NIOBIUM AND PROCESSING TEST WORK
The first stage of test work was successfully completed in a certified laboratory with outstanding results
upgrading the ore (0.41%, Nb2O5) to produce a concentrate with a grade of 50.59% Niobium Pentoxide
(Nb2O5).
The "end of test" flow sheet consisted of grinding the ore to P80=0.074mm, gravity separation to remove
slimes, Low Intensity Magnetic Separators to remove iron and High Intensity Magnetic Separators to
remove silicates and then flotation consisting of a rougher and 4 stage cleaner flotation.
Recovery was relatively low, as expected, during the trial process and the next stage of test work will
focus on increasing Nb recovery through optimising pre-concentration steps, optimising flotation
conditions and flotation flowsheet configuration.
Hastings is confident that additional Nb2O5 will be added to the Yangibana resource and into reserve
following this successful test work and outstanding results, and that a saleable niobium pentoxide byproduct is achievable from Yangibana ore.
5
6
Enabling works - represents: equipment, roads, aerodrome, village, borefields construction
Other indirects - represents: fuel, accommodation, IT & comms, health & safety, consultants, insurances and other
Page 5 of 8
Management Update
Mr Teck Lim resigned from his role as Chief Financial Officer of Hastings and provided support on a
consultancy basis until 24 April 2025. During his tenure, Mr Lim was involved with the development of
an integrated processing strategy, downstream development opportunities in Saudi Arabia, and the Joint
Venture with Wyloo. The Board thanks Mr Lim for his contribution and wishes him all the best in his
future endeavours.
Quarterly Expenditure
During the quarter, the Company had cash outflows on exploration and evaluation costs of $0.7 million,
and cash outflows for project development of $2.4 million. $227,175 was paid in respect of directors’
fees, salaries, and consulting fees. Hastings had $6.6 million in cash and cash equivalents as of 31 March
2025.
Authorised by the Board for release to the ASX.
FOR FURTHER INFORMATION CONTACT:
Charles Lew
Executive Chairman
+65 6220 9220
Vince Catania
General Manager, Corporate
+61 408 230 277
MEDIA ENQUIRIES:
Matt Worner
VECTOR Advisors
+61 429 522 924
mworner@vestoradvisors.au
Page 6 of 8
ABOUT HASTINGS TECHNOLOGY METALS LIMITED
Hastings Technology Metals Limited is a Perth-based rare earths company focused on the development
of its 100% owned Yangibana Rare Earths and Niobium Project. Located in the Gascoyne region of
Western Australia, the Yangibana Project contains one of the most highly valued deposits of NdPr in the
world with an NdPr to Total Rare Earth Oxide ratio of up to 52% in some areas of the orebody.
With an initial mine life of 17 years, the Yangibana Project will become a globally significant source of
NdPr, a critical component in the manufacture of permanent magnets used in advanced technology
products including electric vehicles, renewable energy, humanoid robotics, and digital devices.
The Yangibana Project is fully permitted for immediate development and is well-timed to meet the
forecast supply gap for rare earth elements accelerated by the growth in electric vehicles and wind
turbines, both vital for the global energy transition. It will be developed in two stages with an initial focus
on the construction of the mine and beneficiation plant to produce 37,000 tonnes 7 per annum of mixed
rare earth concentrate.
Hastings continues to assess downstream processing opportunities including the development of a
hydrometallurgical plant to capture more of the rare earth value chain.
Hastings recognises in its geological model and mine plan the potential for a multi-commodity recovery
process stream which underpins the economic recovery of rare earth minerals and associated critical
minerals like ferro-columbite, and hafnium-enriched zircon.
For more information, please visit www.hastingstechmetals.com
FORWARD LOOKING STATEMENTS
This release contains reference to certain intentions, expectations, future plans, strategies and
prospects of the Company. Those intentions, expectations, future plans, strategies and prospects may
or may not be achieved. They are based on certain assumptions, which may not be met or on which
views may differ and may be affected by known and unknown risks. The performance and operations of
the Company may be influenced by a number of factors, many of which are outside the control of the
Company. No representation or warranty, express or implied, is made by the Company, or any of its
directors, officers, employees, advisers, or agents that any intentions, expectations, or plans will be
achieved either totally or partially or that any particular rate of return will be achieved.
Given the risks and uncertainties that may cause the Company’s actual future results, performance, or
achievements to be materially different from those expected, planned or intended, recipients should
not place undue reliance on these intentions, expectations, future plans, strategies and prospects. The
Company does not warrant or represent that the actual results, performance, or achievements will be
as expected, planned or intended.
The Company is under no obligation to, nor makes any undertaking to, update or revise such forward
looking statements, but believes they are fair and reasonable at the date of this release.
Hastings confirms that all material assumptions underpinning the forecast financial information and production targets in the
ASX releases dated 31 May 2023 and 15 February 2024 continue to apply and have not materially changed. In addition,
production targets and forecast financial information are based on Ore Reserves and Mineral Resources (Measured and
Indicated), and no inferred mineral resources nor exploration information is included.
7
Page 7 of 8
APPENDIX – MINING TENEMENTS HELD
YANGIBANA PROJECT
Gascoyne Metals Pty Ltd (70%) /
Yangibana Pty Ltd (30%)
Tenement
Locality
Status
E09/2296
WA
Live
E09/2298
WA
Live
E09/1703
WA
Live
E09/1704
WA
Live
E09/1705
WA
Live
E09/1706
WA
Live
E09/2333
WA
Live
M09/0159
WA
Live
M09/0161
WA
Live
M09/0163
WA
Live
G09/0011
WA
Live
G09/0013
WA
Live
Yangibana Jubilee Pty Ltd (100%)
Tenement
G09/0017
G09/0018
G09/0020
G09/0021
G09/0022
G09/0026
G09/0027
G09/0028
L09/0093
L09/0095
L09/0096
L09/0097
M09/0158
M09/0162
M09/0176
M09/0178
E09/1700
E09/1943
E09/1944
E09/2018
Locality
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
Status
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Gascoyne Metals Pty Ltd (100%)
Tenement
E09/1989
E09/2007
E09/2084
E09/2086
E09/2095
E09/2129
E09/2137
E09/2334
E09/2364
E09/2403
E09/2404
G09/0010
G09/0014
G09/0023
G09/0024
G09/0025
G09/0029
L09/0066
L09/0067
L09/0068
L09/0069
L09/0070
L09/0071
L09/0072
L09/0074
L09/0075
L09/0080
L09/0081
L09/0082
L09/0083
L09/0085
L09/0086
L09/0087
L09/0089
L09/0091
M09/0157
M09/0179
Locality
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
Status
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
BROCKMAN PROJECT
ARK GOLD PROJECT
Hastings Technical Metals Ltd (100%)
Hastings Technical Metals Ltd (100%)
Tenement
E80/5248
P80/1626
P80/1628
P80/1629
P80/1630
Locality
WA
WA
WA
WA
WA
Status
Live
Live
Live
Live
Live
Tenement
E09/2385
E09/2399
Page 8 of 8
Locality
WA
WA
Status
Live
Live
Share your feedback
Discover